Loading...
Ordinance No. 9,04520001130 -4 ORDINANCE NO. 9045 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDERS NO. 1 TO EACH WORK ORDER 1, 2; 3 AND 4 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES AND ACCEPTANCE OF WORK PERFORMED UNDER WORK ORDERS 1, 2, 3 AND 4 FOR THE ANNUAL SANITARY SEWER REHABILITATION CONTRACT — YEAR 2000; AUTHORIZING FINAL PAYMENT FOR WORK PERFORMED UNDER WORK ORDERS 1, 2,3 AND 4 OF THE SUM OF ONE HUNDRED SEVEN THOUSAND THREE HUNDRED SIXTY -FOUR AND 28/100 DOLLARS ($107,364.28) TO P.M. CONSTRUCTION AND REHABILITATION, L.P.; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Annual Sanitary Sewer Rehabilitation Contract — Year 2000 (the "Project "); and WHEREAS, a deduct change order in the amount of TWELVE THOUSAND TWO HUNDRED SEVENTY -ONE AND 25/100 DOLLARS ($12,271.25) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work performed under Work Orders 1, 2, 3 and 4 of the Annual Sanitary Sewer Rehabilitation Contract — Year 2000 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of ONE HUNDRED SEVEN THOUSAND THREE HUNDRED SIXTY -FOUR AND 28/100 DOLLARS ($107,364.28); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Orders No. 1 to each Work Order 1, 2, 3 and 4 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities and accept the work performed under Work Orders 1, 2, 3 and 4 for the Annual Sanitary Sewer Rehabilitation Contract — Year 2000. A copy of each deduct change order is 20001130 -4a attached hereto, marked Exhibits "A," `B," "C," and "D" and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of ONE HUNDRED SEVEN THOUSAND THREE HUNDRED SIXTY -FOUR AND 28/100 DOLLARS ($107,364.28) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 30th day of November, 2000. — Z&C_ � PETE C. ALFARO, Nfayor ATTEST: � )-' FA, GAI& SMITH, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, SR., ' y Attorney 40 cA1MyDocuments \Counci1\00 -01\ November\ AnnualSanitarySewerRchabYear2000ChangeOrdersI &FinaftyWkOrds1 -4 ' CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Wotk Order #1 w 11/22/2000 v This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews, Kilgore, Walker @ Cline and Civic Drive. EXHIBIT A Colwol pagel Ong. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 0' -8' deep LF 2358 2062 -296 $ 38.00 $(11,248.00) 2 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 2700 2179 -521 $ 40.00 $(20,840.00) 3 Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, 8' -15' deep LF 01 01 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HOPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ 7 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 0' -8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, 8' -15' deep LF 01 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HOPE min. SDR 17, over 15' deep LF 0 ., . 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15' HOPE min. SDR 17, min, PVC SOR 26, 0'-8' deep LF 0 210 210 $ 75.00 $ 15,750.00 11 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SOR 26, 8' -15' deep LF 263 264 1 $ 85.00 $ 85.00 12 Pipe bursting 12" & 15" with 15" HOPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ - 13 Remove existing slipliner, all sizes and depths LF 1032 2408 1376 $ 5.00 $ 6,880.00 14 Reconnect service - short side, 0' -8' deep EA 28 34 6 $ 500.00 $ 3,000.00 15 Reconnect service - short side, over 8' deep EA 50 38 -12 $ 700.00 $ (8,400.00) 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1,500.00 S 18 Manhole Wall Sealing VF 145 123.53 -21.47 $ 85.00 $ (1,824.95) 19 Repl/install new manhole, 0'-8' deep EA 3 1 -2 $ 1,500.00 $ (3,000.00) 20 New Manhole, over 8' deep VF 1 1 0 $ 200.00 $ 21 Replace /install ring and cover EA 0 1 1 $ 300.00 S 300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 70 151.72 81.72 $ 20.00 $ 1,634.40 23 Point Rpr /obst rmv - pipe bursting, 0' - 8' deep EA 0 3 3 $ 300.00 $ 900.00 24 Point Rpr /obst rmv - pipe bursting, 8' - 15' deep EA 0 0 0 $ 400.00 $ - 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ 27 Well Point set up, up to 12 If EA 2 0 -21$ 2,800.00 $ (5,600.00) 28 Well Point, Extra length over 12 If LF 20 0 -20 $ 20.00 $ (400.00) 29 Trench Safety, 0' to 8' deep LF 2001 20 -180 $ 1.00; $ (180.00) EXHIBIT A Colwol pagel r CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #1 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews, Kilgore, Walker @ Cline and Civic Drive. 30 Trench Safety, 8' to 15' deep LF 225 233 8 $ 1.00 $ 8.00 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ - 32 Clean 6" to 12' Sewer LF 0 989 989 $ 3.00 $ 2,967.00 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ - 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ - 35 TV Inspection of Sewer LF 0 989 989 $ 1.00 $ 989.00 36 Bypass Pumping, 3" pump Day 0 9 9 $ 1.00 $ 9.00 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ . 38 Bypass Pumping, 6" pump Day 0 0 $ $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ $ 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 3 3 $ 1,250.00 $ 3,750.00 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up -to 12 If EA 0 6 6 $ 1,750.00 $ 10,500.00 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ - 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 1 1 $ 2.250.00 $ 2,250.00 44 Pt. Repair, 15" - 18 ", 8' - 15' deep, up to 12 If EA 0 0 0 $ 2,900.00 $ - 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21' - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA - 0 0 0 $ 6,000.00 $ 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8.000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 01 0 0 $ 120.00 $ 51 Extra length pt. Repair, all sizes, over15' deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6"- 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6"- 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 54 Rmv /Rplace 6"- 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15"- 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15"- 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 1 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 01 01 0 $ 45.00 $ Colwol page2 I C Colwo1 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #1 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Coachman, Glenhaven, St. Andrews, Kilgore, Walker @ Cline and Civic Drive. 