Ordinance No. 8,88020000413 -4 ORDINANCE NO. 8880 AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 2 WITH HORSESHOE CONSTRUCTION, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE THOMPSON ROAD WATER AND SEWER PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF THIRTY -ONE THOUSAND FOUR HUNDRED THIRTY -EIGHT AND 01 /100 DOLLARS ($31,438.01) TO HORSESHOE CONSTRUCTION, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Horseshoe Construction, Inc., for the Thompson Road Water and Sewer project (the "Project "); and WHEREAS, a deduct change order in the amount of TWO THOUSAND FOUR HUNDRED FORTY -THREE AND 84/100 DOLLARS ($2,443.84) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Thompson Road Water and Sewer project and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Horseshoe Construction, Inc., the sum of THIRTY -ONE THOUSAND FOUR HUNDRED THIRTY -EIGHT AND 01 /100 DOLLARS ($31,438.01); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 2 with Horseshoe Construction, Inc., to adjust the final unit bid quantities for the Thompson Road Water and Sewer project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. v 20000413 -4a Section 3: That the Certificate of Final Acceptance heretofore 'issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Horseshoe Construction, Inc., in the amount of THIRTY -ONE THOUSAND FOUR HUNDRED THIRTY -EIGHT AND 01 /100 DOLLARS ($31,438.01) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13th day of April, 2000. _x� C. PETE C. ALFAR , Mayor ATTEST: GARY W. ,8MITH, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, SR. ity Attorney c:WyDocuments\ Council\ 99 -00\ April \ChOrd2FinalPayThompsonRd W aterSewer 0 2 Col CITY OF BAYTOWN Thompson Road Water and Sewer Change Order #2 April 4,2000 This change Is for adding the removal of casing on an existing 24" Sewer line. rerouting the proposed water line under an existing BAWA line, Installing 32 feet of 8" Augered and encased sewer line and balancing final quantities. Total Change Order #2 17, Il aJ.eall 1. In consideration for the above change, it Is mulually agreed that the contract price is decreased $2,443.84. 2. Also, II Is mutually understood and agreed that the time of performance for all work is not Increased and remains 75 worxlnlg days. 3. Finally, It Is understood and agreed that this change order Is a full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or Indirectly attributable to the changes ordered herein, for all delays, and Impacts related thereto and for performance of the changes within the time stated. 