Loading...
Ordinance No. 8,84620000224 -7 ORDINANCE NO. 8846 ® AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY MANAGER AND THE CITY CLERK OF THE CITY OF BAYTOWN TO EXECUTE AND ATTEST TO A CONTRACT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR SUPPLEMENTAL FUNDING FOR PHASE III OF THE GOOSE CREEK STREAM GREENBELT TRAIL; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. n BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager and the City Clerk of the City of Baytown to execute and attest to a contract with Texas Department of Transportation for supplemental funding for Phase III of the Goose Creek Stream Greenbelt Trail. A copy of said contract is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24th day of February, 2000. e'& PETE C. ALFARO, Mayor ATTEST: I "'a) C 7AR ',ARV W. S ity Clerk APPROVED AS TO FORM: — r-)z2- ,,L,< ACIO RAMIREZ, 6D City Attorney c: \MyDocumen is \Council \99 -00\ February\ TXDOTcontract4PhaseIIIGGSGreenbeltTrail. doc CSJ 0912 -71 -507 ® From SH 146 to the end of Arizona Street in Baytown CSJ 0912 -71 -429 CSJ 0912 -71 -915 VA: Baytown Goose Creek Hike and Bike Trail From the end of Arizona Street to Decker Drive in Baytown THE STATE OF TEXAS § THE COUNTY OF TRAVIS § AMENDMENT ONE TO THE AGREEMENT (SURFACE TRANSPORTATION PROGRAM CATEGORY 4B TRANSPORTATION ENHANCEMENTS AND CATEGORY 5 CONGESTION MITIGATION AND AIR QUALITY) THIS AMENDMENT, is made by and between the State of Texas, acting by and through the Texas Department of Transportation, hereinafter called the "State" and the City of Baytown, Texas, hereinafter called the "City". WHEREAS, the State and the City executed an agreement on the 15th day of February 1995 concerning the construction of an multipurpose bicycle /pedestrian facility with landscaping and historic preservation from SH 146 to Decker Drive along Goose Creek in Baytown; and WHEREAS, the portion of the project from SH 146 to the end of Arizona Street (Phase I) has been let to contract by the State and. construction has been completed; and WHEREAS, the cost of the Phase 2 project from the end of Arizona Street to Decker Drive has increased significantly from the original nomination and there are no additional Enhancement Program funds available for the project; and WHEREAS, Title 23 U.S.C. Section 149 establishes the Congestion Mitigation and Air Quality Improvement Program ( "CMAQ ") to contribute to attainment of the national ambient air quality standard to be implemented by the State's Transportation Agencies; and WHEREAS, Houston is classified as a severe ozone non - attainment area, and the State must use ® funds in ozone and carbon monoxide non - attainment areas; and 1/27/2000 1 EXHIBIT A WHEREAS, Title 23 U.S.C. Section 120 establishes that the federal share of funding for ® Congestion Mitigation and Air Quality Programs will not exceed eighty percent (80 %) of the Project cost; and v WHEREAS, the Project has been approved by the Federal Highway Administration and the Texas Transportation Commission for additional funding under the Congestion Mitigation and Air Quality Program as indicated in the 2000 -2002 Transportation Improvement Program, a page of which is attached hereto and identified as "Exhibit A "; and WHEREAS, the original enhancement project is also shown in the 2000 -2002 Transportation Improvement Program a page of which is attached hereto and identified as "Exhibit B "; and WHEREAS, these