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting 8 reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /repl up to 2' HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 22:26 22.26 $ 30.00 $ 667.80 63 1' rock with no fines for bedding (incidental to point repairs) TON 1 10 6 -4 $ 20.00 $ (80.00) 64 Annular and void space grouting CY 6 0 -6 $ 100.00 $ (600.00) 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ 66 Hydromulch Seeding SY 480 420 -60 $ 3.00 $ (180.00) 67 Bypass Pumping, 6 "'orgreater Day 2 0 -2 $ 1.00 $ (2.00) 68 Root & tuberculation removal, 6" - 12" LF 01 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12' - 24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports Drop manhole assembly, up to 8' deep Drop manhole assembly, over 8' deep Emergency mobilization LF 0 0 0 $ 100.00 $ 71 EA 0 0 0 $ 2,500.00 $ 72 VF 0 0 0 $ 500.00 $ 73 EA 0 0 0 $ 1,000.00 $ Total Change Order #1 -a -oo M nstruction Date Finance Date Work Order Summary: Final Construction Cost $ 298,546.25 Initial Work Order $ 301,211.00 Change Order #1 $ (2,664.75) Director of Engineering Date City manager Date $ (2,664.75) page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 04 East Erath --ton, Texas 77012 Pay Estimate No. 4 final Pay Estimate Cut -off date November16,2000 (Invoice Date) Work Order #1 rev., Total Time Allowed: 60 Working Days Total Time Used: 52 Working Days peawolfinal It Description Unit Est. W01 Quant. P.E.1 Quantities P.E.2 Quantities P.E.3 P.E.4 Total Quantities Quantities to Date Unit Price Total Estimate I j 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17. 0'-8' deep LF 2358 0 1606 0 456 2062 S 38.00 $78,356.00 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 2700 1163 1016 0 0 2179 $ 40.00 S87,160.00 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 D 0 0 S 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0'-8' deep LF 0 0 0 0 0 0 S 42.00 $0.00 5I Pipe bursting 8" & 10" with 10" HDPE min. SDR 17. 8' -15' deep LF 0 0 0 0 0 0 $ 45.00 S0.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 0 0 0 S 50.00 S0.00 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0'-8' deep LF 0 0 0 0 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 0 0 $ 75.00- $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 210 0 210 $ 75.00 $15,750 -00 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 263 I 0 264 0 0 264 $ 85.00 $22,440.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 1 0 0 0 0 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 1032 1163 1245 0 0 2408 $ 5.00 $12,040.00 14 Reconnect service - short side, 0'-8' deep EA 28 0 29 1 4 34 S 500.00 $17,000.00 j 151 Reconnect service - short side. over 8' deep EA 50 22 16 0 0 38 $ 700.00 $26,600.00 16 1 Reconnect service - long side, '0' -8' deep EA 0 0 0 0 0 0 S 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 0 0 0 0 $ 1.500.00 $0.00 I 18 Manhole Wall Sealing VF 145 0 0 72.87 50.66 123.53 S 85.00 $10,500.05 j 19 Repl /install new manhole. 0'-8' deep EA 3 0 1 0 0 1 $ 1,500.00 $ 1,500.00 20 New Manhole, over 8' deep VF 1 0 1 0 0 1 $ 200.00 $200007, 21 Replace /install ring and cover EA 0 0 0 0 1 1 S 300.00 $300.00 22 Extra cement stabilized sand backfill, 2 sk./tonj TON 70 29.63 122.09 0 0 151.72 S 20.00 $3.034.40 i P3 Point Rpr /obst rrnv - pipe bursting, 0'- 8' deep EA 0 0 0 3 0 3 S 300.00 $900.00 24 Point Rpr /obst rrnv - pipe bursting, 8' - 15' EA 0 0 0 0 0 0 S 400.00 $0.00 25 Point Rpr /obst rrnv - pipe bursting, over 15' deep EA 0 0 0 0 0 0 S 500.00 $0.00 26 Extra Length point repair, all depths LF 0 0 0 0 0 0 S 60.00 $0.00 I 27 Well Point set up, up to 12 If EA 2 0 0 0 0 0 j $ 2,800.00 $0.00 j 28 Well Point, Extra length over 12 If LF 20 0 0 0 0 I 0 I S 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF I 200 0 0 20 0 20 $ 1.00 j $20.00 30 Trench Safety, 8' to 15' deep LF 225 110 123 0 0 233 $ 1.00 S233.00 j 31 Trench Safety, 8' to 15' deep LF 0 0 0 0 0 0 $ 1.00 S0.00 32 Clean 6" to 12" Sewer LF 0 0 989. 0 0 I 989 $ 3.00 $2,967.00 i 33 Clean 15" to 21" Sewer LF j 0 0 0 0 D 0 j $ 5.00 $0.00 34 Clean 24" to 36" Sewer LF 0 0 D 0 0 j 0 $ 10.00 $0.00 35 TV Inspection of Sewer LF 0 0 j 989 0 0 1 989 $ 1.00 $989.00 j 36 Bypass Pumping, 3" pump Dav 0 2 6 0 0 9 $ 1.00 $9.00 37 Bypass Pumping, 4" pump I Day 0 0 0 0 0 j 0 j S 1.00 $0.00 , 38 Bypass Pumping, 6" pump Dav 0 0 0 0 0 0 S - $0.00 1 39 Bypass Pumping, 8" pump Dav 0 0 1 0 0 0 I 0 S $0.00 40 Pt. Repair, 6" - 12 ', 0'- 8' deep, up to 121 EA 0 0 3 0 0 3 S 1,250.00 $3.750.00 1 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA. 0 0 j 6 D 0 6 $ 1,750.00 $10,500.00 I 42 Pt. Repair. 6" - 12 ", over 15' deep. up to 12 If EA 0 --o-T-5 0 0 0 $ 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0'- B' deep, uo to 12 If EA D 0 0 1 0 1 $ 2.250.00 S2 250.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep. up to !2 If EA 0 0 0 0 0 0 $ 2.900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep. up to 12 If EA 0 1 0 0 0 0 0 $ 3,500.00 $0.00 46 Pt. Repair, 21" - 36 ", 0'-- 8' deep, up to 12 If EA 0 0 j 0 0 0 0 $ 4.000.00 S0.00 I peawolfinal CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. f04 East Erath uston, Texas 77012 Pay Estimate No. 4 final Pay Estimate Cut-off date November16,2000 (Invoice Date) Work Order #1 rev., Total Time Allowed: 60 Working Days Total Time Used: 52 Working Days Item Description I Unit Est. WO1 Quant. P.E.1 Quantities P.E.2 Quantities P.E.3 P.E.4 Total Quantities Quantities to Date Unit Price Total Estimate 471Pt. Repair, 21" - 36 ", 8' - 15' dee . uo to 12 If EA 0 0 0 I 0 0 0 S 6.000.00 $0.00 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 0 0 0 $ 8.000.00 $0.00 49 Extra length pl. Repair, all sizes, 0'- 8' deep LF 0 0 0. 