Loading...
Ordinance No. 9,0782001111 -5 ORDINANCE NO. 9078 ® AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AMENDING ORDINANCE NO. 9045, PASSED ON THE 30TH DAY OF NOVEMBER, 2000, TO AUTHORIZE CHANGE ORDERS NO. 1 TO EACH WORK ORDER 1, 2, 3 AND 4 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SANITARY SEWER REHABILITATION CONTRACT — YEAR 2000; AUTHORIZING AN ADDITIONAL SIXTEEN THOUSAND NINE HUNDRED SEVENTY -SEVEN AND 19/100 DOLLARS ($16,977.19) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., PURSUANT TO SUCH CHANGE ORDERS, MAKING FINAL PAYMENT FOR THE CONTRACT TOTAL ONE HUNDRED TWENTY -FOUR THOUSAND SIX HUNDRED FORTY AND 54/100 DOLLARS ($124,640.54); PROVIDING A REPEALING CLAUSE; CONTAINING A SAVINGS CLAUSE; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Contract — Year 2000 (the "Project "); and WHEREAS, deduct change orders for Work Orders 1, 2, 3, and 4 under this contract in the amount of TWELVE THOUSAND TWO HUNDRED SEVENTY -ONE AND 25/100 DOLLARS ($12,271.25) were authorized in Ordnance No. 9045, passed on November 30, 2000; and WHEREAS, the correct amount of the change order for Work Orders 1, 2, 3, and 4 should have been FIVE THOUSAND FIVE AND 00 /100 DOLLARS ($5,005.00) to reflect the actual quantities used in the Project; and WHEREAS, the City Council authorized final payment and the City has made payment in the amount of ONE HUNDRED SEVEN THOUSAND THREE HUNDRED SIXTY -FOUR AND 28/100 DOLLARS ($107,364.28) pursuant to Ordinance No. 9045; and WHEREAS, there: remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of SEVENTEEN THOUSAND TWO HUNDRED SEVENTY -SIX AND 26/100 DOLLARS ($17,276.26) for the work performed for the Project; NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby amend Ordinance No. 9045, passed on the 30th day of November, 2000, by authorizing Change Orders No. 1 to each Work Order 1, 2, 3 and 4 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities and accept the work performed under Work Orders 1, 2, 3 and 4 for the Annual Sanitary Sewer ® Rehabilitation Contract — Year 2000. A copy of each deduct change order is attached hereto, marked Exhibits "A," `B" "C," and "D" and made a part hereof for all intents and purposes. 2001111 -5a ® Section 2: That payment to P.M. Construction and Rehabilitation, L.P., in the amount of SEVENTEEN THOUSAND TWO HUNDRED SEVENTY -SIX AND 26/100 DOLLARS ($17,276.26) is hereby authorized, making ONE HUNDRED TWENTY -FOUR THOUSAND SIX HUNDRED FORTY AND 54/100 DOLLARS ($124,640.54) the total contract price for the Project. Section 3: All ordinances or parts of ordinances inconsistent with the terms of this ordinance are hereby repealed; provided, however, that such repeal shall be only to the extent of such inconsistency and in all other respects this ordinance shall be cumulative of other ordinances regulating and governing the subject matter covered by this ordinance. Section 4: If any provision, section, exception, subsection, paragraph, sentence, clause or phrase of this ordinance or the application of same to any person or the set of circumstances, shall for any reason be held unconstitutional, void or invalid, such invalidity shall not affect the validity of the remaining provisions of this ordinance or their application to other persons or sets of circumstances and to this end all provisions of this ordinance are declared to be severable. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 11th day of January, 2001. ATTEST: GARY V. S - , City Clerk APPROVED AS TO FORM: C4��/Ico� - ACIO RAMIREZ, ., City Attorney PETE C. ALFARO, Mayor ® c:k1h258\ Council\ Ordinances\ AmendingAnnualSanitarySewerFinalPayment 2 P� Cotwol CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #1 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews, Kilgore. Walker @ Cline and Civic Drive. EXHIBIT A pagel Ong. Final Cost Item Description Unit Quant Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8' HOPE min. SOR 17, 0'-8' deep LF 2358 2062 -296 S 38.00 $(11,248.00) 2 Pipe bursting 6' & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF. 2700 2179 -521 S 40.00 $(20,840.00) 3 Pipe bursting 6" & 8' with 8' HOPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 S 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0'-8' deep LF 0 0 0 S 42.00 $ 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 01 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ 7 Pipe bursting 10" & 12' with 12' HOPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 S 9 Pipe bursting 10' & 12' with 12' HOPE min. SDR 17, over 15' deep LF 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 210 210 $ 75.00 S 15,750.00 11 Pipe bursting 12' & 15" with 15' HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 2631 264 1 $ 85.00 $ 85.00 12 Pipe bursting 12' & 15' with 15' HOPE min. SDR 17, min, PVC ISOR 26, over 15' deep LF 0 .01 0 $ 100.00 S - 13 Remove existing slipliner, all sizes and depths LF 1032 2408 1376 $ 5.00 $ 6,880.00 14 Reconnect service - short side, 0'-8' deep EA 28 34 6 $ 500.00 $ 3,000.00 15 Reconnect service - short side, over8'deep EA 50 38 -12 $ 700.00 $ (8,400.00) 16 Reconnect service - long side, 0' 18'deep EA 0 0 0 S 1.200.00 $ 17 Reconnect service - long side, over 8' deep EA 1 0 0 0 $ 1,500.00 $ 181 Manhole Wall Sealing VF 145 123.53 -21.47 $ 85.00 S (1,824.95) 19 Repl/install new manhole, 0'-8' Ideep EA 3 1 -2 $ 1,500.00 $ (3,000.00) 201 New Manhole. over B' deep VF 1 1 0 $ 200.00 $ - 211 Replace/install ring and cover EA 0 1 1 $ 300.00 $ 300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 70 151.72 81.72 $ 20.00 S 1,634.40 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 1 01 3 3 $ 300.00 $ 900.00 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 oil 01 $ 400.00 S 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 S 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 S 27 Well Point set up, up to 12 If EA 2 0 -2 S 2,800.00 $ (5,600.00) 28 Well Point, Extra length over 12 If LF 201 0 -20 $ 20.00 S (400.00) 29 Trench Safety, 0' to 8' deep LF 200 20 180 $ 1.00 $ (180.00) EXHIBIT A pagel Cotwot CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #1 11/2212000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews, Kilgore, Walker @ Cline and Civic Drive. 