changes necessitate the amendment of the agreement; and NOW THEREFORE, it is agreed to amend certain segments of the Baytown Goose Creek Bikeway project funding agreement as follows: SECTION 5 PARAGRAPH A AND B These sections shall be voided in their entirety and replaced with the following: 5. FUNDING RESPONSIBILITIES A. The estimated total cost of all phases of the Project, including construction engineering and testing services, is $2,210,750. Congestion Mitigation and Air Quality funding will total $806,250 and Enhancement funding will total $1,404,500. B. The State will be responsible to secure the federal share of funding required for the development and construction of all phases of the Project. The federal share for the development and construction of all phases of the Project is eighty percent (80 %) of the total estimated cost of all phases of the Project, not to exceed $1,768,600. The Federal portion of the Congestion Mitigation and Air Quality funding will total $645,000 and Enhancement funding will total $1,123,600. The City will be responsible to comply with the cost principles established in OMB Circular A -87, "Cost Principles for State and Local Governments" and for any non - federal participation costs associated with all phases of the Project. 1/27/2000 2 ® SECTION 14 This section shall be voided in its entirety and replaced with the following: C 14. INSPECTION OF CITY'S BOOKS AND RECORDS The parties will, for purpose of termination of the agreement prior to completion, examine the books and records of the other party for the purpose of checking the amount of the work performed at the time of contract termination. The parties shall maintain all books, documents, papers, accounting records and other documentation relating to costs incurred under this agreement and other documentation relating to costs incurred under this agreement and shall make such materials available to the City, State, Federal Highway Administration (FHWA) or their duly authorized representatives for four (4) years from the date of final payment under this contract or until impending litigation is resolved. Additionally, the City, State, FHWA, and their duly authorized representatives shall have access to all records of the parties which are directly applicable to this agreement for the purpose of making audits, examinations, excerpts, and transcriptions. SECTION 15 This section shall be voided in its entirety and replaced with the following: 15. OMB A -133 AUDIT REQUIREMENTS The City shall comply with the requirements of the Single Audit Act of 1984, P.L. 98- 502, ensuring that the single audit report includes the coverage stipulated in OMB Circular No. A -133. All other terms and conditions of the contract are unchanged and remain in full force and effect. 1/27/2000 3 IN TESTIMONY HEREOF, the parties hereto have caused these presents to be executed in duplicate counterparts. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission under the Authority of Minute Order No. 100002 and Administrative Circular 26 -93 and superseded by Stand Alone Manual Notice 98 -3, for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved by the Texas Transportation Commission. 