0 0 0 S 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 0 0 0 0 $ 120.00 $0.00 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 0 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L. F. min. LF 0 0 0 0 0 0 $ 65.00 $0.00 53 Rmv /Rplace 6"- 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L:F. min. LF 0 0 0 0 0 0 $ 1,000.00 $0.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L. F. min. LF 0 0 0 0 0 0 S 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 1 0 0 0 0 0 $ 100.00 1 $0.00 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 0 0 $ 150.00 $0.00 60 Rmv /replace up toy" concrete sidewalkldriveway (includes sawcutting & reinforcement) SY 0 0 0 0 0 0 $ 45.00 $0.00 61 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 0 0 0 $ 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type D, (ind. Saw cut,tack coat, base repair) SY 0 0 22.26 0 0 22.26 $ 30.00 $667.80 63 1" rock with no fines for bedding (incidental to point repairs) TON 10 1 0 6 0 0 6 $ 20.00 $120.00 64 Annular and void space grouting CY 6 0 0 0 0 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 1 0 0 $ 20.00 $0.00 66 Hydromulch Seeding SY 480 180 240 0 0 420 $ 3.00 $1,260.00 67 Bypass Pumping, 6" or greater Day 2 0 0 0 0 0 $ 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 0 0 0 $ 10.00 $0.00 69 Root & tuberculation removal, 12" - 24" LF 0 0 1 0 0 0 1 0 $ 20.00 $0.00 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 0 0 0 0 0 S 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 0 1 0 0 0 $ 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 0 0 0 0 $ 500.00 $0.00 73 Emergency mobilization EA 0 0 0 0 0 0 $ 1,000.00 $0.00 Total ezry .. - .. $298.546.25 Less 0% Retaina9e ..� Less Total Previous Payments on WO 1 _,.. : ' : _ ,.. t t_ t� � - e4-0* " '". $(260.881.54) Payment Due This Estimates ",? .� - S 37,664.71 Asst. Director of Engineering pe4wol final J ^� Construction ate Contract Summary: Current Work Order #1 Amount $298,5.46.25 Less 5% Retainage $ Less P.E. 1 $ (65,531.57) Less P.E. 2 $ (171,016.72) Less P.E. 3 $ (24,33325) Current Amount Due $37,664.71 Asst. Director of Engineering pe4wol final CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 t` Change Order #1 on Work Order #2 Q 11!22!2000 71-1 L This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lazy lane, Neal Street and Nolan Road. Co1wo2 pagel Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 2570 3613 1043 $ 38.00 $ 39,634.00 2 Pipe bursting 6" & 8" with B" HDPE min. SDR 17, V -15' deep LF 1100 0 -1100 $ 40.00 $(44,000.00) 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 01 285 285 $ 45.00 $ 12,825.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 $ - 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -B' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 $ 100.00 $ 13 Remove existing slipliner, all sizes and depths LF 500 480 -20 $ 5.00 $ (100.00) 14 Reconnect service - short side, 0'-8' deep EA 72 91 19 $ 500.00 $ 9,500.00 15 Reconnect service - short side, over 8' deep EA 23 2 -21 $ 700.00 $(14,700.00) 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over 8' deep EA 0 0 0 $ 1,500.00 $ 18 Manhole Wall Sealing VF 57 36.75 -20.25 $ 85.00 $ (1,721.25) 19 Repl/install new manhole, 0'-8' deep EA 2 4 2 $ 1,500.00 $ 3,000.00 20 New Manhole, over 8' deep VF 0 0 0 $ 200.00 $ - 21 Replace/install ring and cover EA 0 1 1 $ 300.00 $ 300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 0 218.1 218.1 $ 20.00 $ 4,362.00 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 0 11 11 $ 300.00 $ 3,300.00 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 1 1 $ 400.00 $ 400.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ - 26 Extra Length point repair, all depths LF 0 0 0 $ 60.OD $ 27 Well Point set up, up to 12 If EA 0 0 0 $ 2,800.00 $ 28 Well Point, Extra length over 12 If LF 0 0 0 $ 20.00 $ - 29 Trench Safety, O' to 8' deep LF 200 255 55 $ 1.00 1 $ 55.00 Co1wo2 pagel ' r CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #2 �1 11122!2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lazy lane, Neal Street and Nolan Road. 30 Trench Safety, 8' to 15' deep LF 160 45 -115 $ 1.00 $ (115.00) 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 1870 1617 -253 $ 3.00 $ (759.00) 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 1870 1617 -253 $ 1.00 $ (253.00) 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ - $ 40 Pt. Repair, 6" - 12 ', 0' - 8' deep, up to 12 If EA 2 0 -2 $ 1,250.00 $ (2,500.00) 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 31 1 -2 $ 1,750.00 $ (3,500.00) 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15"- 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA . 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21"- 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21"- 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 0 $ 80.00 $ - 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 1 1 $ 120.00 $ 120.00 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 $ 160.00 $ - 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 01 0 0 $ 75.00 $ 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, D'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15"- 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8"-10", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalkidriveway (includes sawcutting & reinforcement) . I SY 1 0 01 0 $ 45.00 1 $ Co1wo2 page2 v Co1wo2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #2 1112212000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Greenbriar North side, Greenbriar South Side, Lazy lane, Neal Street and Nolan Road. 61 Rmv /replace up to5" concrete sidewalkidriveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 60.91 60.91 $ 30.00 $ 1,827.30 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 $ - 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ 66 Hydromulch Seeding SY 500 400 -100 $ 3.00 $ (300.00) 67 B pass Pumping, 6" or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above -. ground, coated and wrapped, including supports Drop manhole assembly, up to 8' deep Drop manhole assembly, over 8' deep Emergency mobilization LF 01 0 0 $ 100.00 $ 71 EA 0.