30 Trench Safety, 8' to 15' deep LF 2251 233 8 5 1.00 S 8.00 31 Trench Safety, 8' to 15' deep LF 01 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 01 9891 989 S 3.00 $ 2.967.00 33 Clean 15" to 21" Sewer LF 01 01 0 S 5.00 S - 34 Clean 24" to 36" Sewer LF OF— 01 0 S 10.00 S - 35 TV Inspection of Sewer LF 01 9891 989 $ 1.00 $ 989.00 36 Bypass Pumping, 3" pump Day 01 91 9 $ 1.00 S 9.00 37 Bypass Pumping, 4" pump Day 01 01 0 $ 1.00 $ - 38 Bypass Pumping, 6" pump Day 01 1 0 $ - $ 39 Bypass Pumping, 8" pump Day 01 01 0 S $ - 40 Pt. Repair, 6' - 12', 0'- 8' deep, up to 12 ff EA 0 3 3 $ 1,250.00 S 3,750.00 41 Pt. Repair, 6" - 12 ', 8'- 15' deep, up to 12 If EA 0 6 6 S 1,750.00 S 10,500.00 42 Pt. Repair, 6' - 12 ", over 15' deep. up to 12 If EA 0 0 0 S 2.500.00 $ - 43 Pt. Repair, 15" - 18', 0' - 8' deep, up to 12 If EA 0 1 1 S 2.250.00 S 2.250.00 44 Pt. Repair, 15' - 18', 8' - 15' deep, up to 12 If EA 0 0 01 S 2.900.00 S - 45 PL Repair, 15' - 18', over 15' deep, up to 12 If EA 0 0 0 $ 3.500.00 $ 46 PL Repair, 21' - 36 ', 0' - 8' deep, up to 12 If EA 0 0 0 S 4,000.00 $ - 47 Pt. Repair, 21' - 36 ", 8'- 15' deep, up to 12 If I EA 0 01 0 $ 6,000.00 $ 48 Pt. Repair, 21' - 36', over 15' deep, up to 12 If I I EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 .. 0 0 S 80.00 S 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 0 S 120.00 S- 51 Extra length pL Repair, all sizes, overl5'deep LF 0 0 0 S 160.00 $ 52 Rmv /Rplace 6" - 12', includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 01 0 0 $ 65.00 S 53 Rmv /Rplace 6" - 12", includes modified bedding, 8' - 15' deep, 50 L.F. min. LF 0 0 0 S 75.00 S 54 Rmv /Rplace 6" - 12", includes modified bedding, over 15 deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 01$ 75.00 $ 56 Rmv /Rplace 15" - 18", includes modified bedding, 8' - 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 S 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 $ 125.00 S 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 S 60 Rmvlreplace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 45.00 1 S page2 I El Colwo1 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #1 11/2212000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews. Kilgore, Walker aQ Cline and Civic Drive. 61 Isawcutting Rmv /replace up to5' concrete sidewalk/driveway (includes & reinforcement) SY 0 0 0 S 60.00 $ 62 Rmv /repi up to 2' HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 22.26 22.26 S 30.00 $ 667.80 63 1' rock with no fines for bedding (incidental to point repairs) TON 10 6 -4 $ 20.00 $ (80.00) 64 Annular and void space grouting CY 6 0 -6 $ 100.00 $ (600.00) 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ 66 Hydromulch Seeding SY 480 420 -60 $ 3.00 $ (180.00) 67 Bypass Pumping, 6' or greater Day 2 0 -2 $ 1.00 $ (2.00) 68 Root & tuberculation removal, 6' - 12' LF 01 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12' - 24' LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12', above ground, coated and wrapped, including supports Drop manhole assembly, up to 8' deep Drop manhole assembly, over 8' deep Emergency mobilization LF 0 0 0 $ 100.00 $ - 71 EA 01 0 0 $ 2,500.00 $ - 72 VF 0 0 0 $ 500.00 $ - 73 EA 0 0 0 $ 1,000.00 $ - Total Change O r #1 M Construction— Date Finance Date Work Order Summary, Final Construction Cost $ 298,546.25 Initial Work Order $ 301.211.00 Change Order #1 S (2,664.75) Director of Engineering Date City manager Date S (2,6 .75) page3 CITY OF BAYTOWN • i Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 404 East Erath uston, Texas 77012 Pay Estimate No. 4 final Pay Estimate Cut -off date November16,2000 (Invoice Date) Work Order #1 rev., Total Time Allowed: 60 Working Days Total Time Used: 52 Working Days Item Description Unit Est. VV01 Quant. P.E.1 Quantities P.E.2 P.E.3 P.E.4 Total Quantities Quantities Quantities ( to Date Uni; Price Total I Estimate I I I I I ! I I I I I I 1 I Pipe bursting 6" & 8" with 8" HOPE min. SDR 1 17,0'- 8'deep LF 1 2358 0 1606 G 456 2062 S 38.001 578'56.0( 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17. 8' -15' deeo LF 2700 1163 1016 0 0 2179 S 40.00 587,160.01 3 Pipe bursting 6" & 8' with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 0 I 0 5 45.00 S0.0( 41 Pipe bursting 8" & 10" with 10" HOPE min. SOR 17, 0' -8' deep LF 0 I 0 0 0 0 I 0 S 42.00 SO.GI S,SDR (Pipe bursting 8" & 10" with 10" HOPE min. 17. 8' -15' deep LF 0 0 0 0 0 I 0 S 45.00 SO.O( 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 0 G 0 S 50.00 SO.01 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17. 0'-8' deep LF 0 0 I 0 0 0 0 S 55.00 S0.01 8 Pipe bursting 10" & 12" with 12" HOPE min. SOR 17, 8' -15' deep LF 0 0 0 0 0 0 S 60.00 50.01 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 0 I 0 S 75.00 50.01 101SOR fPipe bursting 12" & 15" with 15" HOPE min. 17, min, PVC SDR 26, 0'-8' deep LF 0 1 0 0 I 210 0 210 $ 75.00 515.750.0( 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 263 C 264 0 0 264 S 65.00 I 522.440.0( 12IPipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 0 0 $ 100.00 $0.0( 13 Remove existing slipliner, all sizes and depths LF 1032 1- 163 1245 1 0 0 2408 S 5.00 512.040.0( 14 Reconnect service - short side, 0'-8' deep EA I 28 0 129 1 a 34 S 500.00 $17.000.0( 151 Reconnect service - short side. over 8' deep EA 50 22 16 0 0 38 S 700.00 $26,600.0( 16 Reconnect service - long side. 0'-8' deep EA 0 1 0 0 0 0 0 S 1,200.00 50.0( 17 Reconnect service - long side, over 8' deep EA 0 I 0 1 0 0 0 0 1 S 1.500.00 18 Manhole Wall Sealing LF 145 0 0 1 72.67 1 50.66 1 123.53 S 85.00 $10,500.0; 19 Reol /install new manhole. 0' -8' deep EA 3 I 0 1 0 I 0 I 1 $ 1,500.00 51,500.01 20 New Manhole , over 8' deep VF 1 I 0 1 0 0 1 1 $ 200.00 5200.01 21 I Replace install ring and cover EA 0 0 0 I 0 1 1 1 1 S 300.00 $300.01 221 Extra cement stabilized sand backfill, 2 sk. /ton TON I 70 I 29.63 I 122.0g 0 0 1 151.72 I S 20.00 53.034.41 231 Point Rpr /obst rmv - pipe bursting, 0' - 8' deep EA 1 0 0 0 3 0 I 3 S 300.00 5900.0( 241Point Rpr /obst rmv - pipe bursting, 8' - 15' EA 1 0 I 0 I 0 0 I 0 I 0 S 400.00 S0.0( 25 Point Rprlobst rmv - pipe bursting, over 15' deeo EA ! 