Ordinance No. 8,87920000 +13 -3 ORDINANCE NO. 8879 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 2 WITH PAVECON, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE CITY PARK PARKING LOT PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF ONE HUNDRED ONE THOUSAND SIX HUNDRED SEVENTY - SIX AND NO /100 DOLLARS ($101,676.00) TO PAVECON, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Pavecon, Inc., for the City Park Parking Lot project (the "Project "); and WHEREAS, a deduct change order in the amount of EIGHT HUNDRED SIXTY -EIGHT AND 50 1100 DOLLARS ($868.50) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed -in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the City Park Parking Lot project and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Pavecon, Inc., the sum of ONE HUNDRED ONE THOUSAND SIX HUNDRED SEVENTY -SIX AND NO /100 DOLLARS ($101,676.00); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 2 with Pavecon, Inc., to adjust the final unit bid quantities for the City Park Parking Lot project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. 200004i3 -3a ® Section 3: That the . Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Pavecon, Inc., in the amount of ONE HUNDRED ONE THOUSAND SIX HUNDRED SEVENTY -SIX AND NO /100 DOLLARS ($101,676.00) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13th day of April, 2000. PETE C. ALFARO, Mayor ATTEST: GA &"Y W. SMITH, City Clerk ' IM,' IJAUVa ACIO RAMIREZ, S City Attorney c: \MyDocuments \Council \99 -00\ April\ ChOrd2FinalpayCityParkParkingLot 0 2 CHANGE OWNER ORDER ENGINEER ❑ CONTRACTOR ❑ PROJECT: City Park Parking Lot Construction Central Little League Park TO CONTRACTOR Pavecon, Inc. 2219 Aldine Bender Houston, Texas 77032 Contract Time is 45 calendar days. Work was substantially complete in 39 calendar days on 3 -9 -00. The Contract is changed as follows: CHANGE ORDER NUMBER: Final Balancing DATE: April 3, 2000 ENGINEER'S PROJECT NO: 99 -3061 CONTRACT DATE: December 23, 1999 CONTRACT FOR: Parking Lot Construction This is the Final Balancing Change Order for the project. The final actual quantities of work are shown on the attached spreadsheet. Not valid until signed by the Owner, Engineer and Contractor. The original (Contract Sum)( ) was .................. ............... ......... $101,592.00 Net change by previously authorized Change Orders ...................................... ............................... $ 952.50 The (Contract Sum) ( ) prior to this Change Order was ....................... $102,544.50 The (Contract Sum) ( ) will be (ice) (decreased) () by this Change Order in the amount ......... ........................... I. ....................... ... .. . ) The Final Contract Sum is ....................................................... ............................... $1 0 1 6 76.00 The Contract Time will be O (unchanged) by (0) days. Busch, Hutchison & Associates, Inc. Pavecon, Inc. City of Baytown ENGINEER CONTRACTOR OWNER . 1209 Decker Drive, Suite 100 5402 Hwy. 6. 