- 0 0 $ 2,500.00 $ 72 VF 0 0 0 $ 500.00 $ 73 L EA 0 0 0 $ 11000.00 $ Total Change Order #1 1- M Construction Date Finance Date Work Order Summary: Final Construction Cost $ 228,570.05 Initial Work Order $ 221,195.00 Change Order #1 $ 7,375.05 Director of Engineering Date City manager Date $ 7,375.05 page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 M.M. Construction and Rehabilitation, L.P. 704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18.Working Days Item Description Unit Est. W02 Quant. P.E.1 Quantities P.E. 2 Quantities Total Quantities Unit Price Total this Estimate 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 2570 3613 0 3613 $ 38.00 $137,294.00 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 1100 0 1 0 0 S 40.00 S0.00 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 45.00 S0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 42.00 $0.00 I 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 285 0 285 $ 45.00 I $12,825.00 1 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 j $0.00 I 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 60.00 i $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 0 S 75.00 S0.00 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 0 $ 85.00 S0.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 S 100.00 S0.00 13 Remove existing slipliner, all sizes and depths LF 500 480 0 480 S 5.00 $2,400.00 14 Reconnect service - short side, 0' -8' deep EA 72 91 0 91 S 500.00 $45,500.00 15 Reconnect service - short side, over 8' deep EA 23 2 0 2 $ 700.00 $1,400.00 16 Reconnect service - long side, 0' -8' deep EA 0 0 0 0 S 1,200.00 S0.00 17 Reconnect service - long side, over 8' deep EA 0 0 0 01 S 1,500.00 $0.00 18 Manhole Wall Sealing VF 57 15.25 21.5 36.75 $ 85.00 $3,123.75 19 Repl /install new manhole, 0' -8' deep EA 2 4 0 4 $ 1,500.00 $6,000.00 . 20INew Manhole , over 8' deep VF 0 0 0 0 $ 200.00 $0.00 j 21 Replace /install ring and cover EA 0 1 0 1 $ 300.00 S300.00 22 Extra cement stabilized sand backfill, 2 TON 0 218.1 0 218.1 $ 20.00 $4,362.00 23 Point Rpr /obst rmv - pipe bursting, 0' - 8' EA 0 11 0 11 S 300.00 $3,300.00 24 Point Rpr /obst rmv - pipe bursting, 8' - 15' EA 0 1 0 1 $ 400.00 $400.00 , 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 0 S 500.00 50.00 26 Extra Length point repair, all depths LF 0 0 0 0 $ 60.00 S0.00 27 Well Point set up, up to 12 If EA 0 0 0 0 S 2,800.00 50.00 I 28 Well Point, Extra length over 12 If LF 0 0 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 200 255 0 255 S 1.00 $255.00 30 Trench Safety, 8' to 15' deep LF 160 45 0 45 S 1.00 $45.00 31 Trench Safety, 8' to 15' deep LF 0 0 0 0 S 1.00 S0.00 32 1 Clean 6" to 12" Sewer LF 1870 1617 0 1617 S 3.00 $4,851.00 33 Clean 15" to 21" Sewer LF 0 0 0 0 S 5.00 S0.00 34 Clean 24" to 36" Sewer LF 1 0 0 0 01 S 10.00 S0.00 I 35 TV Inspection of Sewer LF 1870 1617 0 1617 $ 1.00 S1,617.00 36 Bypass Pumping, 3" pump Day 0 0 0 0$- 1.00 $0.00 371 Bypass Pumping, 4" pump Dav 0 1 0 01 01 S 1.00 $0.00 pelwo2partial CITY OF BAYTOWN • Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 C M. Construction and Rehabilitation, L.P. 04 East Erath ouston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18 Working Days pelwo2partial Est. WO2 P.E.1 P.E. 2 Total Unit Total this Item Description Unit Quant. Quantities Quantities Quantities Price Estimate 381Bypass Pumping, 6" pump Day 0 0 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day 0 0 0 0 $ $0.00 40 Pt. Repair, 6"- 12 ", 0'- 8' deep, up to 12 If EA 2 0 0 0 $ 1,250.00 $0.00 411 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 3 1 0 1 $ 1,750.00 $1,750.00 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 0 $ 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 $ 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 2,900.00 $0.00 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 45. If EA 0 0 0 0 $ 3,500.00 $0.00 461 Pt. Repair, 21" - 36 ", 0' - 8' deep, up to 12 If EA 0 0 0 0 $ 4,000.00 $0.00 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 $ 6,000.00 $0.00 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 48lf EA 0 0 0 0 $ 8,000.00 $0.00 491 Extra length pt. Repair, all sizes, 0' - 8' deep LF 0 0 0 0 $ 80.00 $0.00 501 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 1 0 1 $ 120.00 $120.00 Extra length pt. Repair, all sizes, overl5' 51 deep LF 0 0 0 0 $ 160.00 $0.00 Rmv /Rplace 6"- 12 ", includes modified 52 bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 $ 65.00 $0.00 Rmv /Rplace 6" - 12 ", includes modified 53 bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0,.$ 75.00 $0.00 Rmv /Rplace 6" - 12 ", includes modified 54 bedding, over 15' deep, 50 L.F. min. LF 0 0 0 0 $ 1,000.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified 55 bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified 56 bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 Rmv /Rplace 15" - 18 ", includes modified 57 bedding, over 15' deep, 50 L.F. min. 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 $ 150.00 $0.00 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & 60 reinforcement) SY 0 0 0 0 $ 45.00 $0.00 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & 61 reinforcement) SY 0 0 0 0 $ 60.00 $O.OD Rmv /repl up to 2" HMAC, Type D, (incl. Saw 62 cut,tack coat, base repair) SY 0 60.91 0 60.91 $ 30.00 $1,827.30 1" rock with no fines for bedding (incidental to 63 point repairs) TON 0 0 0 0 $ 20.00 $0.00 64 Annular and void space grouting CY 0 0 0 Of $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 $ 20.00 $0.00 66 Hydromulch Seeding SY 500 400 0 400 $ 3.00 $17200.00 67 Bypass Pumping, 6" or greater Day 0 0 0 0 $ 1.00 50.