0 0 0 0 I 0 0 $ 500.00 $0.01 26 )Extra Length point repair, all depths LF 0 1' 0 1 0 0 I 0 1 0 I$ 60.00 S0.0( 27 Well Point set up, up to 12 If EA 2 I 0 0 1 0 0 I C I S 2.800.00 $0.01 281 Well Point, Extra length over 12 If LF 20 1 0 I 0 0 0 1 0 I S 20.00 S0.0( 29 Trench Safety. 0' to 8' deep LF 1 200 I 0 j 0 1 20 1 0 I 20 5 t.00 1 $20.01 30 Trench Safety, 8' to 15' deep I LF 1 225 1 110 123 G 0 1 233 1 S 1.00 5233.01 31 ITrench Safety, 8' 10 15' deep LF 0 0 1 0 I 0 0 0 S 1.00 50.01 32 Clean 6" to 12" Sewer LF 0 1 0 I 989 0 0 1 989 1 S 3.00 $2.967.0( 33 Clean 15" to 21" Sewer L. j 0 1 0 i 0 o 0 0 1 S 5.00 $0.0( 3410ean 24" to 36" Sewer LF 0 1 0 1 0 1 0 0 ! 0 I S 10.00 50.0( 3517V Inspection of Sewer LF 1 0 1 0 989 1 0 0 ! 989 1 S 1.00 5989.0( 1 3618yoass Pumping, 3" pumo Day 1 0 1 E 1 0 I 0 1 9 1 S 1.00 S9.0( 371Byoass Pumping, 4" pumo I Day 1 0 0 I 0 1 0 0 J 0 1 S 1.00 I $0.0( 38 TBypass Pumping. 6" pump Day 1 0 0 1 0 0 1 0 j 0 5 - 1 SO.O( 391 Bypass Pumping. 8" pump i Oav 0 1 0 0 0 0 I 0 $ - 50.0( 401 Pt. Repair, 6" - 12 ". 0' - 6' deep, up to 12 If 1 EA i 0 I 0 I 3 0 0 ( 3 5 1.250.00 53.750.0( 41 1Pt. Repair, 6" - 12'. 8' . 15' deep, up to 12 If EA I 0 I 0 j 6 0 0 6 5 1,750.00 I $10,500.0( 421Pt. Reoair. 6" - 12 ". over 15' deeo. up to 12 If I EA I 0 j 0 0 I 0 1 0 1 0 S 2.500.00 1 50.0( 431 Pt. Reoair. 15" - 18', 0'- 8' deep, up to 12 If EA 0 0 0 I 1 G 1 J 5 2.250.00 52.250.01 441Pt. Repair. 15" - 18 ", 8'- 15' deep. up to 12 If EA I C I 0 I 0 0 0 0 5 2.900.00 I $0.0( 45IPL Reoair, 15" - 18". over 15' deep. uo to 12 If EA 1 0 0 0 I 0 0 0 S 3,500.00 I SO.O( 1 461 Pt Repair. 21" - 3E" 0'- 8' dee^ uo to 12 If I 0 0 j 0 0 j 0 1 0 1 S 4.000.00 1 50.01 pe4wol final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. East Erath ton, Texas 77012 Pay Estimate No. 4 final Pay Estimate Cut -off date November16,2000 (Invoice Date) Work Order R1 rev., Total Time Allowed: 60 Working Days Total Time Used: 52 Working Days Item Description Unit Est WO1 Quant. P.E .1 Quantities P.E.2 I Quantities P.E.3 P.E.4 Total Quantities Quantities I to Date Unit Price Total I Estimate 471Pt. Repair. 21" - 36 ". 8'- 15' deep. uo to 12 If I EA 0 I 0 1 0 I 0 I 0 1 0 S 6.000.00 $0.00 48IPt Repair. 21" - 36 ", over 15' deep, uo to 12 If EA 0 77 0 0 0 0 $ 8.000.00 50.00 49 Extra length pt. Repair, all sizes. 0' - 8' deep LF 0 0 0 I 0 0 0 S 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 0 0 0 0 S 120.00 $0.00 51 Extra length pt. Repair, all sizes. overl5' deep LF 0 0 0 0 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6' - 12 ", includes modified bedding, 0' - 8' deep. 50 L. F. min. LF 0 0 0 0 0 0 S 65.00 50.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep. 50 L.F. min. LF 0 0 0 0 0 0 S 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 LF. min. LF 0 0 0 0 0 0 S 1,000.00 50.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep. 50 L.F. min. LF 0 0 I 0 0 0 0 S 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50-L.F. min. LF 0 0 0 0 0 0 S 100.00 $0.00 57 Rmv /Rplace 15"- 18 ", includes modified bedding, over 15' deep. 50 L.F. min. 0 0 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10". all depths LF 0 0 0 0 0 0 S 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 0 0 $ 150.00 $0.00 60 Rmv /replace up toy" concrete sidewalkidriveway (includes sawcutting & reinforcement) SY 0 0 0 0 0 0 S 45.00 $0.00 61 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 0 0 0 S 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat base repair) SY 0 0 22.26 0 1 0 22.26 $ 30.00 $667.80 53 1" rock with no fines for bedding (incidental to point repairs) TON 10 0 6 0 0 6 S 20.00 $120.00 64 Annular and void space grouting CY 6 0 0 0 0 0 $ 100.00 I $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 0 0 I $ 20.00 $0.00 66 Hydromulch Seeding SY I 480 180 240 0 0 420 $ 3.00 $1.260.00 67 Bypass Pumping, 6" or greater Day 2 0 0 0 0 0 I $ 1.00 $0.00 68 Root & tubercutation removal. 6" - 12" LF 0 0 0 0 0 0 $ 10.00 $0.00 691 Root & tuberculabon removal, 12" - 24" LF 0 0 0 0 0 0 $ 20.00 $0.00 70 Steel Casing, up to 12", above ground, coated and wrapped, including supports LF 0 0 0 0 0 0 S 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 0 I 0 0 0 $ 2.500.00 $0.00 721 Drop manhole assembly. over 8' deep VF 0 0 0 0 0 I 0 S 500.00 $O.00 731 Emergency mobilization EA 0 0 I 0 0 0 0 S 1.000.00 $0.00 I I Total - ;.. ' ; $298.546.25 Less 0% Retainage - 3 $ Less Total Previous Payments on WO 1 $(260.881.54) Payment Due This Estimate ra v ; " -IM-2-1 W.t�' ift 1 S 37,664.71 Construction ate Contract Summary: Current Work Order #1 Amount $298,54625 Less 5% Retainage $ Less P.E- 1 S (65,531.57) Less P.E. 2 $ (171,016.72) Less P.E. 3 $ (24,33325) Current Amount Due 537,664.71 Asst Director of Engineering pe4w01 final r El Co1wo2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #2 11122/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lazy lane, Neal Street and Nolan Road. EXHIBIT B pagel Orig. Final Cost Item Description Unit QuanL Quant. Diff. Price Difference 1 Pipe bursting 5" & 8" with 8" HOPE min. SDR 17, 0'-8' deep LF 2570 3613 1043 $ 38.00 $ 39,634.00 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 1100 0 -1100 $ 40.00 $(44,000.00) 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 01 285 285 $ 45.00 $ 12,825.00 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ - 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 55.00 $ 8 Pipe`bursting 10" & 12" with 12' HDPE min. SDR 17, 8' -15' deep LF 01 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ - 12 Pipe bursting 12" & 15" with 15' HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ - 13 Remove existing slipliner, all sizes and depths LF 500 480 -20 $ 5.00 $ (100.00) 14 Reconnect service - short side, 0'-8' deep EA 72 91 19 $ 500.00 $ 9,500.00 15 Reconnect service - short side, over 8'deep EA 23 2 -21 $ 700.00 $(14,700.00) 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1.500.00 $ 18 Manhole Wall Sealing