Ordinance No. 9,12320010308 -5 ORDINANCE NO. 9123 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 ON WORK ORDER NO.6 AND ACCEPTANCE OF THE WORK ON WORK ORDER NO. 6 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SANITARY SEWER REHABILITATION PROJECT - YEAR 2000; AUTHORIZING FINAL PAYMENT OF THE SUM OF FOUR THOUSAND FIVE HUNDRED EIGHTY - FOUR AND 41/100 DOLLARS ($4,584.41) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Project - Year 2000 (the "Project "); and WHEREAS, a deduct change order in the amount of THREE THOUSAND THREE AND 75/100 DOLLARS ($3,003.75) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Annual Sanitary Sewer Rehabilitation Project - Year 2000 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of FOUR THOUSAND FIVE HUNDRED EIGHTY -FOUR AND 41/100 DOLLARS ($4,584.41); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 on Work Order No. 6 and acceptance of the work on Work Order No. 6 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities for the Annual Sanitary Sewer Rehabilitation Project - Year 2000. A copy of said deduct change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. �11 20010308 -5a ® Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of FOUR THOUSAND FIVE HUNDRED EIGHTY -FOUR AND 41/100 DOLLARS ($4,584.41) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 8th day of March, 2001. dt' PETE C. ALFAR , Mayor ATTEST: G i- W. MIT H, City Clerk APPROVED AS TO FORM: 1W i i J LIN • . It • M dAN4yDocuments \Counci1\00 -01 WarchTinalPay knnual SanitarySewerRehab is 2 v CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #6 01!0212001 This work order included pipe bursting , service reconnections, point repair, manhole replacement and miscellaneous items related to work, clean & TV on Polly and Park Streets Ammons, Business 146 and Redell Road at W. Cedar Bayou Lynchburg. EXHIBIT A Co1wo6 pagel Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 1138 1103 -35 S 38.00 $ (1,330.00) 2 Pipe bursting 6" & 8" with 8' HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 40.00 $ 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 S 45.00 $ 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ 13 Remove existing slipliner, all sizes and depths LF 0 0 0 $ 5.00 $ 14 Reconnect service - short side, 0' -8' deep EA 29 25 -4 $ 500.00 $ (2,000.00) 15 Reconnect service - short side, over 8' deep EA 0 0 0 $ 700.00 $ 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1,500.00 $ 181 Manhole Wall Sealing VF 14 11.33 -2.67 $ 85.00 $ (226.95) 19 Replfinstall new manhole, 0' -8' deep EA 2 2 0 $ 1,500.00 $ 20 New Manhole , over 8' deep VF 0 0 0 $ 200.00 $ 21 Replace /install ring and cover EA 0 0 0 $ 300.00 $ 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 70 33.13 -36.87 $ 20.00 $ (737.40) 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 1 1 0 $ 300.00 $ 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 0 0 $ 400.00 $ 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ 271 Well Point set up, up to 12 If EA 0 01 0 $ 2,800.00 $ 28 Well Point, Extra length over 12 If LF 0 0 0 $ 20.00 $ EXHIBIT A Co1wo6 pagel CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #6 ® 01/02!2001 This work order included pipe bursting , service reconnections, point repair, manhole replacement and miscellaneous items related to work, clean & TV on Polly and Park Streets Ammons, Business 146 and Redell Road at W. Cedar Bayou Lynchburg. v 29 Trench Safety, 0' to 8' deep LF 60 0 -60 $ 1.00 $ (60.00) 30 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ - 32 Clean 6" to 12" Sewer LF 602 893 291 $ 3.00 $ 873.00 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ - 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 602 893 291 $ 1.00 $ 291.00 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ - 39 Bypass Pumping, 8" pump Day 0 0 0 $ $ - 40 Pt. Repair, 6" - 12 ", 0' - 8' deep, up to 12 If EA 0 1 1 $ 1,250.00 $ 1,250.00 41 Pt. Repair, 6" - 12 ", 8' - 1S' deep 1 up to 12 If EA 0 0 0 $ 1,750.00 $ 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0'- 8' deep up to 12 If EA 0 0 0 $ 2,250.00 $ - 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21" - 36 ", 0'- 8' deep up to 12 If EA 1 0 -1 $ 4,000.00 $ (4,000.00) 47 Pt_ Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ - 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 01 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep ' LF 0 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, ,8'- 15' deep LF 0 0 0 $ 120.00 $ - 51 Extra length pt. Repair, all sizes, overly' deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6"- 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 37 37 $ 65.00 $ 2,405.