1/27/20.00 By: Jennifer D. Soldario Director Contract Services Office Date of Execution CITY OF BAYTOWN By: Typed Name Title Date ATTEST: Secretary 4 2 -40 2000 -2002 TRANSPORTATION IMPROVEMENT PROGRAM Ell, COMMENTS 0912 -71 -915 VA TRANSPORTATION IMPROVEMENT PROGRAM GOOSE CREEK TRAIL FROM S OF W TEXAS AVE HARRIS W TEXAS AVE (PHASE 2) HOUSTON DISTRICT CONSTRUCT HIKEBIKE TRAIL 5 SUPPLEMENTAL FUNDING TO ENHANCEMENT PROJECT HOUSTON - GALVESTON MPO VA HOUSTON VARIOUS 2001 50.00 CSJ HWY APPN 1 COST 1 FED COST PROD ID DISTRICT LIMITS FROM APPN 2 COST 2 STATE COST LET DATE COUNTY LIMITS TO APPN 3 COST 3 LOCAL COST RVN DATE OTHER TYPE OF WORK APPN 4 COST 4 LOCAL CONT Ell, COMMENTS 0912 -71 -915 VA HOUSTON GOOSE CREEK TRAIL FROM S OF W TEXAS AVE HARRIS W TEXAS AVE (PHASE 2) OTHER CONSTRUCT HIKEBIKE TRAIL 5 SUPPLEMENTAL FUNDING TO ENHANCEMENT PROJECT 0912 -71 -916 VA HOUSTON VARIOUS HARRIS 50.00 OTHER INTERMODAL CONGESTION QUICK RESPONSE TEAM 0912 -71 -917 VA HOUSTON $ARBOURS CUT QUEUE LANES HARRIS 50.00 OTHER CONSTRUCT QUEUE LNS ON ALTWATER DR/TRAFFIC 5 CROSSOVERS 0912 -71 -920 VA HOUSTON VARIOUS HARRIS OTHER FY 2001:TROLLEY /ACTIVI Y CENTER SHUTTLES 0912.71 -922 VA•- HOUSTON VARIOUS HARRIS 50.00 OTHER FY 200LINSTALL CHILLED WATER COOLING SYS @ 6 5 BUS OP FAC 0912 -71 -924 VA HOUSTON VARIOUS HARRIS 50.00 OTHER FY 2001 TUNDING FOR OPERATING ASSIST. OF I I NEW 5 SERVICE ROUTE Thursday. May 27. 1999 Houston - Galveston Area Council CMAQ 5806.250.00 TOTAL COST S0.00 5645,000.00 50.00 50.00 50.00 5 CMAQ CMAQ 5500,000.00 5806,250.00 50.00 $400,000.00 50.00 5100,000.00 50.00 5 CMAQ CMAQ 53,903.000.00 en no 5 CMAQ CMAQ 52,850,000.00 TOTAL COST S0.00 5645,000.00 50.00 50.00 50.00 5 CMAQ CMAQ 52,800.000.00 5806,250.00 $0.00 $400,000.00 50.00 5100,000.00 50.00 5 CMAQ CMAQ 53.590.804 00 50.00 50.00 50.00 5 CMAQ EXHIBIT A $3,122.400.00 960432.XX 50.00 01/08 5780,600.00 C.E.R 50.00 53,903,000.00 52,280,000.00 . PHASE TOTAL COST 01108 5645,000.00 HO.HR_01540 50.00 01 /08 5161.250.00 C.E.R 50.00 960760 -XX 5806,250.00 01/08 $400,000.00 990138-XX 5100,000.00 01/08 50.00 C,E,R 50.00 5500.000.00 $3,122.400.00 960432.XX 50.00 01/08 5780,600.00 C.E.R 50.00 53,903,000.00 52,280,000.00 T99064 -XX $0.00 01108 5570,000.00 C.E.R 50.00 52,850,000.00 52.240.000.00 960760 -XX 50.00 01/08 5560.000.00 C.E.R $0.00 52,800,000.00 52.872.643.00 T96("52A -XX 50.00 01 /08 5718.160.00 C.E.R 50.00 53,590.804.00 Paec 37 of 57 May 21, 1999 ti I CHAPTER 22-7 TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT HOUSTON - GALVESTON MPO 2000 CSJ HWY APPN 1 COST I FED COST PROD ID DISTRICT LIMITS FROM APPN 2 COST 2 STATE COST LET DATE COUNTY LIMITS TO APPN 3 COST 3 LOCAL COST RVN DATE OTHER TYPE OF WORK APPN 4 COST 4 LOCAL CONT PHASE COMMENTS TOTAL COST 0502 -01 -178 SH225 STP•SA S143.200.00 5128.880.00 HOUSTON SIMS BAYOU 50.00 514320.00 00/05 HARPIS CHANNEL CITY ROAD 50.00 50.00 C.ER OTHER IMPROVE GUARD RAIL TO DESIGN STANDARDS S0.00 50.00 1998 -2000 TIP AMENDMENT # 165 4A STP- SAFETY S 143 .200.00 1986 -01 -035 FM 1314 STP -SA 595.000.00 585.500.00 HOUSTON AT PARTNERS WAY 50.00 59.500.00 00/01 MONTGOMER AT PARTNERS WAY 50.00 50.00 C.ER OTHER ADD LEFT TURN LANE AND LEFT TURN SIGNAL PHASE 50.00 50.00 1998 -2000 TIP AMENDMENT # 164 4A STP - SAFETY 595,000.00 1986 -01 -036 FM 1314 STP -SA 595,000.00 585,500.00 HOUSTON AT SORTERS ROAD 50.00 59,500.00 00/01 M^NTGOMER 50.00 50.00 C.ER ADD LEFT TURN LANE AND LEFT TURN SIGNAL PHASE 50.00 50.00 1998 -2000 TIP AMENDMENT 9 166 4A STP - SAFETY 595,000.00 0912 -31 -086 VA STP -EN 5798.400.00 5798.400.00 HOU.BO.332 HOUSTON NORTH ALVIN CITY LIMITS 50.00 50.00 99/12 BRAZORIA SOUTH ALVIN CITY LIMITS 50.00 50.00 C.E OTHER ALVIN