VF 57 36.75 -20.25 $ 85.00 $ (1,721.25) 19 Repl/install new manhole, 0'-8' deep EA 2 4 2 $ 1,500.00 $ 3,000.00 20 New Manhole, over 8' deep VF 0 0 0 $ 200.00 $ 21 Replacefinstall ring and Cover EA 0 1 1 $ 300.00 $ 300.00 22 Extra cement stabilized sand backfrll, 2 sk.fton TON 0 218.1 218.1 $ 20.00 $ 4,362.00 23 Point Rprlobst nnv - pipe bursting, 0'- 8' deep EA 0 11 11 $ 300.00 $ 3.300.00 24 Point Rprlobst nnv - pipe bursting, 8'- 15' deep EA 0 1 1 $ 400.00 $ 400.00 25 Point Rprlobst mry - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ 27 Well Point set up, up to 12 If EA 0 0 0 $ 2,800.00 $ 28 Well Point, Extra length over 12 H LF 1 01 0 0 $ 20.00 1 $ 291 Trench Safety, 0' to 8' deep LF 1 2001 255 55 $ 1.00 1 $ 55.00 EXHIBIT B pagel Coiwo2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #2 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lary lane, Neal Street and Nolan Road. 30 Trench Safety, 8' to 15' deep LF 160 45 -115 $ 1.00 $ (115.00) 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 1870 1617 -253 $ 3.00 $ (759.00) 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 1870 1617 •253 $ 1.00 $ (253.00) 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ - 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ $ 40 Pt. Repair, 6" - 12". 0'- 8' deep, up to 12 If EA 2 0 -2 $ 1,250.00 $ (2,500.00) 41 Pt. Repair, 6" - 12", 8'- 15' deep, up to 12 If EA 31 1 -2 $ 1,750.00 $ (3,500.00) 42 Pt. Repair, 6"- 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18', 0'- 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15" - 18 ", 8' - 15' deep, up to 12 If EA 0 01 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21"- 36', 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6.000.00 $ 48 PL Repair, 21" - 36", over 15' deep, up to 12 If EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 1 1 $ 120.00 $ 120.00 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 $ 160.00 $ - 52 Rmv /Rplace 6" - 12', includes modified bedding, 0' - 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6" - 12", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 54 Rmv /Rplace 6" - 12", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ - 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ - 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8' - 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ - 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 01 0 0 $ 45.00 $ - page2 P. Co1wo2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #2 11122!2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lary lane, Neal Street and Nolan Road. 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /rep! up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 60.91 60.91 $ 30.00 $ 1,827.30 63 1' rock with no fines for bedding (incidental to point repairs) TON 0 01 0 $ 20.00 $ - 64 Annular and void space grouting CY 0 0 0 S 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ - 66 H dromulch Seeding SY 500 400 -100 $ 3.00 $ (300.00) 67 Bypass Pumping, 6' or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" - 12- LF 0 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12' - 24' LF 0 0 0 $ 20.00 $ - 70 Steel Casing, up to 12 ', above .. ground, coated and wrapped, including supports Drop manhole assembly, up to LF 0 0 0 $ 100.00 S 71 8' deep Drop manhole assembly, over 8' EA 0 0 0 $ 2,500.00 $ - 72 deep Emergency mobilization VF 0 0 0 $ 500.00 $ - 7 3 EA 0 0 0 $ 1,000.00 $ e 7 iTc na Total Change Order Construction Date Director of Engineering Date Finance Date City manager Date Work Order Summary: Final Construction Cost $ 228,570.05 Initial Work Order $ 221,195.00 Change Order #1 $ 7,375.05 page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Construction and Rehabilitation, L.P. 4 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18 Working Days Item Description Unit Est. W02 Quant. P.E.1 Quantities P.E. 2 Quantities Total Quantities Unit Price Total this Estimate 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 1 2570 1 3613 0 36131 S 38.00 $137,294.0( 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 1100 0 0 0 S 40.00 50.0( 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 O $ 45.00 SO.0( 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0 S 42.00 50.0( 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 285 0 285 $ 45.00 $12,825.0( 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 $0.0( 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0'-8' deep LF 0 0 0 O $ 55.00 50.0( 8 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 60.00 S0.0C 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.0C 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 0 $ 75.00 $0.0C 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 0 $ 85.00 S0.0C 12IPipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 S 100.00 S0.0C 13 Remove existing slipliner, all sizes and depths LF 500 480 0 480 $ 5.00 52,400.0[ 14 Reconnect service - short side, 0' -8' deep EA 72 91 0 91 S 500.00 545,500.0C 15 Reconnect service - short side, over 8' deep EA 23 2 0 2 S 700.00 51,400.0( 16 Reconnect service - Iona side, 0' -8' deep EA 0 0 01 0 $ 1,200.00 S0.0C 17 1 Reconnect service - long side, over 8' deep EA 1 0 0 0 01 S 1,500.00 SO.00 18 Manhole Wall Sealing VF 1 57 15.25 21.51 36.751 S 85.00 53,123.7E 19 Repl /install new manhole, 0' -8' deep EA 2 4 01 41 S 1,500.00 56,000.0( 201 New Manhole , over 8' deep VF I 0 0 I 0 01 S 200.00 S0.0C 211 Replace/install ring and cover EA 0 1 0 1 1 S 300.00 $300.00 221 Extra cement stabilized sand backfill, 2 TON 1 0 218.1 0 218.11 S 20.00 54,362.0C 231 Point Rpr /obst rmv - pipe bursting, 0' - 8' EA 0 11 0 11 S 300.00 $3,300.00 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' EA 0 1 01 1 S 400.00 5400.