Loading...
Ordinance No. 8,84320000224 -4 ORDINANCE NO. 8843 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 5 WITH ANGEL BROTHERS ENTERPRISES, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE 1998 MUNICIPAL STREET REHABILITATION PROGRAM - PHASE II; AUTHORIZING FINAL PAYMENT OF THE SUM OF SIXTY -FOUR THOUSAND FIVE HUNDRED FORTY -FIVE AND 54/100 DOLLARS ($64,545.54) TO ANGEL BROTHERS ENTERPRISES, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Angel Brothers Enterprises, Inc., for the 1998 Municipal Street Rehabilitation Program - Phase II (the "Project "); and WHEREAS, a change order in the amount of SEVEN THOUSAND TWO HUNDRED SIXTY -ONE AND 29/100 DOLLARS ($7,261.29) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to Angel Brothers Enterprises, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's; Engineer and as approved and adopted by the. City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the 1998 Municipal Street Rehabilitation Program - Phase II and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Angel Brothers Enterprises, Inc., the sum of SIXTY -FOUR THOUSAND FIVE HUNDRED FORTY -FIVE AND 54/100 DOLLARS ($64,545.54); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 5 with Angel Brothers Enterprises, Inc., to adjust the final unit bid quantities for the 1998 Municipal Street Rehabilitation Program - Phase H. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as v 20000224 -4a provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Angel Brothers Enterprises, Inc., in the amount of SIXTY -FOUR THOUSAND FIVE HUNDRED FORTY -FIVE AND 54/100 ($64,545.54) is hereby authorized. DOLLARS Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24th day of February, 2000. ATTEST: GAR W. SMITH, City Clerk APPROVED AS TO FORM: .� �• - — dZI&_ (� ,!4 PETE C. ALFARO,Tkvlayor c:\MyDocuments\ Council\ 99- 00\February\FinalPay &COFive' 98MunStRehabPhaseII. doc 0 2 Angel Brothers Enterprises, Inc. ® 5210 West Road P.O. Box 570 Baytown, Texas 77522 -0570 281.421.5721 281.471.6730 Fax 281.421.2344 www.angelbmthers.com PROJECT: 1998 MUNICIPAL STREET REHABILITATION PROGRAM -PHASE II OWNER: CITY OFBAYTOWN ENGINEER: BUSCH. HUTCHISON & ASSOC., INC. 1209 DECKER DR., SUITE 100 - BAYTOWN, TEXAS 77520 ATTN: MR. JERRY GAINER, P.E. APPLICATION FOR PAYMENT NO.: SIX & FINAL AngelBnothers fbwngand Wo,Connrutms CONTRACT AMOUNT: $913,312.00 CON TRACTOR: ANGEL BROTHERS ENTERPRISES, INC. P.O. BOX 570 BAYTOWN. TEXAS 77522 -0570 INVOICE DATE 1 -28-00 PERIOD: 12 -1 -99 THRU 12-31 -99 EXHIBIT A. PREVIOUS wow 20725.00 3025.00 1568.89 270.96 14521.11 1922.00 36017.99 9.00 338920 212220 110.00 42.00 534.34 3128.66 14.00 2200.00 1.00 762.99 1.00 13890.45 4627.00 584.79 10601.53 1.00 32.00 1.00 9125.02 5091.01 218.50 TOTAL WORK TO DATE DESCRIPTION QUANTITY UNIT PRICE WORK THIS PERIOD 1 REMOVE ASPHALT SURFACE BY MILLING 25020 SY $1.75 20,322.00 2 REMOVE OLD BASE MATERIAL 3025 SY 11.00 36,017.99 3 8' BLACK BASE 810 TN 60.00 11.86220 4 LIME SLURRY (38#/" 483 TN 75.00 42.00 5 6" LIME STABII OF SUBGRADE 25380 SY 1.50 6,381.32 6 MC-30 PRIME COAT 3661 GAL 1.50 1.00 7 2" TYPE "D' HMAC SURFACE 34465 SY 4.10 12,500.00 8 ADJUST MANHOLE, VALVE BOXES, ETC. 13 EA 200.00 9 REMOVE OLD CONCRETE CURB & GUTTER 2305 LF 3.50 10 NEW CONCRETE CURB & GUTTER 1837 LF 18.00 11 REMOVE CONCRETE VALLEY GUTTER 42 LF 10.00 12 6 WIDE VALLEY CUTER, INCL SAWCUTTING 42 LF 40.00 13 4'& 12' THERMOPLASTIC STRIPING 1465 SF 2.00 661.33 14 4-.8-,18- & 24' THERMOPLASTIC STRIPING 2090 SF 2.00 62.00 15 WHITE THERMOPLASTIC FOR SYMBOLS 20 EA 160.00 16 TACK COAT @. 