MUSTANG TRAIL SYSTEM OF 13RAZOP IA COUNTY 50.00 5200.000.00 CARRYOVER 48 STP -ENHAN 5998.400.00 0912 -71429 VA STP -EN 5915.600.00 5915.600.00 HO.HR0134 HOUSTON END OF ARIZONA STREET 50.00 50.00 99/10 HARRIS DECKER DRIVE 50.00 50.00 C.ER OTHER CONSTRUCT HIKE AND BIKE TRAIL 50.00 5240.900.00 CARRYOVER SPLIT OUT CS] 0912 -71 -507 4B STP -ENHAN S 1.156.500.00 0912 -71 -432 VA STP -EN 52.312.063.00 52.312.063.00 HO.HR.0188 HOUSTON '00' NORTH OF BISSONNEC 50.00 So.00 99107 HARRIS 1500' WEST OF IH 610 , EST LOOP) 50.00 50.00 C.ER OTHER CONSTRUCT BIKE TRAIL 50.00 52.950.772.00 CARRY OVER:SPLIT OUT 912- 71.903 &938;98 -2000 TIP 4B STP -ENHAN 53.262.835.00 AMEND965.126 Thursday. Mav 27. 1999 Pa ^_c 4 of 37 0 Houston - Galveston Area Council May 21, 1999 EXHIBIT B CSJ 0912-71-507 From SH 146 to the end of Arizona Street in Baytown CSJ 0912-71-429 CSJ 0912-71-915 VA: Baytown Goose Creek Hike and Bike Trail From the end of Arizona Street to Decker Drive in Baytown THE STATE OF TEXAS § THE COUNTY OF TRAVIS § AMENDMENT ONE TO THE AGREEMENT SURFACE TRANSPORTATION PROGRAM CATEGORY 4B TRANSPORTATION ENHANCEMENTS AND CATEGORY 5 CONGESTION MITIGATION AND AIR QUALITY) THIS AMENDMENT, is made by and between the State of Texas, acting by and through the Texas Department of Transportation, hereinafter called the "State" and the City of Baytown, Texas, hereinafter called the "City". WHEREAS, the State and the City executed an agreement on the 15th day of February 1995 concerning the construction of an multipurpose bicycle/pedestrian facility with landscaping and historic preservation from SH 146 to Decker Drive along Goose Creek in Baytown; and WHEREAS, the portion of the project from SH 146 to the end of Arizona Street (Phase I) has been let to contract by the State and construction has been completed; and WHEREAS, the cost of the Phase 2 project from the end of Arizona Street to Decker Drive has increased significantly from the original nomination and there are no additional Enhancement Program funds available for the project; and WHEREAS, Title 23 U.S.C. Section 149 establishes the Congestion Mitigation and Air Quality Improvement Program ("CMAQ") to contribute to attainment of the national ambient air quality standard to be implemented by the State's Transportation Agencies; and WHEREAS, Houston is classified as a severe ozone non-attainment area, and the State must use funds in ozone and carbon monoxide non-attainment areas; and 1/27/2000 1 WHEREAS, Title 23 U.S.C. Section 120 establishes that the federal share of funding for Congestion Mitigation and Air Quality Programs will not exceed eighty percent (80%) of the Project cost; and WHEREAS, the Project has been approved by the Federal Highway Administration and the Texas Transportation Commission for additional funding under the Congestion Mitigation and Air Quality Program as indicated in the 2000-2002 Transportation Improvement Program, a page of which is attached hereto and identified as "Exhibit A"; and WHEREAS, the original enhancement project is also shown in the 2000-2002 Transportation Improvement Program a page of which is attached hereto and identified as "Exhibit B"; and WHEREAS, these changes necessitate the amendment of the agreement; and NOW THEREFORE, it is agreed to amend certain segments of the Baytown Goose Creek Bikeway project funding agreement as follows: SECTION 5 PARAGRAPH A AND B These sections shall be voided in their entirety