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 0 $ 500.00 S0.0C 26 Extra Length point repair, all depths LF 0 0 01 01 s 60.00 S0.0C 27 Well Point set up, up to 12 If EA 1 0 0 01 01 S 2,800.00 $0.0C 281Well Point, Extra length over 12 If LF 0 0 01 0 $ 20.00 $0.0C 29 Trench Safety, 0' to 8' deep LF 200 1 255 0 2551 S 1.00 1 5255.0C 30 Trench Safety, 8' to 15' deep I LF 160 45 0 451 S 1.00 1 S45.00 31 JTrench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 S0.0C =21 Clean 6" to 12" Sewer I LF 1870 1617 - 0 16171 S 3.00 54,851.00 03 Clean 15" to 21" Sewer i LF 0 0 0 0 S 5.00 1 S0.0C 341Clean 24" to 36" Sewer LF 0 0 0 0 $ 10.00 1 50.0[ 35 TV Inspection of Sewer LF 1870 1617 01 1617 S 1.00 1 $1,617.00 36 Bypass Pumping, 3" pump Day 0 0 01 0 S 1.00 1 S0.0C 371 Bypass Pumping, 4" pump Day 0 0 01 0 $ 1.00 1 SO.00 pe 1 wo2partial CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 AMM Construction and Rehabilitation, L.P. East Erath ouston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18 Working Days pe 1 wo2partial Est. WO2 P.E.1 P.E. 2 1 Total Unit Total this Item Description Unit Quant. Quantities Quantities Quantities I Price Estimate 38 Bypass Pumping, 6" Dump Day 0 0 01 01 S - $0.00 39 Bypass Pumping, 8" pump Day 0 0 0 0 $ - $0.00 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 2 0 1 0 0 $ 1,250.00 $0.00 411 Pt. Repair, 6" - 12", 8' - 15' deep, up to 12 If EA 1 3 1 0 1 S 1,750.00 51,750.00 421 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 0 S 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0' - 8' deep, up to 12 If EA 0 0 0 0 S 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 2,900.00 $0.00 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 451f EA 0 0 0 0 $ 3,500.00 50.00 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 S 4,000.00 $0.00 471 Pt. Repair, 21" - 36 ", 8' - 15' deep, up to 12 If EA 0 0 0 0 $ 6,000.00 $0.00 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 481 If EA 0 0 0 0 $ 8,000.00 $0.00 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 0 S 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 1 0 1 $ 120.00 $120.00 Extra length pt. Repair, all sizes, overl5' 51 deep LF 0 0 0 0 $ 160.00 $0.00 Rmv /Rplace 6"- 12 ", includes modified 0 $ 65.00 $0.00 52 bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 IRmv/Rplace 6"- 12 ", includes modified 0 $ 75.00 $0.00 53 bedding, 8' - 15' deep, 50 L.F. min. IF 0 0 0 Rmv /Rplace 6"- 12 ", includes modified 54 bedding, over l5' deep, 50 L.F. min. LF 0 0 0 0 $ 1,000.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified I 55 bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified 56 bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified 57 bedding, over 15' deep, 50 L.F. min. 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 $ 100.00 $0.00 59 1 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 $ 150.00 $0.00 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & 60 reinforcement) SY 0 0 0 O $ 45.00 $0.00 Rmv /replace up to5" concrete. sidewalk/driveway (includes sawcutting & 61 reinforcement) SY 0 0 -J- 0 O $ 60.00 $0.00 R up to 2" HMAC, Type D, (incl. Saw 62 cut,tack coat, base repair) SY 0 60.91 0 60.91 S 30.00 51,827.3C 1" rock with no fines for bedding (incidental to 63 point repairs) TON 0 0 0 0 $ 20.00 50.00 64 1 Annular and void space grouting CY 0 1 0 1 0 01 s 100.00 $0.0C 651 Flagman for direction of traffic MHR 0 I 0 0 0 $ 20.00 1 S0.0C 66 Hydromulch Seeding SY 500 400 0 400 $ 3.00 1 51,200.0C 67 Bypass Pumping, 6" or greater Day 0 0 0 0 $ 1.00 S0.0C 8 Root & tuberculation removal, 6" - 12" LF 0 0 0 0 $ 10.00 $0.0C 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 0 S 20.00 1 $0.0C Steel Casing, up to 12 ", above ground, S0.0C 70 coated and wrapped, including supports LF 0 0 01 0 $ 100.00 1 71 Drop manhole assembly, up to 8' deep EA 0 0 1 0 0 S 2,500.00 S0.0C 721 Drop manhole assembly, over 8' deep VF 0 0 1 o7- 0 $ 500.00 $O.00 pe 1 wo2partial i 11 i CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18 Working Days Est. WO2 I P.E.I. I P.E. 2 Total Unit Total this Item Description Unit Quant. Quantities Quantities Quantities Price Estimate I Fa I 0 1 0 01 0 $ 1,000.00 $0.0C Total Less 0% Less Tot Estimate F11 I . �1• �� ..M. Construction •. on Contract Summary: Current Work Order #2 Amount Less 5% Retainage Less Previous Payments Current Amount Due $228,570.05 $ (215,405.42) $ 13,164.63 pelwo2partial Asst. Director of Engineering Date 28,570.0: 15,405.41 13,164.6: E, Co1wo3 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT . Year 2000 Change Order #1 on Work Order #3 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, mannole wall rehabilitation and miscellaneous items related to work on Country Club View 8 Country Club Drive. EXHIBIT C pager Ong. Final Cost Item Description 1 Unit Quant 1 Quant Diff. Price Difference 1 Pipe bursting 6' 8 8' with 8' HOPE min. SDR 17, 0'-8' deep LF 1 1701 1701 0 S 38.00 S 2 Pipe bursting 6' & 8' with 8' 1 HOPE min. SOR 17, 8' -15' deep LF 0 01 0 S 40.00 S 3 Pipe bursting 6' 8 8' with 8' HOPE min. SOR 17, over 15' j deep LF 0 0 S 45.00 S a Pipe bursting 8' 8 10' with 10' HOPE min. SOR 17. 0' -8' deeo I LF 0 0 0 S 42.00 $ 5 Pipe bursting 8' 8 10' with 10' 1 HOPE min. SDR 17, 8' -15' deeo LF 0 0 01 S 45.00 S 6 Pipe bursting 8' 8 IT with 10' HOPE min. SDR 17, over 158' 1 deep LF 01 0 0 $ 50.00 5 7 Pipe bursting 10' 8 12' with 12' HOPE min. SOR 17, 0'-8' deep LF 0 0 0 $ 55.00 S 8 Pipe bursting 10' S 12' with 12' HOPE min. SOR 17, 8' -15 deep LF 01 0 0 S 60.00 S 9 Pipe bursting 10' & 12' with 12' HOPE min. SOR 17, over 15 deep LF 0 0 0 S 75.00 S 10 Pipe bursting 12' & 15' with 15' HOPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 S 75.00 5 11 Pipe bursting 12' & 15' with 15' HOPE min. SDR 17, min, PVC SOR 26, 8' -15' deep LF 0 0 0 S 85.00 S 12 Pipe bursting 12' & 15' with 15' HOPE min. SDR 17, min, PVC SDR 26, over 15 deep LF 0 0 0 S 100.00 $ 13 Remove existing slipliner, all sizes and depths LF 0 0 0 S 5.00 5 - 14 Reconnect service - short side, 0'-8' deep EA 0 0 0 $ 500.00 S 15 Reconnect service - short side, over 8' deep EA 0 0 0 $ 700.00 $ 16 Reconnect service - long side, 0' 8' deep EA 0 0 O S 1,200.00 $ 17 Reconnect service - long side, S over 8' deep EA 0 0 01 S 1.500.00 18 Manhole Wall Sealing VF 0 6.251 6.25 5 85.00 5 531.25 19 RepOnstall new manhole, 0'-8' deep EA 0 0 O $ 1,500.00 S 201 New Manhole. over 8' deep VF 61 0 -6 $ 200.00 S (1.200.00) 21 Replaceiinstall ring and cover EA 01 0 0 S 300.00 S 22 Extra cement stabilized sand backfill, 2 skJton TON 45 0 -451 S 20.00 S (900.00) 23 Point Rpr/obst rmv - pipe bursting, 0'- 8' deep EA 2 3 1 $ 300.00 S 300.00 24 Point Rpdobst rmv - pipe bursting, 8' - 15 deep EA 0 0 0 S 400.00 5 25 Point Rpriobst rmv - pipe 1 bursting, over 15 deep EA 0 0 0 S 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 S 27 Well Point set up, up to 12 If EA 01 0 0 S 2,800.00 S 28 Well Point. Extra length over 12 If LF 0 0 0 S 20.00 S �29 Trench Safety, 0' to 8' deeo LF 20 201 01 S 1.00 $ EXHIBIT C pager T I C Co1wo3 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #3 11/2212000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View 8 Country Club Drive. 