4. Contract Summary Contract Award Amount $188,703.00 (Original P.O. #2001742 of 5141,527.25 plui administrative Change Order 01 lransfering Developer's check of $47,175.75.) Change Order 02 (deduct) $ (2.443.54) Amended Contract Amount $188.259.18 Contract Award Performance Duration 75 Change Order 02 (no change) 0 Amended Performance Duration 75 Horseshoe Construction, Inc Dale Finance Director Date EXHIBIT A Direclor of Engineering 8 Inspection Date City Manager Dale Paget - Award Final Quantity CO#1 Item Description Unit Amount. Quantity Difference Price 1 12" Water -Open Cut L.F. - 1,140 - 1240.5 101 $ 33.00 $ 3,316.50 212' Water -Augered L.F. 409 316 -93 $ 66.00 $ 6,138.00 3 12" Gate Valves Ea. 3 2 •1 $ 1,000.00 $ 1,000.00 4 12'x12' Tapping Sleeve w/Box Ea. 1 1 0 $ 3,000.00 S 5 Fire Hydrant Assembly Ea. 2 2 0 $ 1,970.00 $ 6 Extra Depth Bury for Fire Hydrai Hydra i V. F. 5 0 -5 $ 60.00 $ 300.00 7 Waterline Trench Safety Systeir i L.F. 50 Sol 0 $ 5.00 $ 8 12' Gravity Sewer, PVC, SDR 26, Open Cut, All Depths. CIP LF 1,545 147 -69 $ 45.00 $ (3.105.00 9 8' Gravity Sewer, Open Cut L.F. 40 92 52 $ 45.00 $ 2,340.00 10 12' Gravity Sewer, Augered L.F. 10 0 -10 $ 278.00 $ 2,780.00 11 12" Gravity Sewer, Augered an Encased L.F. 64 3 -32 $ 146.00 $ (4,672.00 -12 Manhole, 4 foot diameter Concrete. 0.8' de th , CIP EA 6 6 0 $ 1,400.00 $ 13 Extra Depth, 4 ft. Diameter Manhole, CIP VF 44 46.7 3 $ 100.00 $ 275.00 U Sanitary Sewer Plus Ea. 2 41 2 $ 100.00 $ 200.00 15 Sanitary Sewer Trench Safety System, CIP LF 1,450 1561 118 $ 3.00 S 354.00 16 Well Pointing, CIP L.F. 100 147f 1,376 $ 5.00 -S 6.680.00 17 Turl Establishment - Hydromulch L.F. 2,800 23 -250 $ 2.00 $ (500.00 181 Concrete Drive and Roadway S.Y. 20 C -20 $ 50.00 1 $ 1,000.00 19 Asphalt Drive 8 Raodw2y S.Y. 20 C -20 $ 40.00 S 800.00 20 Gravel, Limestone 8 Other Driveway or Roadway S.Y. 20 2ol 0 $ 10.00 $ 21 Harris County Road Bond L.S. 1 1 0 $ 250.00 $ 22a Extra Bank Sand C.V. 50 -50 S 10.00 $ 500.00 22b Extra Crushed Limestone Bedding C.Y. 5o -50 $ 25.00 $ (1,250.00 22c Extra Cement Stabilized Sand Tons 5 -5 S 20.00 $ 100.00 22dj Extra Gass A Concrete C.V. 20 -20 $ 100.00 $ 2.000.00 22e Extra Reinforcing Steel Lbs 1 1.000 •1,000 $ 1.00 $ 1,000.00 Change Order 02 23 Remove Casing C 24" Sewer on 110 Feeder L.S. 01 11 1 S 880.04 S 880.04 24 Re -route water line under BAWA line L.S. 0 1 1 $ 3,847.62 $ 3,847.62 25 8' Sewer - Augered and encased L.F. 0 32 32 $ 144.00 S 4,808.00 Total Change Order #2 17, Il aJ.eall 1. In consideration for the above change, it Is mulually agreed that the contract price is decreased $2,443.84. 2. Also, II Is mutually understood and agreed that the time of performance for all work is not Increased and remains 75 worxlnlg days. 3. Finally, It Is understood and agreed that this change order Is a full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or Indirectly attributable to the changes ordered herein, for all delays, and Impacts related thereto and for performance of the changes within the time stated. 