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 01 0 0 $ 75.00 $ - 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15"- 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 S. 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 45.00 $ Co1wo6 page2 LJ Co1wo6 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #6 01/02/2001 This work order included pipe bursting , service reconnections, point repair,.manhole replacement and miscellaneous items related to work, clean & TV on Polly and Park Streets Ammons, Business 146 and Redell Road at W. Cedar Bayou Lynchburg. 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 12 25.72 13.72 $ 30.00 $ 411.60 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 $ 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ - 66 Hydromulch Seeding SY 160 200 40 $ 3.00 $ 120.00 67 Bypass Pumping, 6" or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" 12" LF 0 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 0 0 $ 100.00 $ 71 Drop manhole assembly, up to 8 deep EA 0 0 0 $ 2,500.00 $ 7 Drop manhole assembly, over 8' deep VF 0 A 0 $ 500.00 $ 73 Emergency mobilization EA 0 $ 1,000.00 $ Total Change Order #1 A'- a is,vvo.ra1 . �Z P.M Construction Oate {1(rectorr of Engineering Date Finance Date City manager Date Work Order Summary: Final Construction Cost W06 $ 67,938.25 Initial Work Order #6 $ 70,942.00 Change Order #1 $ (3,003.75) page3 CITY OF- BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT -Year 2000 ..a 0 sConstruction and Rehabilitation, L.P. East Erath ton, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date February 27, 2001 (Invoice Date) Work Order #6, Total Time Allowed: 20 Working Days Total Time Used: 11 Working Days Item Description Unit Est. W06 Quant. P.E.1 Quantities P.E.2 Quantities Total to date Unit Price Total this Estimate 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 1138 1103 0 1103 $ 38.00 $41,914.00 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 40.00 $0.00 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 42.00 $0.00 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 45.00 $0.00 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 0 $ 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 0 0 0 0 $ 5.00 $0.00 14 Reconnect service - short side, 0' -8' deep EA 29 25 0 25 $ 500.00 $12,500.00 151 Reconnect service - short side, over 8' deep EA 0 0 0 0 $ 700.00 $0.00 161 Reconnect service - long side, 0' -8' deep EA 0 0 0 0 $ 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 14 11.33 0 11.33 $ 85.00 $963.05 19 20 Repl/install new manhole, 0' -8' deep New Manhole , over 8' deep EA VF 2 0 2 0 0 0 2 0 $ 1,500.00 $ 200.00 $3,000.00 $0.00 21 Replace/install ring and cover EA 0 0 0 0 $ 300.00 $0.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 70 33.13 0 33.13 $ 20.00 $662.60 23 Point Rpr /obst nnv - pipe bursting, 0'- 8' dee EA 1 1 0 1 $ 300.00 $300.00 24 Point Rpr /abst rmv - pipe bursting, 8'- 15' deep EA 0 0 0 0 $ 400.00 $0.00 25 Point Rpr /obst rrnv - pipe bursting, over 15' deep EA 0 0 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depths LF 0 0 0 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 60 0 0 0 $ 1.00 $0.00 30 Trench Safety, 8'to 15' deep LF 0 0 0 0 $ 1.00 $0.00 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 Clean 6" to 12" Sewer LF 602 893 0 893 $ 3.00 $2.679.00 Clean 15" to 21" Sewer LF 0 0 0 0 $ 5.00 $0.00 432 Clean 24" to 36" Sewer LF 0 0 0 0 $ 10.00 $0.00 TV Inspection of Sewer LF 602 893 0 893 $ 1.00 $893.00 Bypass Pumping, 3" pump Day 0 0 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day 0 0 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day . 0 0 0 0 $ - $0.00 pe2wo6final n CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 P_ay_Estimate No. 2 (final) Pay Estimate Cut-off date February 27, 2001 (Invoice Date) Work Order #6, Total Time Allowed: 20 Working Days Total Time Used: 11 Working Days Est,' . P.E.1 I P. E.2 Total unit i ozai cnis I Item Description L�qi! Qua'A.. ' uantities Quantities to date Price Estimate F-1� L P.M. Construction D e - Asst. Director of Engineering Date Contract Summary: Current Work Order #6 Amount Less 0% Retainage Less Previous Payments Current Amount Due C7 $67,938.25 $ (63,353.84) $ 4,584.41 pe2wo6final