30 Trench Safety, 8' to 15' deep LF 0 01 01 5 1.00 S 31 Trench Safety, 8' to 15' deep LF 0 01 01 S 1.00 $ 32 Clean 6" to 12" Sewer LF 0 01 3.00 S 33 Clean 15" to 21" Sewer LF 0 01 01 S 5.00 S 34 Clean 24' to 36" Sewer LF 0 01 0 $ 10.00 $ 35 TV Inspection of Sewer LF 0 01 01 S 1.00 S 36 Bypass Pumping, 3" pump Day 01 0 0 $ 1.00 S 371 Bypass Pumping, 4" pump Day 01 0 0 S 1.00 $ 381 Bypass Pumping, 6" pump Day 01 0 0 S - $ 391 Bypass Pumping, 8" pump Day 0 0 0 S $ 40 Pt Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 0 S 1,250.00 $ 41 Pt. Repair, 6" - 12", 8' - 15' deep, up to 12 If EA 0 01 0 S 1,750.00 $ 42 Pt. Repair, 6" - 12', over 15' deep, up to 12 If EA 0 0 0 $ 2.500.00 $ 43 PL Repair, 15' - 18 ", 0' - 8' deep, up to 12 If EA 0 0 0 $ 2.250.00 S 44 Pt. Repair, 15" - 18 ", 8' - 15' deep, up to 12 If EA 0 0 01 S 2,900.00 $ PL Repair, 15" - 18', over 15' deep, up to 12 If EA 0 0 0 S 3,500.00 $ - 46 Pt Repair, 21" - 36', 0'- 8' J deep, up to 12 If EA 0 0 0 S 4,000.00 $ 4745 Pt. Repair, 21" - 36", 8' - 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 S 48 PL Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8.000.00 $ - 49 Extra length pL Repair, all sizes, 10'- 8' deep LF 0 0 Of $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 0 $ 120.00 $ - 51 Extra length PL Repair, all saes, overly' deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6" - 12', includes modified bedding, 0'- 8' deep, 50 L.F, min. LF 0 D 0 $ 65.00 $ 53 Rmv /Rplace 6"- 12% includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 -S 54 Rmv /Rplace 6' - 12", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $' 55 Rmv /Rplace IS'- 18 ", includes modified bedding, 0'- B' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15- - 18", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15- - 18", includes modified bedding, over 15' deep, 50 L.F, min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 S 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 S 150.00 $ 60 Rmv /replace up toy" concrete Sidewalk/driveway (includes 1 sawcutting & reinforcement) Sy 0 0 0 S 45.00 $ -A page2 U Ll Co1wo3 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #3 11122!2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 61 Rmv /replace up to5' concrete sidewalk driveway (includes sawcutting & reinforcement) SY 0 0 0 S 60.00 $ 62 Rmv /rep! up to 2' HMAC, Type D. (incl. Saw cut,tac k coat, base repair) SY 0 0 0 $ 30.00 S 63 1' rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 S 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 S 20.00 S 66 Hydromulch Seeding SY 0 50 50 $ 3.00 S 150.00 67 Bypass Pumping, 6' or greater Day 0 0 0 $ 1.00 S - 68 Root & tuberculation removal, 6- - 12' LF 0 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12' -24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12', above ground, coated and wrapped, including supports Drop manhole assembly, up to 8' deep Drop manhole assembly, over 8' deep Emergency mobilization LF 01 0 0 $ 100.00 $ 71 EA 0 0 0 S 2.500.00 $ 72 VF 0 0 0 $ 500.00 $ - 73 EA 1 1 0 $ 1,000.00 S - Total Change Order #1 M onstruction Date Finance Date Work Order Summary. Final Construction Cost $ 9,061.25 Initial Work Order $ 10.180.00 Change Order #1 $ (1,118.75) Director of Engineering Date City manager Date S tiji8.75l page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 4VConstruction and Rehabilitation, L.P. 4 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Item L Description Unit Est. W03 P.E.1 Quant. Quantities P. E.2 Quantities Final Unit Quantities Price Total this Estimate I I I I I 1 ' I 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep . LF 1 170 170 1 0 170 S 38.00 $6,460.00 21Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 01 S 40.00 50.00 31Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 D 0 S 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 0 S 42.00 $0.00 SIPipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 45.00 50.00 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 0 S 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0'-8' deep LF 0 0 01 0 S 55.00 50.00 8 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 S 60.00 50.00 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 0 0 0 S 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 0 S 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 S 100.00 $0.00,1 13 Remove existing slipliner, all sizes and depths LF 0 0 0 0 $ 5.00 50.00 14 Reconnect service - short side, 0' -8' deep EA 0 0 01 0 $ 500.00 $0.00 15 Reconnect service - short side, over 8' deep EA 0 0 01 0 $ 700.00 $0.00 161 Reconnect service - long side, 0' -8' deep EA 0 0 01 0 $ 1,200.00 1 50.00 17 Reconnect service - long side, over 8' deep EA 0 0 01 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 0 0 6.251 6.25 $ 85.00 $531.25 19 Repl / install new manhole, 0' -8' deep EA 0 1 0 01 0 $ 1,500.00 $0.00 201 New Manhole , over 8' deep I VF 6 0 01 0 S 200.00 $0.00 211 Replace /install ring and cover EA 0 0 1 01 0 $ 300.00 50.00 22 Extra cement stabilized sand backfill, 2 TON 45 0 01 01 S 20.00 50.00 23 Point Rpr /obst rrnv - pipe bursting, 0'- 8' dee EA 2 3 I 01 3 $ 300.00 5900.00 24 Point Rpr /obst rmv - pipe bursting, 8' - 15' EA 0 0 01 0 S 400.00 $0.00 25 Point Rpr /obst nmv - pipe bursting, over 15' deep EA 0 0 0 0 S 500.00 $0.00 261Extra Length point repair, all depths 1 LF I 0 I 0 I 0 0 S 