4. Contract Summary Contract Award Amount $188,703.00 (Original P.O. #2001742 of 5141,527.25 plui administrative Change Order 01 lransfering Developer's check of $47,175.75.) Change Order 02 (deduct) $ (2.443.54) Amended Contract Amount $188.259.18 Contract Award Performance Duration 75 Change Order 02 (no change) 0 Amended Performance Duration 75 Horseshoe Construction, Inc Dale Finance Director Date EXHIBIT A Direclor of Engineering 8 Inspection Date City Manager Dale Paget CITY OF BAYTOWN Project: Thompson Road Water and Sewer Horseshoe Construction, Inc 7014 Spencer Highway Pasadena, Texas 77505 Pay Estimate No. 3 (flnal) through 312312000 Total Time Allowed: 75 Working Days Total Time Used: 49 Days Horseshoe Construction, Inc Date Contract Summary: Original Contract Amount $ 188,703.00 Change Orders $ (2,443.84) Current Contract Amount $ 186,259.16 pe3final Director of Engineering & Inspections Date Est. P.E.1 P.E.2 P.E. 3 Total Unit Project Cost Item Description Unit. Quant. Quantities Quantities Quantities Quantities I Price To Date 1 12' Water -Open Cut L.F. 1,140 0 1240.5 0 1240.5 S 33.00 $ 40,936.50 2 12' Water - Augered L.F. 409 0 316 0 316 $ 66.00 $ 20,856.00 3 12' Gate Valves Ea. 3 0 2 0 2 $ 1,000.00 $ 2,000.00 4 12'x12' Tapping Sleeve w /Box Ea. 1 0 1 0 1$ 3,000.00 $ 3,000.00 5 Fire Hydrant Assembly Ea. 21 0 2 0 2$ 1,970.00 1 $ 3,940.00 6 Extra Depth Bu for Fire Hydrants V.F. 5 0 0 0 0 $ 60.00 $ - 7 Waterline Trench Safety S stetm L.F. 50 0 50 0 50 S 5.00 $ 250.00 8 12' Gravity Sewer, PVC, SDR 26, Open Cut, All Depths, CIP LF 1,545 847 629 0 1475 $ 45.00 $ 66,420.00 9 8' Gravity Sewer, Open Cut 'L.F. 40 0 92 0 92 $ 45.00 $ 4,140.00 10 12" Gravity Sewer, Augered L.F. 10 0 0 0 0 $ 278.00 $ 11 12' Gravity Sewer, Augered and Encased L.F. 64 0 32 0 32 $ 146.00 $ 4,672.00 12 Manhole, 4 foot diameter Concrete, (0-8' depth), CIP EA 8 3 3 0 6 $ 1,400.00 $ 8,400.00 13 Extra Depth, 4 ft. Diameter Manhole, CIP VF 441 25 21.75 0 46.75 $ 100.00 $ 4,675.00 14 Sanitary Sewer Plugs Ea. 2 0 4 0 4 $ 100.00 $ 400.00 15 Sanitary Sewer Trench Safety System, CIP LF 1,450 847 721 0 1568 S 3.00 S 4,704.00 16 Well Pointing, CIP L.F. 100 647 629 01 1476 $ 5.00 $ 7,380.00 17 Turf Establishment - Hydromulch L.F. 2,600 0 0 23501 2350 S 2.00 $ 4,700.00 18 Concrete Drive and Roadway S.Y. _ 20 0 0 0 0 $ 50.00 $ 19 Asphalt Drive & Raodway S.Y. 20 0 0 0 0 $ 40.00 $ 20 Gravel, Limestone & Other Driveway or S.Y. 20 0 0 20 20 $ 10.00 $ 200.00 21 Harris County Road Bond L.S. 1 1 0 0 1 $ 250.00 $ 250.00 22a Extra Bank Sand C.Y. 501 0 0 0 0 $ 10.00 $ 22b Extra Crushed Limestone Bedding C.Y. 50 0 0 0 0 $ 25.00 $ 22c Extra Cement Stabilized Sand Tons 5 0 0 0 0 $ 20.00 $ 22d Extra Class A Concrete C.Y. 20 0 0 0 0 $ 100.00 S 22e Extra Reinforcing Steel Lbs 1.000 0 0 0 0 S 1.00 $ C.O. 1 23 Remove Casing @ 24' Sewer on 110 Feeder L.S. 1 0 0 1 1 $ 880.04 $ 880.04 24 Re -route water line under BAWA line L.S. 1 0 0 1 1 S 3,847.62 $ 3,847.62 25 8' Sewer - Augered and encased L.F. 321 0 0 32 32 $ 144.00 $ 4,608.00 Total to Date S 186,259.16 Less 0% Retalnage t _ $ Less Total Previous Payments P.E. #1 & #2) °. -w $ 154,821.15) Total Due This Estimate �. - -_: __ tr'M 1a k. WAC- :mot _- S 31,438.01 Horseshoe Construction, Inc Date Contract Summary: Original Contract Amount $ 188,703.00 Change Orders $ (2,443.84) Current Contract Amount $ 186,259.16 pe3final Director of Engineering & Inspections Date