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 0 $ 10.00 $0.00 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 0 $ 20.00 $0.00 Steel Casing, up to 12 ", above ground, 70 coated and wrapped, including supports LF 0 0 0 0 $ 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 0 0 $ 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 0 01 $ 500.00 $0.00 pelwo2partial !7 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 10, 2000 (Invoice Date) Work Order #2, Total Time Allowed: 60 Working Days Total Time Used: 18 Working Days Est. WO2 Total unit ivzai uus Item Description Unit Quant. Quantities Quantities Quantities Price Estimate 79 Finarnanry mnhili7atinn EA 0 0 0 0 $ 1,000.00 1 $0.00 Total Previous Payments on WO 2 lent Due This Estimate M. Construction Date Contract Summary: Current Work Order #2 Amount $228,570.05 Less 5% Retainage $ Less Previous Payments $ (215,405.42) Current Amount Due $ 13,164.63 pe 1 wo2partial $228,570. $ (215,405. $ 13,164. Asst. Director of Engineering Date n Co1wo3 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #3 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View 8 Country Club Drive. if i0 - pager Ong. Final I Cost Item Description Unit Quant Quant. Diff. Price Difference 1 Pipe bursting 6- & 8" with 8' HOPE min. SDR 17, 0'-8' deep LF 170 170 0 $ 38.00 $ 2 Pipe bursting 5" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 40.00 $ 3 Pipe bursting 6' & 8' with 8' HOPE min. SDR 17, over 15' deep LF 0 0 01 S 45.00 $ 4 Pipe bursting 8' & 10' with 10" HOPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 42.00 S 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 01 0 $ 45.00 $ 6 Pipe bursting 8' & 10' with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 $ 50.00 S 7 Pipe bursting 10" & 12" with 12' HDPE min. SOR 17, 0'-8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12' HDPE min. SDR 17, 8' -15' deep LF 0 01 0 $ 60.00 $ 9 Pipe bursting 10' & 12" with 12' HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 75.00 S 10 Pipe bursting 12" & 15' with 15' HDPE min. SOR 17, min, PVC SDR 26. 0'-8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12' & 15' with 15' HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15' with 15' HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF Of 0 0 $ 100.00 S 13 Remove existing slipliner, all - 0 $ 5.00 $ sizes and depths LF 1 0 0 14 Reconnect service - short side, 0 $ 500.00 S 0'-8' deep EA 0 0 15 Reconnect service - short side, 0 $ 700.00 $ over 8' deep EA 0 0 16 Reconnect service - long side, 0' $ 8' deep EA 0 0 0 S 1.200.00 17 Reconnect service - long side, 0 $ 1,500.00 $ over 8' deep EA 0 0 6.25 6.25 $ 85.00 S 531.25 18 Manhole Wall Sealing VF 0 19 Repi/install new manhole, 0'-8' deep p p 0 $ 1,500.00 $ 20 New Manhole over 8' deep VF 6 0 -6 $ 200.00 S (1,200.00) 21 , Replaceiinstall ring and cover EA 0 0 0 S 300.00 $ 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 45 0 -45 S 20.00 S (900.00) 23 Point Rpdobst rrnv - pipe 1 $ 300.00 S 300.00 bursting, 0'- 8' deep EA 2 3 24 Point Rpr /obst rmv - pipe $ - bursting, 8'- 15' deep EA 0 0 0 S 400.00 25 Point Rpr /obst rrnv - pipe S bursting, over 15' deep EA 0 0 0 $ 500.00 26 Extra Length point repair, all $ depths LF 0 0 0 S 60.00 27 Well Point set up, up to 12 If EA 0 I 0 0 $ 2,800.00 $ 28 Well Point, Extra length over 12 If LF 01 0 0 $ 20.00 $ 29 Trench Safety, 0' to 8' deep LF 201 ii 20 0 S 1.00 $ if i0 - pager CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 ` Change Order #1 on Work Order #3 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 30 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 0 0 0 $ 3.00 $ 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 0 0 0 $ 1.00 $ 36 Bypass Pumping, 3" pump Day 0 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 $ 1.00 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ $ 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 1,250.00 $ 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 01 0 $ 1,750.00 $ 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 tf EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0' - 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15"- 18 ", 8'- 15' deep, up to 12 If EA 01 0 0 $ 2,900.00 $ 45 Pt. Repair, 15'- 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21" - 36 ', 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ ` 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0' - 8' deep LF 0 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 0 $ 120.00 $ 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6"- 12 ', includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6"- 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 01 0 $ 75.00 $ 54 Rmv /Rplace 6"- 12 ', includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 01 0 0 $ 75.00 $ 56 Rmv /Rplace 15"- 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep. 50 L.F. min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) I SY 1 01 01 0 $ 45.00 1 $ Co1wo3 page2 I I Co1wo3 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #3 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 61 Rmv /replace up t05" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 S 60.00 $ 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 $ 30.00 $ 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 $ 20.00 $ 64 Annular and void space grouting. CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ 66 Hydromulch Seeding SY 0 50 50 $ 3.00 $ 150.00 67 Bypass Pumping, 6" or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 $ 10.00 $ 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports Drop manhole assembly, up to 8' deep Drop manhole assembly, over 