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 01 01 S 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 1 0 1 01 01 S 20.00 50.00 29 Trench Safety, 0' to 8' deep LF 20 1 20 1 01 201 5 1.00 $20.00 30 Trench Safety, 8' to 15' deep LF I 0 1 0 01 01 S 1.00 $0.00 31 Trench Safety, 8' to 15' deep LF 0 0 01 0 $ 1.00 SO.OG 321 Clean 6" to 12" Sewer LF 1 0 1 0 1 01 01 S 3.00 $0.00 33 lClean 15" to 21" Sewer 1 LF 0 0 01 01 S 5.00 S0.00 34 C lean 24" to 36" Sewer LF 0 G 0 0 S 10.00 $0.00 35 TV Inspection of Sewer I LF 0 I 0 ( 0 0 S 1.00 50.00 36 Bypass Pumping, 3" pump Dav ff I 0 0 0 0 S 1.00 S0.00 37 Bypass Pumping, 4" pump Day 0 0 0 0 S 1.00 I $0.00 36 Bypass Pumping, 6" pump Day 0 1 0 0 0 $ $0.00 39 Bypass Pumping, 8" pump Dav 0 1 0 0 01 S $0.00 pe2wo3final CITY OF BAY #OWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 0 4 East Erath ston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Item Description Unit Est. W03 P.E.1 Quant. Quantities P.E.2 Quantities Final Unit Quantities Price Total this Estimate I $0.00 41 1 Pt. Repair, 6"- 12 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 S 1.750.00 50.00 421 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA I 0 0 01 0 S 2,500.00 I $0.00 43 Pt. Repair, 15" - 18 -, 0'- B' deep, up to 12 If EA 0 0 01 0 S 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 01 0 S 2.900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 1 EA 0 0 0 0 S 3,500.00 $0.00 461 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 I 01 0 S 4,000.00 $0.00 47iPt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 S 6.000.00 50.00 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 1 EA 0 0 0 01 $ 8,000.00 $0.00 49 50 Extra length pt. Repair, all sizes, 0' -.8' deep Extra length pt. Repair, all sizes, 8' - 15' deep LF LF 0 I 0 0 0 0 0 0 0 S 80.00 S 120.00 50.00 $0.00 51 Extra length pt. Repair, all sizes, over15' deeq LF 0 0 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6" - 12", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 $ 65.00 $0.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep. 50 L.F. min_ LF 0 0 0 01 S 1,000.00 $0.00 55 Rmv /Rplace 15"- 18 ", includes modified bedding, 0'- B' deep, 50 L.F. min. LF 0 0 0 0 S 75.00 1 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 57 Rmv /Rp1aos 15" - 18" includes modified bedding, over 15' deep, 50 L.F. min. 0 0 01 0 S 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 01 S 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 S 150.00 $0.00 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 1 0 0 0 S 45.00 $0.00 61 Rmv /replace up toy' concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 1 0 0 1 0 01 $ 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type 0, (incl. Saw cut,tack coat, base repair) SY 0 0 0 0 $ 30.00 50.00 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 0 S 20.00 50.00 64 Annular and void space grouting CY 0 I 0 0 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 1 0 0 S 20.00 $0.00 66 Hyd omulch Seeding SY 1 0 50 0 50 S 3.00 5150.00 67 Bypass Pumping, 6" or greater Dav 0 0 I 0 0 $ 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 0 $ 10.00 $0.00 69WRoot & tuberculation removal, 12" - 24" LF 0 I 0 01 0 $ 20.00 50.00 70 15teel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 0 0 0 S 100.00 50.00 71 Drop manhole assembly, up to 8' deep E4 0 0 0 0 S 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 0 0 S 500.00 50.00 73 Emergency mobilization EA 1 1 0 1 S 1,000.00 $1,000.00 pe2wo3final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Item Est. W03 P.E.1 I P.b.l I rmai Unit I Quant. . Quantitiesl Quantities Quantities onWO3 Co struction Date Contract Summary: Current Work Order #2 Amount $9,061.25 Less 0% Retainage $ Le33 Previous Payments $ (8,103.50) Current Amount Due $ 957.75 C Unit Total this Price Estimate $g,061.s' $ (8.103.: Asst Director of Engineering Date pe2wo3final i, • Co1wo4 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 1112212000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. UO;_, ►' . �• pagel Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 1290 1258 -32 $ 38.00 $ (1,216.00) 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 40.00 $ 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 01 0 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 01 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ 13 Remove existing slipliner, all sizes and depths LF 570 1258 688 $ 5.00 $ 3,440.00 14 Reconnect service - short side, 0' -8' deep EA 31 31 0 $ 500.00 $ - 15 Reconnect service - short side, over 8' deep EA 0 0 0 $ 700.00 $ 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1,500.00 $ 18 Manhole Wall Sealing VF 14 9.17 -4.83 $ 85.00 $ (410.55) 19 Repl /install new manhole, 0' -8' deep EA 1 1 0 $ 1,500.00 $ - 20 New Manhole, over 8' deep VF 0 0 0 $ 200.00 $ 21 Replace /install ring and cover EA 0 1 1 $ 300.00 $ 300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 0 0 0 $ 20.00 $ - 23 Point Rpr /obst rmv - pipe bursting, 0' - 8' deep EA 3 0 -3 $ 300.00 $ (900.00) 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 0 0 $ 400.00 $ 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ Point set up, up to 12 If EA 0 0 0 $ 2,800.00 $ Well Point, Extra length over 12 ff28Well If LF 0 0 0 $ 20.00 $ - Trench Safety, 0' to 8' deep LF 120 80 40 $ 1.00 $ (40.00) UO;_, ►' . �• pagel C Co1wo4 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 30 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 0 0 0 $ 3.00 $ 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 0 0 0 $ 1.00 $ 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ - $ 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 1,250.00 $ 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 1,750.00 $ 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 01 0 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21"- 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 0 $ 120.00 $ 51 Extra length pt. Repair, all sizes, overl6 deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 01 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 01 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 