15 GALISY 3745 GAL 0.10 17 REMOVE & RE- INSTALL MAILBOXES, ETC. 1 LS 2500.00 18 CRUSHED STONE FOR MISC. USE 300 TN 30.00 19 TRAFFIC CONTROL 1 LS 12500.00 20 CONCRETE GUTTER ON MEMORIAL DR. 200 LF 15.00 21 6" CONCRETE PAVEMENT 13395 SY 21.00 22 6 ", -zb tE6ECURE` 6920 LF .2.00 :619.00 23 5" CONCRETE DRIVEWAY 1075 SY 24.00 24 6" IN -PLACE COLD RECYCLING 10395 SY 4.60 25 5' MOOIFIED CURB INLET 1 EA 1500.00 26 15' RCP 32 LF 50.00 27 CONNECT 15" RCP TO EXISTING MANHOLE 1 EA 400.00 28 REMOVE & DISPOSE EXIST. ROADWAY 8395 SY 3.60 29 REMOVE & DISPOSE CONCRETE PAVEMENT 30 SY 15.00 30 ROADWAY EXCAVATION 5500 CY 7.70 722.00 31 CEMENT STABILIZED SAND FOR MISC. USE 100 TN 50.00 87.79 32 FILL EXISTING DITCH 200 CY 15.00 120.00' EXHIBIT A. PREVIOUS wow 20725.00 3025.00 1568.89 270.96 14521.11 1922.00 36017.99 9.00 338920 212220 110.00 42.00 534.34 3128.66 14.00 2200.00 1.00 762.99 1.00 13890.45 4627.00 584.79 10601.53 1.00 32.00 1.00 9125.02 5091.01 218.50 TOTAL WORK TO DATE TOTAL AMOUNT 20.725.00 536268.75 3,025.00 33275.00 1,568.89 94,133.40 270.96 20,322.00 14,521.11 21,781.67 1,922.00 2,883.00 36,017.99 147,673.76 9.00 1,800.00 3,38920 11.86220 2,12220 38,199.60 110.00 1,100.00 42.00 1,680.00 1,195.67 2,391.34 3,190.66 6,381.32 14.00 2240.00 2,200.00 220.00 1.00 2,500.00 762.99 22,889.70 1.00 12,500.00 0.00 0.00 13,890.451 291.699.45 A. E;: 584.79 14,034.96 10,601.53 48,767,04 1.00 1,500.00 32.00 1,600.00 1.00 400.00 9,125.02 32,850.07 0.00 0.00 5,813.01 44,760.18 306.29 15,314.50 120.00 1,800.00 APPROVED BY CONTRACTOR AN4�S PRISES. INC. BY: DATE l - 3 I - oo APPROVED BY ENGINEER: BUSCH, HUTCHRSON &AC INC dy'" BY: Q DATE _ 2- APPROVED BY OWNER: CITY OF BAYTOWN BY: DATE DESCRIPTION QUANTITY UNIT WORK THIS PREVIOUS TOTAL WORK TOTAL PRICE PERIOD WORK TO DATE AMOUNT 33 REMOVE & DISPOSE EXISTING PIPE 1 LS 1000.00 1.00 1.00 1,000.00 34 SAWCUTAS SHOWN ON DRAWINGS 1669 LF 3.00 1669.00 1,669.00 5,007.00 35 GRATE INLETS 1 EA 750.00 1.00 1.00 750.00 36 CONCRETE PAVEMENT HEADER 895 LF 2.00 577.00 577.00 1,154.00 37 ADJUST CURB INLETS AS NEEDED 6 EA 1300.00 1.00 1.00 1,300.00 38 HMAC FOR MISC. USE 50 TN 60.00 9.51 32.08 41.59 2,495.40 39 CONCRETE V*IEEICHAIR RAMP 9 EA 450.00 6.00 6.00 2,700.00 40 REPAIR TRAFFIC SIGNAL LOOP DETECTORS 1 LS 2000.00 1.00 1.00 2,000.00 41 SEEDING R.O.W. FOR EROSION CONTROL 436 SY 2.50 0.00 0.00 42 RELOCATE CURB INLET SHOWN ON SH. 4 1 EA 2500.00 0.00 0.00 43 MOUNTABLE CURB 12'X 6' 120 LF 6.50 174.00 174.00 1,131.00 0.00 0.00 CHANGE ORDER f1 0.00 0.00 REMOVE & REPLACE INLETS -GARTH RD. 16 EA 2350.00 19.00 - 19.00 - 44,650.00 0.00 0.00 CHANGE ORDER i2 0.00 0.00 44 MOBILIZE FOR CURB & GUTTER- AMELIA ST. 1 LS 500.00 1.00 .1.00 500.00 45 REMOVE EXIST. ROADWAY & BASE 1790 SY 7.50 1790.00 1,790.00 13,425.00 0.00 0.00 CHANGE ORDER X3 0.00 0.00 1 4' CONCRETE SIDEWALK 110 SY 27.00 131.38 131.38 3,54726 2 REM. & DISPOSE EXIST. SIDEWALK 110 SY 10.00 131.38 131.38 1,313.80 3 REM. & DISPOSE EXIST. CONCRETE DRWY. 50 SY 10.00 456.63 456.63 4,566.30 4 REM. EXIST. THERMO. STRIPING 45 SF 1.00 42.00 42.00 42.00 5 WHITE NON -REFL BUTTONS- CARNEGIE 10 EA 8.00 60.00 60.00 480.00 6 'NO PARKING SIGN4CARNEGIE 2 EA 225.00 2.00 2.00 450.00 0.00 0.00 TOTAL WORK COMPLETED $1,009,631.69 LESS 0% RETAINAGE $0.00 SUBTOTAL $1,009,631.69 LESS PREVIOUS PAYMENTS $945,086.15 TOTAL AMOUNT DUE $64,545.54 APPROVED BY CONTRACTOR AN4�S