8' deep Emergency mobilization LF 0 0 0 $ 100.00 $ 71 EA 01 0 0 $ 2,500.00 $ 72 VF 0 0 0 $ 500.00 $ 73 EA 1 1 0 $ 1,000.00 $ t otai t,nange urger rr i .M onstruction Date Finance Date Work Order Summary: Final Construction Cost $ 9,061.25 Initial Work Order $ 10,180.00 Change Order #1 $ (1,118.75) Director of Engineering Date City manager Date page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 C P.M. Construction and Rehabilitation, L.P. 4 East Erath uston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Item Description Unit Est. WO3 P.E.1 Quant. Quantities P.E.2 Quantities Final Unit Quantities Price Total this Estimate 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep . LF 170 170 0 170 $ 38.00 $6,460.00 21Pipe bursting 6" & 8" with 8" HOPE min. SDR 17, 8' -15' deep LF 0 0 0 0 S 40.00 $0.00 31Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 42.00 $0.00 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 45.00 $0.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 0 0 $ 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 0 0 $ 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 0 0 0 0 $ 5.00 50.00 14 Reconnect service - short side, 0' -8' deep EA 0 0 0 0 $ 500.00 50.00 15 Reconnect service - short side, over 8' deep EA 0 0 0 0 $ 700.00 $0.00 16 Reconnect service - long side, 0' -8' deep EA 0 0 0 0 $ 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 0 0 6.25 6.25 $ 85.00 $531.25 19 Repl /install new manhole, 0' -8' deep EA 0 0 0 0 $ 1,500.00 $0.00 20 New Manhole , over 8' deep VF 6 0 0 0 $ 200.00 $0.00 21 Replace /install ring and cover EA 0 0 0 0 $ 300.00 $0.00 22 Extra cement stabilized sand backfill, 2 TON 45 0 0 0 $ 20.00 $0.00 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deer EA 2 3 0 3 $ 300.00 $900.00 24j Point Rpr /obst rmv - pipe bursting, 8' - 15' EA 0 0 0 0 $ 400.00 $0.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depths LF 1 0 0 01 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 20 20 0 20 $ 1.00 $20.00 30 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 31 Trench Safety, 8' to 15' deep LF 0 0 0 0 $ 1.00 $0.00 32 Clean 6" to 12" Sewer LF 0 0 1 0 0 $ 3.00 $0.00 33 Clean 15" to 21" Sewer LF 0 0 0 0 $ 5.00 50.00 34 Clean 24" to 36" Sewer LF 0 0 0 0 $ 10.00 $0.00 35 TV Inspection of Sewer LF 0 0 0 0 $ 1.00 $0.00 36 Bypass Pumping, 3" pump Dav 0 0 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day. 0 0 0 0 $ $0.00 39 Bypass Pumping, 8" pump Day 0 0 0 0 $ $0.00 pe2wo3final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. is 04 East Erath uston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Item Description Unit Est. WO3 P.E.1 Quant. Quantities P.E.2 Quantities Final Unit Quantities Price Total this Estimate $0.00 41 1 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 S 1,750.00 $0.00 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 0 S 2,500.00 $0.00 43 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 $ 2,250.00 $0.00 44 Pt. Repair, 15"- 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 S 2,900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 1 EA 0 0 0 0 S 3,500.00 $0.00 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 0 S 4,000.00 $0.00 47 Pt. Repair, 21" - 36 ", 8'- 15' deep, up to 12 If EA 0 0 0 0 S 6,000.00 $0.00 481 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 1 EA 0 0 0 0 $ 8,000.00 $0.00 49 Extra length pt. Repair, all sizes, 0' - 8' deep LF 0 0 0 0 S 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8' - 15' deep LF 0 0 0 0 $ 120.00 $0.00 51 Extra length pt. Repair, all sizes, over15' deep LF 0 0 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 $ 65.00 $0.00 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 0 S 1,000.00 $0.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 0 S 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8' - 15' deep, 50 L.F. min. LF 0 0 0 0 $ 100.00 $0.00 57 f2mv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 0 S 150.00 $0.00 60 Rmv /replace up toy" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 0 0 $ 45.00 50.00 61 Rmv /replace up toy" concrete sidewalk/ddveway (includes sawcutting & reinforcement) SY 0 0 0 0 $ 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 0 $ 30.00 $0.00 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 0 0 S 20.00 $0.00 64 Annular and void space grouting CY 0 0 0 0 $ 100.00 $0.00 65 Flagman for direction of traffic MHR 0 0 0 0 S 20.00 $0.00 66 Hydromulch Seeding SY 0 50 0 50 $ 3.00 $150.00 67 Bypass Pumping, 6" or greater Day 0 0 0 0 S 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 0 S 10.00 $0.00 69 Root & tuberculation removal, 12" - 24" LF 0 0 0 0 S 20.00 $0.00 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports LF 0 0 0 0 S 100.00 50.00 71 Drop manhole assembly, up to 8' deep EA 0 0 0 0 $ 2,500.00 $0.00 72 Drop manhole assembly, over 8' deep VF 0 0 0 0 $ 500.00 $0.00 73 Emergency mobilization EA 1 1 01 1 $ 1,000.00 $1,000.00 pe2wo3final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 2 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #3 Emergency, Total Time Allowed: 5 Working Days Total Time Used: 3 Working Days Co struction Date Contract Summary: Current Work Order #2 Amount $9,061.25 Less 0% Retainage $ Less Previous Payments $ (6,103.50) Current Amount Due $ 957.75 E. Asst. Director of Engineering Date pe2wo3final 2' i� CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. Co1wo4 paget Orig. Final Cost Item Description Unit Quant. Quant. Diff. Price Difference 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0'-8' deep LF 1290 1258 -32 $ 38.00 $ (1,216.00) 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 40.00 $ 3 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 45.00 $ 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 42.00 $ 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 45.00 $ 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 