and replaced with the following: 5. FUNDING RESPONSIBILITIES A. The estimated total cost of all phases of the Project, including construction engineering and testing services, is $2,210,750. Congestion Mitigation and Air Quality funding will total $806,250 and Enhancement funding will total $1,404,500. B. The State will be responsible to secure the federal share of funding required for the development and construction of all phases of the Project. The federal share for the development and construction of all phases of the Project is eighty percent (80%) of the total estimated cost of all phases of the Project, not to exceed $1,768,600. The Federal portion of the Congestion Mitigation and Air Quality funding will total $645,000 and Enhancement funding will total $1,123,600. The City will be responsible to comply with the cost principles established in OMB Circular A-87, "Cost Principles for State and Local Governments" and for any non-federal participation costs associated with all phases of the Proj ect. 1/27/2000 2 SECTION 14 This section shall be voided in its entirety and replaced with the following: 14. INSPECTION OF CITY'S BOOKS AND RECORDS The parties will, for purpose of termination of the agreement prior to completion, examine the books and records of the other party for the purpose of checking the amount of the work performed at the time of contract termination. The parties shall maintain all books, documents, papers, accounting records and other documentation relating to costs incurred under this agreement and other documentation relating to costs incurred under this agreement and shall make such materials available to the City, State, Federal Highway Administration (FHWA) or their duly authorized representatives for four (4) years from the date of final payment under this contract or until impending litigation is resolved. Additionally, the City, State, FHWA, and their duly authorized representatives shall have access to all records of the parties which are directly applicable to this agreement for the purpose of making audits, examinations, excerpts, and transcriptions. SECTION 15 This section shall be voided in its entirety and replaced with the following: 15. OMB A-133 AUDIT REQUIREMENTS The City shall comply with the requirements of the Single Audit Act of 1984, P.L. 98- 502, ensuring that the single audit report includes the coverage stipulated in OMB Circular No. A-133. All other terms and conditions of the contract are unchanged and remain in full force and effect. 1/27/2000 3 IN TESTIMONY HEREOF, the parties hereto have caused these presents to be executed in duplicate counterparts. THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission under the Authority of Minute Order No. 100002 -a;-R-d- Ad-m-i-inistr-at-ive Q -Gula. 26 93 and supersed4d-b3-Stand Alone Manual Notice 9$3,P1'br the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved by the Texas Transportation Commission. By: JeAnifer D. Soldano Director Contract Services Office 5/ /C/" Date of Execution CITY OF BAYTOWN By: Monte Mercer Typed Name City Manager Title CA,ic (S . Zoo Date ATTEST: C.y Clerk 1/27/2000 4 2-40' 2000-2002 TRANSPORTATION IMPROVEMENT PROGRAM TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT HOUSTON-GALVESTON MPO 2001 CSJ HWY APPN 1 COST I FED COST PROJ ID DISTRICT LIMITS FROM APPN 2 COST 2 STATE COST LET DATE COUNTY LIMITS TO APPN 3 COST 3 LOCAL COST RVN DATE OTHER TYPE