1 0 01 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes TO sawcutting & reinforcement) SY 0 0 $ 45.00 $ page2 Co1wo4 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 11/22!2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 $ 30.00 $ 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 $ 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00. $ 66 Hydromulch Seeding SY 120 200 80 $ 3.00 $ 240.00 67 Bypass Pumping, 6" or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" - 12" LF 0 01 0 $ 10.00 $ 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports Drop manhole assembly, up to LF 0 0 0 $ 100.00 $ 71 8' deep Drop manhole assembly, over 8' EA 0 0 0 $ 2,500.00 $ 72 deep Emergency mobilization VF 0 0 0 $ 500.00 $ 73 EA 0 0 0 $ 1,000.00 $ Q A4q AC Total Change Order #1 l 8/"go fl� P.M Construction Date Finance Date Work Order Summary: Final Construction Cost $ 72,853.45 Initial Work Order $ 71,440.00 Change Order #1 $ 1,413.45 Director of Engineering Date City manager Date page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 t� SConstruction and Rehabilitation, L.P. 4 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days Item Description Unit Est. WO4 Quant. P.E.1 Quantities P.E.2 Quantities Final Quantities Unit Price Total this Estimate 1117, Pipe bursting 6" & 8" with 8" HDPE min. SDR 0' -8' deep LF 1290 1 860 398 1258 $ 38.00 $47,804.00 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 40.00 $0.00 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 42.00 $0.00 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 45.00 $0.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 1 0 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 0 $ 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 01 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 570 1146 112 1258 $ 5.00 $6,290.00 14 Reconnect service - short side, 0' -8' deep EA 31 31 0 31 $ 500.00 $15,500.00 15 1 Reconnect service - short side, over 8' deep EA 0 0 0 0 $ 700.00 $0.00 16 Reconnect service - long side, 0' -8' deep EA 0 0 0 0 $ 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 14 9 0.17 9.17 $ 85.00 $779.45 19 Repl /install new manhole, 0' -8' deep EA 1 0 1 1 $ 1,500.00 $1,500.00 20 New Manhole, over 8' deep VF 0 0 0 0 $ 200.00 $0.00 211 Replace /install ring and cover EA 0 1 0 1 $ 300.00 $300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 0 0 0 0 $ 20.00 $0.00 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 3 0 0 0 $ 300.00 $0.00 24 Point Rpr /obst rmv - pipe bursting, 8' - 15' deep EA 0 0 0 0 $ 400.00 $0.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depths LF 0 0 0 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 120 62.19 17.81 80 $ 1.00 $80.00 30 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 31 Trench Safety, 8' to 15' deep LF 0 0 1 0 0 $ 1.00 $0.00 32 Clean 6" to 12" Sewer LF 0 0 0 0 $ 3.00 $0.00 33 Clean 15" to 21" Sewer LF 0 0 0 0 $ 5.00 $0.00 pe2wo4final CITY OF BAYTOWN Ii-oject: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Construction and Rehabilitation, L.P. 4 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days Item Description Unit Est. WO4 Quant. P.E.1 Quantities P.E.2 Quantities Final Quantities Unit Price Total this Estimate 34 Clean 24" to 36" Sewer LF 0 0 0 0 $ 10.00 $0.00 35 TV Inspection of Sewer LF 0 0 0 0 $ 1.00 $0.00 36 Bypass Pumping, 3" pump Day 0 0 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day 0 0 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day 0 0 0 0 $ - $0.00 40 Pt. Repair, 6" - 12",-5'- 8' deep, up to 12 If EA 0 0 0 0 $ 1,250.00 $0.00 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 1,750.00 $0.00 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 1 0 0 0 $ 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 $ 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 2,900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 01 $ 3,500.00 $0.00 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 $ 4,000.00 $0.00 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 6,000.00 $0.00 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 0 $ 8,000.00 $0.00 49 Extra length pt. Repair, all sizes, 0' - 8' deep LF 0 0 0 0 $ 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 0 0 $ 120.00 $0.00 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 0 $ 160.00 $0.00 IRmv/Rplace 52 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 01 0 $ 65.00 $0.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 0 $ 1,000.00 $0.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 1 0 0 0 $ 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 1 0 0 0 $ 150000 $0.00 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 0 $ 45.00 $0.00 61 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 0 $ 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 0 $ 30.00 $0.00 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 0 $ 20.00 $0.00 64 Annular and void space grouting CY 0 0 01 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 $ 20.00 $0.00 66 Hydromulch Seeding SY 120 180 20 200 $ 3.00 $600.00 67 Bypass Pumping, 6" or greater Day 0 0 0 0 $ 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 1 0 0 0 $ 10.00 $0.00 pe2wo4final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days Item Description Unit Est. WO4 Quant. P.E.1 Quantities P.E.2 Quantities Final Quantities Unit Price Total this Estimate 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 0 $ 20.00 $0.00 70 Steel Casing, up to 12", above ground, coated and wrapped, including supports LF 0 0 0 0 $ 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 0 0 $ 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 0 0 $ 500.00 $0.00 73 Emergency mobilization EA 0 0 0 0 $ 1,000.00 $0.00 Total r� �_�g ,� _ , .. t� N $72,853.45 0 Less 0% Retainage�� T2F e�Yyi . Z, Al Own Less Total Previous Payments on WO 4 $ (55,577.19) Payment Due This Estimate $ 17,276.26 P.M. Con uction Date Contract Summary: Current Work Order #4 Amount $72,853.45 Less 0% Retainage $ Less Previous Payments $ (55,577.19) Current Amount Due $ 17,276.26 C7 pe2wo4final Director •e Engineering ` Date