01 0 $ 50.00 $ 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0'-8' deep LF 0 0 0 $ 55.00 $ 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 0 $ 60.00 $ 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 0 $ 75.00 $ 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0'-8' deep LF 0 0 0 $ 75.00 $ 11 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 0 $ 85.00 $ 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SOR 26, over 15' deep LF 0 0 0 $ 100.00 $ 13 Remove existing slipliner, all sizes and depths LF 570 1258 688 $ 5.00 $ 3,440.00 14 Reconnect service - short side, 0'-8' deep EA. 31 31 0 $ 500.00 $ - 15 Reconnect service - short side, over 8' deep EA 0 0 0 $ 700.00 $ 16 Reconnect service - long side, 0' 8' deep EA 0 0 0 $ 1,200.00 $ 17 Reconnect service - long side, over8'deep EA 0 0 0 S 1,500.00 $ 18 Manhole Wall Sealing VF 14 9.17 -4.83 $ 85.00 $ (410.55) 19 RepUnstall new manhole, 0' -8' deep EA 1 1 0 $ 1,500.00 $ 20 New Manhole, over 8' deep VF 0 0 0 $ 200.00 $ 21 Replace/install ring and cover EA 0 0 0 $ 300.00 S 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 0 0 0 $ 20.00 $ 23 Point Rpr /obst nnv - pipe bursting, 0'- 8' deep EA 3 0 -3 $ 300.00 $ (900.00) 24 Point Rpr /obst nnv - pipe bursting, 8'- 15' deep EA 0 0 0 $ 400.00 $ 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 0 $ 500.00 $ 26 Extra Length point repair, all depths LF 0 0 0 $ 60.00 $ 27 Well Point set up, up to 12 If EA 0 0 0 S 2,800.00 $ 28 Well Point, Extra length over 12 If LF 0 0 0 $ 20.00 $ 29 Trench Safety, 0' to 8' deep LF 120 80 -40 $ 1.00 1 $ (40.00) Co1wo4 paget [I] Co1wo4 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 11/22/2000 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 30 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 31 Trench Safety, 8' to 15' deep LF 0 0 0 $ 1.00 $ 32 Clean 6" to 12" Sewer LF 0 0 0 $ 3.00 $ 33 Clean 15" to 21" Sewer LF 0 0 0 $ 5.00 $ 34 Clean 24" to 36" Sewer LF 0 0 0 $ 10.00 $ 35 TV Inspection of Sewer LF 0 0 0 $ 1.00 $ 36 Bypass Pumping, 3" pump Day 01 0 0 $ 1.00 $ 37 Bypass Pumping, 4" pump Day 0 0 0 S 120 $ 38 Bypass Pumping, 6" pump Day 0 0 0 $ - $ 39 Bypass Pumping, 8" pump Day 0 0 0 $ - S 40 Pt. Repair, 6" - 12 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 1,250.00 $ 41 Pt. Repair, 6" - 12 ", 8'- 15' deep, up to 12 If EA 01 0 0 $ 1,750.00 $ 42 Pt. Repair, 6" - 12 ", over 15' deep, up to 12 If EA 0 0 0 $ 2,500.00 $ 43 Pt. Repair, 15" - 18 ", 0' - 8' deep, up to 12 If EA 0 0 0 $ 2,250.00 $ 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 0 $ 2,900.00 $ 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 If EA 0 0 0 $ 3,500.00 $ 46 Pt. Repair, 21" - 36 ", 0'- 8' deep, up to 12 If EA 0 0 0 $ 4,000.00 $ 47 Pt. Repair, 21" - 36", 8'- 15' deep, up to 12 If EA 0 0 0 $ 6,000.00 $ 48 Pt. Repair, 21" - 36 ", over 15' deep, up to 12 If EA 0 0 0 $ 8,000.00 $ 49 Extra length pt. Repair, all sizes, 0'- 8'deep LF 0_,. 0 0 $ 80.00 $ 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 0 $ 120.00 $ 51 Extra length pt. Repair, all sizes, overl6deep LF 0 0 0 $ 160.00 $ 52 Rmv /Rplace 6" - 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 65.00 $ 53 Rmv /Rplace 6" - 12 ", includes modified bedding, 8' - 15' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 54 Rmv /Rplace 6" - 12', includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 0 $ 1,000.00 $ 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 0 $ 75.00 $ 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 0 $ 100.00 $ 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 0 $ 125.00 $ 58 Auger & Encase 8" -10", all depths LF 0 0 0 $ 100.00 $ 59 Auger & Encase 12" -15 ", all depths LF 0 0 0 $ 150.00 $ 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 1 0 D 0 $ 45.00 S page2 c: Co1wo4 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 Change Order #1 on Work Order #4 11/22/2000 This work order included pipe bursting, service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to work on Country Club View & Country Club Drive. 61 Rmv /replace up t05' concrete sidewalk/ddveway (includes sawcutting & reinforcement) SY 0 0 0 $ 60.00 $ 62 Rmv /rep] up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 0 $ 30.00 $ 63 1' rock with no fines for bedding (incidental to point repairs) TON 01 0 0 $ 20.00 $ 64 Annular and void space grouting CY 0 0 0 $ 100.00 $ 65 Flagman for direction of traffic MHR 0 0 0 $ 20.00 $ 66 Hydromulch Seeding SY 120 200 80 $ 3.00 $ 240.00 67 Bypass Pumping, 6' or greater Day 0 0 0 $ 1.00 $ 68 Root & tuberculation removal, 6" - 12" LF 0 0 0 $ 10.00 $ 69 Root & tuberculat]on removal, 12" - 24' LF 0 0 0 $ 20.00 $ 70 Steel Casing, up to 12 ", above ground, coated and wrapped, including supports Drop manhole assembly, up to LF 0 0 0 $ 100.00 $ 71 8' deep Drop manhole assembly, over 8' EA 0 0 0 $ 2,500.00 $ 72 deep Emergency mobilization VF 0 0 0 $ 500.00 $ 73 EA 0 0 0 $ 1,000.00 $ Total Change or -19-�Tntm � � � - ;'� M Construction Date Director of Engineering Date Finance Date City manager Date Work Order Summary: Final Construction Cost $ 72,553.45 Initial Work Order $ 71,440.00 Change Order #1 $ 1,113.45 page3 CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 y P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF Est. W03 P.E.1 Unit Total this Item Description Unit I Quant. Quantities Price Estimate 1 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 0' -8' deep LF 1290 1258 $ 38.00 $47,804.00 2 Pipe bursting 6" & 8" with 8" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 40.00 $0.00 3117, Pipe bursting 6" & 8" with 8" HDPE min. SDR over 15' deep LF 0 0 $ 45.00 $0.00 4 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 0' -8' deep LF 0 0 $ 42.00 $0.00 5 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 45.00 $0.00 6 Pipe bursting 8" & 10" with 10" HDPE min. SDR 17, over 158' deep LF 0 0 $ 50.00 $0.00 7 