PRISES. INC. BY: DATE l - 3 I - oo APPROVED BY ENGINEER: BUSCH, HUTCHRSON &AC INC dy'" BY: Q DATE _ 2- APPROVED BY OWNER: CITY OF BAYTOWN BY: DATE CHANGE OWNER ORDER ENGINEER ❑ CONTRACTOR ❑ PROJECT: 1998 Municipal Street Rehabilitation Program - Phase H Baytown, Texas TO CONTRACTOR: Angel Brothers Enterprises, I P. O. Box 570 Baytown, Texas 77522 -0570 The Contract is changed as follows: CHANGE ORDER: Five & Final DATE: February 15, 2000 ENGINEER'S PROJECT NO: 99- 3058.2 nc. CONTRACT DATE: July 8, 1999 CONTRACT FOR: 1998 Municipal Street Rehabilitation Program - Phase H Phase II of the 1998 Municipal Street Rehabilitation Project is now complete and.the final quantities of work have been tabulated as shown on the attached spread sheet. The final amount of work shows an increase in the contract amount by $7,261.29. This overrun represents various work item increases but is nominally caused by the items listed below. Not valid until signed by the Owner, Engineer and Contractor. The original (Contract Sum) Maxinjun, Price) was ................... ..............................$ 913,312.00 Net change by previously authorized Change Orders ..................................... ..............................$ 89,058.40 The (Contract Sum) ( ) prior-to this Change Order was .....................$ 1,002,370.40 The (Contract Sum) ( ) -will be (increased) (dccr=scd) (vrttharrcc})by this Change Order in the amount ................................... ..............................$ 7,261.29 The new (Contract Sum) ( ) including this Change Order will be ....... $1,009,631.69 The Contract Time will,be ( incrcased) (dczr�szd) (unchanged). ti Busch, Hutchison & Associates, Inc Angel Brothers Enterprises, Inc. City of Baytown ENGINEER CONTRACTOR OWNER 1209 Decker Drive P. O. Box 57 P. O. Box 424 Address Addres Address Baytown, Texas 77520 Ba town Te s 77522 70 Baytown, Texas 77522 BY ' BY BY A0_1: — -2t c DATE Z- Z/- oo DATE Pa Item Quantity Bid Units Unit Price Contract Amount Quantity Used Total . 14 4',8',12',18', & 24' white thermoplastic reflectorized striping for stop bar, R.R. Xing 2,090.00 SF $2.00 $4,180.00 3190.66 $6,381.32 & mountable curb C.I.P. 28 Remove and dispose of old base & & surface as shown on plans or directed 8,395.00 S $3.60 $30,222.00 9125.02 $32,850.07 by the En ineer. Complete-in-Place 30 Roadway Excavation Complete In Place 1 5,500.00 C $7.70 $42,350.00 5813.01 $44,760.18 Overrun Amount for Approval= $7,261.29 Not valid until signed by the Owner, Engineer and Contractor. The original (Contract Sum) Maxinjun, Price) was ................... ..............................$ 913,312.00 Net change by previously authorized Change Orders ..................................... ..............................$ 89,058.40 The (Contract Sum) ( ) prior-to this Change Order was .....................$ 1,002,370.40 The (Contract Sum) ( ) -will be (increased) (dccr=scd) (vrttharrcc})by this Change Order in the amount ................................... ..............................$ 7,261.29 The new (Contract Sum) ( ) including this Change Order will be ....... $1,009,631.69 The Contract Time will,be ( incrcased) (dczr�szd) (unchanged). ti Busch, Hutchison & Associates, Inc Angel Brothers Enterprises, Inc. City of Baytown ENGINEER CONTRACTOR OWNER 1209 Decker Drive P. O. Box 57 P. O. Box 424 Address Addres Address Baytown, Texas 77520 Ba town Te s 77522 70 Baytown, Texas 77522 BY ' BY BY A0_1: — -2t c DATE Z- Z/- oo DATE