OF WORK APPN 4 COST 4 LOCAL CONT PHASE COMMENTS TOTAL COST 0912-71-915 VA CMAQ $806.250.00 645,000.00 HO.HR.01540 HOUSTON GOOSE CREEK TRAIL FROM S OF W TEXAS AVE 0.00 SO.00 01/08 HAGS W TEXAS AVE(PHASE 2) SO.00 S161.250.00 C.E.R OTHER CONSTRUCT HIKE/BIKE TRAIL SO.00 SO.00 SUPPLEMENTAL FUNDING TO ENHANCEMENT PROJECT 5 CMAQ S806,250.00 0912-71-916 VA CMAQ S500,000.00 S400.000.00 990138-XX HOUSTON VARIOUS SO.00 S100,000.00 01108 HARRIS SO.00 SO.00 C,EA OTHER fN ERMODAL CONGESTION QUICK RESPONSE TEAM SO.00 SO.00 5 CMAQ S500,000.00 0912-71-917 VA CMAQ S3,903.000.00 S3,122,400.00 960432-XX HOUSTON BARBOURS CUT QUEUE LANES C^00 SO.00 01/08 HARRIS S780,600.00 C.E.R OTHER CONSTRUCT QUEUE LNS ON ALTWATER DILTRAFFIC CROSSOVERS 00 50.00 5 CMAQ S3,903,000.00 0912-71-920 VA CMAQ $2,850,000.00 S2,280,000.00 T99064-XX HOUSTON VARIOUS SO.00 SO.00 01/OS HARMS SO.00 S570,000.00 C.E,R OTHER FY 2001:TROLLEY/ACTIVITY CENTER SHUTTLES 0.00 SO.00 5 CMAQ S2,850,000.00 0912-71-922 VA -CMAQ S2,800,000.00 2.240.000.00 960760-XX HOUSTON VARIOUS SO.00 S0.00 01/08 HAGS SO.00 S560.000.00 C.E.R OTHER FY 200I.INSTALL CHILLED WATER COOLING SYS @ 6 SO.00 SO.00 BUS OP FAC 5 CMAQ S2,800.000.00 0912-71-924 VA CMAQ S3.590.804 00 S2.872.643.00 T96m2A-XX HOUSTON VARIOUS SO.00 S0.00 01/08 HARRIS SO.00 S718.160.00 C.E.R OTHER FY 2001TUNDING FOR OPERATING ASSIST.OF I I NEW SO.00 SO.00 SERVICE ROUTE 5 CMAQ S3.590.804.00 i Thursday.May 27. 1999 Page 37 of 57 Houston-Galveston Area Council May 21,1999 EXHIBIT A 1 CHAPTER 2 2-7 TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT HOUSTON-GALVESTON MPO 2000 CSJ HWY APPN 1 COST I FED COST PROJ ID DISTRICT LIMITS FROM APPN 2 COST 2 STATE COST LET DATE COUNTY LIMITS TO APPN 3 COST 3 LOCAL COST RVN DATE OTHER TYPE OF WORK APPN 4 COST 4 LOCAL CONT PHASE COMMENTS TOTAL COST 0502-01-178 SH225 STP-SA S143.200.00 S128.880.00 HOUSTON SIMS BAYOU S0.00 S14.320.00 00105 HARRIS CHANNEL CITY ROAD S0.00 S0.00 C.ER OTHER IMPROVE GUARD RAIL TO DESIGN STANDARDS S0.00 S0.00 1998-2000 TIP AMENDMENT 1$165 4A STP-SAFETY S 143,200.00 1986-01-035 FM 1314 STP-SA S95.000.00 S85.500.00 HOUSTON AT PARTNERS WAY 0.00 S9,500.00 00/01 MONTGOMER AT PARTNERS WAY S0.00 S0.00 C.ER OTHER ADD LEFT TURN LANE AND LEFT TURN SIGNAL PHASE S0.00 S0.00 1998-2000 TIP AMENDMENT# 164 4A STP-SAFETY S95,000.00 1986-01-036 FM 1314 STP-SA S95,000.00 S85,500.00 HOUSTON AT SORTERS ROAD S0.00 S9.500.00 00/01 MnWGOMER - S0.00 S0.00 C,ER R ADD LEFT TURN LANE AND LEFT TURN SIGNAL PHASE 50.00 50.00 1998-2000 TIP AMENDMENT 9 166 4A STP-SAFETY S95,000.00 0912-31-086 VA STP-EN S798.400.00 S798,400.00 HOU.80.332 HOUSTON NORTH ALVIN CITY LIMITS S0.00 S0.00 99112 BRAZORIA SOUTH ALVIN CITY LIMITS S0.00 S0.00 C.E OTHER ALVIN MUSTANG TRAIL SYSTEM OF BRAZORIA COUNTY S0.00 S200.000.00 CARRYOVER 4B STNENHAN S998.400.00 0912-71429 VA STP-EN S915.600.00 S915.600.00 HO.HR.0154 HOUSTON END OF ARIZONA STREET S0.00 S0.00 99/10 HARRIS DECKER DRIVE S0.00 S0.00 C.ER OTHER CONSTRUCT HIKE AND BIKE TRAIL S0.00 S240.900.00 CARRYOVER SPLIT OUT CS10912-71-507 4B STNENHAN S1.156.500.00 0912-71432 VA STP-EN S2.312.063.00 S2,312.063.00 HO.HR.0188 HOUSTON 500'NORTH OF BISSONNET S0.00 S0.00 99/07 HARRIS 1500'WEST OF IH 610, EST LOOP) S0.00 50.00 C.ER OTHER CONSTRUCT BIKE TRAIL S0.00 S2.950.772.00 CARRY OVER:SPLIT OUT 912-71-903&938X-2000 TIP 4B STNENHAN S5.262.835.00 AMENDS65.126 Thursday.May 27. 1999 Paec 4 of 57 Houston-Galveston Area Council May 21, 1999 EXHIBIT B