2401 Market Street (P.O. Box 424) Baytown, Texas 77520 Hitchcock, Texas 77563 Baytown Texas 77522 -0424 ADDRESS ADDRESS ADDRESS BY J. .2�� DA X,5 o0 Im DATE IM DATE IF Pay Item Cont. Quan Units Unit Price Contract Amount Final Quan. Total Remove 2 -3 Inches Loose Top Material Shape and Compact Existing Milled Asphalt Com fete -in -Place 0 S $0.84 $0.00 0 $0.00 2 Black Base, 8" Minimum Thickness Complete -in -Place 01 Tons $48.00 $0.00 0 $0.00 3 Type B commercial lime slurry or Type A Hydrated Lime for Subgrade Stabilization. 38lbs /s Com lete-i n-p lace 0 Tons $107.00 $0.00 0 $0.00 4 Mixing and Compacting 6" Lime Stabilized Sub grade. Com fete -in -Place 0 S $3.00 $0.00 0 $0.00 5 1 1/2" Class D HMAC Surfacing Complete-in-Place 330 Tons $42.00 $13,860.00 330 $13,860.00 6 Tack Coat for Base Treatment at 0.05 - 0.15 Gal /SY, Complete-in-Place 01 GAL $2.10 $0.00 50 $105.00 7 6 Foot Wide Concrete Sidewalk Complete-in-Place 668 SY $29.50 $19,706.00 668 $19,706.00 8 17" Concrete Dumpster Pad Complete-in-Place 139 S $36.00 $5004.00 139 $5,004.00 9 16'Wood Fence with 2 -6 Ft. Gates Com lete -in -Place 0 LF $29.00 $0.00 0 $0.00 10 16" Steel Pipe Bollard Set in Concrete Complete-in-Place 3 EA $218:00 $654.00 3 $654.00 11 6 Automobile and 2 Van Handicapped Signs in Accordance with TMUTCD 8 EA $105.00 $840.00 8 $840.00 12 R1 -1 Stop Signs in Accordance with TMUTCD Complete-in-Place 2 EA $150.00 $300.00 2 $300.00 13 White Parking Lot Striping 4" Wide lComplete-in-Place 1060 SF $0.50 $530.00 1060 $530.00 14 Grate Inlets, Complete -in -Place 0 EA $1,500.00 $0.00 0 $0.00 15 12" RCP ASTM C -76, Class III, Wall B, T &G Complete-in- Place 0 LF $26.00 $0.00 0 $0.00 6 15" RCP ASTM C -76, Class III, Wall B, T &G lComplete-in-Place 0 LF $29.00 $0.00 0 $0.00 17 Connect Proposed Storm Sewer to Existing Inlets, Complete-in-Place 11 0 EA $500.00 $0.00 0 $0.00 18 Parking Lot Excavation 287 CY $ 11.00 $3,157.00 287 $3,157.00 1 White Painted Handicapped Space Symbols 'om lete -in -Place 8 EA $6.00 $48.00 8 $48.00 17 T Alternate Bid Items 1 R and Compact Existing Milled Asphalt Complete-in-Place 0 S $1.20 $0.00 0 $0.00 2 Black Base, 8" Minimum Thickness Complete -in -Place 0 Tons $44.00 $0.00 0 $0.00 3 Type B Commercial Lime Slurry or Type A Hydrated Lime for Subgrade Stabilization. 38lbs /s Com lete -in- place 0 Tons $10700 $0.00 0 $0.00 4 Mixing and Compacting 6" Lime Stabilized Sub grade. Complete-in-Place 0 S $3.00 $0.00 0 $0.00 5 1 1/2" Class D HMAC Surfacing Complete-in-Place 170 Tons $42.00 $7,140.00 183.95 $7,725.90 6 MC 30 Prime Coat for New Base Treatment at 0.25 -0.35 Gal /SY, Com lete -in -Place 0 GAL $2.10 $0.00 0 $0.00 7 White Parking Lot Striping 4" Wide Com lete -in -Place 180 SF $0.50 $90.00 180 $90.00 8 Parking Lot Excavation 250 C $10.00 $2,500.00 2501 $2,500.00 Chan a Order Number 1 Added Items 1 Portland Cement Type I (ASTM C150) 82lbs /s Complete-in- Place 221 Tons $115.00 $25,415.00 207.44 $23,855.60 2 Mixing and Compacting 12" Portland Cement Stabilized Sub grade. Complete-in-Place 5400 S $2.55 $13,770.00 5400 $13,770.00 3 I, Fence Crete with 3 -6 Foot Gates Complete-in- Place 48 LF $115.00 $5,520.00 48 $5,520.00 4 Deliver Milled Asphalt for Base Material Complete-in-Place 3651 C $7.70 $2,810.50 365 $2,810.50 i 5 Remove Curb and Gutter and Dispose of. .Complete-in-Place 120 LF $10.00 $1,200.00 120 $1,200.00 6 Curing Material for Cement Stabilized Base 0.2 Gal /SY, Complete-in-Place 0 GAL $2.10 $0.00 0 $0.00 CONTRACT $102,544.50 AMOUNT FINAL $101,676.00 COST