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 0' -8' deep LF 0 0 $ 55.00 $0.00 8 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, 8' -15' deep LF 0 0 $ 60.00 $0.00 9 Pipe bursting 10" & 12" with 12" HDPE min. SDR 17, over 15' deep LF 0 0 $ 75.00 $0.00 10 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, 0' -8' deep LF 0 0 $ 75.00 $0.00 11 Pipe bursting 12" & 15" with 15" HDPE min. JSDR 17, min, PVC SDR 26, 8' -15' deep LF 0 0 $ 85.00 $0.00 12 Pipe bursting 12" & 15" with 15" HDPE min. SDR 17, min, PVC SDR 26, over 15' deep LF 0 0 $ 100.00 $0.00 13 Remove existing slipliner, all sizes and depths LF 570 1258 $ 5.00 $6,290.00 14 Reconnect service -short side, 0' -8' deep EA 31 31 $ 500.00 $15,500.00 15 Reconnect service - short side, over 8' deep EA 0 0 $ 700.00 $0.00 16 Reconnect service - long side, 0' -8' deep EA 0 0 $ 1,200.00 $0.00 17 Reconnect service - long side, over 8' deep EA 0 0 $ 1,500.00 $0.00 18 Manhole Wall Sealing VF 14 9.17 $ 85.00 $779.45 19 Repl /install new manhole, 0' -8' deep EA 1 1 $ 1,500.00 $1,500.00 20 New Manhole , over 8' deep VF 0 0 $ 200.00 $0.00 211 Replace /install ring and cover EA 0 1 1 $ 300.00 $300.00 22 Extra cement stabilized sand backfill, 2 sk. /ton TON 0 0 $ 20.00 $0.00 23 Point Rpr /obst rmv - pipe bursting, 0'- 8' deep EA 3 0 $ 300.00 $0.00 24 Point Rpr /obst rmv - pipe bursting, 8'- 15' deep EA 0 0 $ 400.00 1 $0.00 25 Point Rpr /obst rmv - pipe bursting, over 15' deep EA 0 0 $ 500.00 $0.00 26 Extra Length point repair, all depths LF 0 0 $ 60.00 $0.00 27 Well Point set up, up to 12 If EA 0 0 $ 2,800.00 $0.00 28 Well Point, Extra length over 12 If LF 0 0 $ 20.00 $0.00 29 Trench Safety, 0' to 8' deep LF 120 80 $ 1.00 $80.00 30 Trench Safety, 8' to 15' deep LF 0 0 $ 1.00 $0.00 31 Trench Safety, 8' to 15' deep LF 0 0 $ 1.00 $0.00 pelwo4final CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut -off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days Item Description Unit Est. W03 P.E.1 Quant. Quantities Unit Price Total this Estimate 32 Clean 6" to 12" Sewer LF 0 0 $ 3.00 $0.00 33 Clean 15" to 21" Sewer LF 0 0 $ 5.00 $0.00 34 Clean 24" to 36" Sewer LF 0 0 $ 10.00 $0.00 35 TV Inspection of Sewer LF 0 0 $ 1.00 $0.00 36 Bypass Pumping, 3" pump Day 0 0 $ 1.00 $0.00 37 Bypass Pumping, 4" pump Day 0 0 $ 1.00 $0.00 38 Bypass Pumping, 6" pump Day 0 0 $ - $0.00 39 Bypass Pumping, 8" pump Day 0 0 $ - $0.00 40 1 Pt. Repair, 6" - 12 ", 0' - 8' deep, up to 12 If EA 0 0 $ 1,250.00 $0.00 411 Pt. Repair, 6" - 12 ", 8' - 15' deep, up to 12 If EA 0 0 $ 1,750.00 $0.00 6" - 12 ", over 15' deep, up to 12 If EA 0 0 $ 2,500.00 $0.00 __._._42..Pt...Repair, 431 Pt. Repair, 15" - 18 ", 0'- 8' deep, up to 12 If EA 0 0 $ 2,250.00 $0.00 44 Pt. Repair, 15" - 18 ", 8'- 15' deep, up to 12 If EA 0 0 $ 2,900.00 $0.00 45 Pt. Repair, 15" - 18 ", over 15' deep, up to 12 if EA 0 0 $ 3,500.00 $0.00 46 Pt. Repair, 21" - 36 ", 0' - 8' deep, up to 12 If EA 0 0 $ 4,000.00 $0.00 47 Pt. Repair, 21" -.36 ", 8'- 15' deep, up to 12 If EA 0 0 $ 6,000.00 $0.00 481f Pt. Repair, 21" - 36 ", over 15' deep, up to 12 EA 0 0 $ 8,000.00 $0.00 49 Extra length pt. Repair, all sizes, 0'- 8' deep LF 0 0 $ 80.00 $0.00 50 Extra length pt. Repair, all sizes, 8'- 15' deep LF 0 0 $ 120.00 $0.00 51 Extra length pt. Repair, all sizes, overl5' deep LF 0 0 $ 160.00 $0.00 52 Rmv /Rplace 6"- 12 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 65.00 $0.00 53 IRmv/Rplace 6" - 12 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 $ 75.00 $0.00 54 Rmv /Rplace 6" - 12 ", includes modified bedding, over 15' deep, 50 L.F. min. LF 0 0 $ 1,000.00 $0.00 55 Rmv /Rplace 15" - 18 ", includes modified bedding, 0'- 8' deep, 50 L.F. min. LF 0 0 $ 75.00 $0.00 56 Rmv /Rplace 15" - 18 ", includes modified bedding, 8'- 15' deep, 50 L.F. min. LF 0 0 $ 100.00 $0.00 57 Rmv /Rplace 15" - 18 ", includes modified bedding, over 15' deep, 50 L.F. min. 0 0 $ 125.00 $0.00 58 Auger & Encase 8" -10 ", all depths LF 0 0 $ 100.00 $0.00 59 Auger & Encase 12" -15 ", all depths LF 0 0 $ 150.00 $0.00 60 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 $ 45.00 $0.00 61 Rmv /replace up to5" concrete sidewalk/driveway (includes sawcutting & reinforcement) SY 0 0 $ 60.00 $0.00 62 Rmv /repl up to 2" HMAC, Type D, (incl. Saw cut,tack coat, base repair) SY 0 0 $ 30.00 $0.00 63 1" rock with no fines for bedding (incidental to point repairs) TON 0 0 $ 20.00 $0.00 64 Annular and void space grouting CY 0 0 $ 100.00 $0.00 pe1wo4final A r CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - Year 2000 P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Pay Estimate Cut-off date November 16, 2000 (Invoice Date) Work Order #4, Total Time Allowed: 10 Working Days Total Time Used: 10 Working Days -a Construction Date Contract Summary: Current Work Order #2 Amount $72,853.45 Less 0% Retainage $ Less Previous Payments $ - Current Amount Due $ 72,853.45 p:e1 wo4final Asst. Director of Engineering Est. W03 P.E.1 Unit Total this Item Description Unit Quant Quantities Price Estimate 651 Flagman for direction of traffic MHR 0 0 $ 20.00 $0.00 66 Hydromulch Seeding SY 120 200 $ 3.00 $600.00 67 1 Bypass Pumping, 6" or greater Day 0 0 $ 1.00 $0.00 68 Root & tuberculation removal, 6" - 12" LF 0 0 $ 10.00 $0.00 69 Root & tuberculation removal, 12" - 24" LF 0 0 $ 20.00 $0.00 Steel Casing, up to 12 ", above ground, 70 coated and wrapped, including supports LF 0 0 $ 100.00 $0.00 71 Drop manhole assembly, up to 8' deep EA 0 0 $ 2,500.00 $0.00 721 Drop manhole assembly, over 8' deep VF 0 0 $ 500.00 $0.00 73J Emergency mobilization EA 0 0 $ 1,000.00 $0.00 $72,853.45 Total $ Less 0% Retainage $ - Less Total Previous Payments on WO 3 $ 72,853.45 Payment Due This Estimate -a Construction Date Contract Summary: Current Work Order #2 Amount $72,853.45 Less 0% Retainage $ Less Previous Payments $ - Current Amount Due $ 72,853.45 p:e1 wo4final Asst. Director of Engineering