Loading...
Ordinance No. 8,84220000224 -3 ORDINANCE NO. 8842 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 WITH WHITELAK, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE POLICE DEPARTMENT PISTOL RANGE WATER AND SEWER LINE; AUTHORIZING FINAL PAYMENT OF THE SUM OF SIXTY -SEVEN THOUSAND FIVE HUNDRED SIXTY AND 90/100 DOLLARS ($67,560.90) TO WHITELAK, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Whitelak, Inc., for the Police Department Pistol Range Water and Sewer Line (the "Project "); and WHEREAS, a deduct change order in the amount of ONE THOUSAND NINETY -FOUR AND 10 /100 DOLLARS ($1,094.10) toladjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to Whitelak, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full, accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer' in the manner provided by the terms of the said contract and the plans and specifications thereof, has !approved and accepted the Police Department Pistol Range Water and Sewer Line and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended "that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Whitelak, Inc., the sum of SIXTY -SEVEN THOUSAND FIVE HUNDRED SIXTY AND 90/100 DOLLARS ($67,560.90); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 with Whitelak, Inc., to adjust the final unit bid quantities for the Police Department Pistol Range Water and Sewer Line. A copy of said deduct change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. 20000224 -3a ® Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Whitelak, Inc., in the amount of SIXTY -SEVEN THOUSAND FIVE HUNDRED SIXTY AND 90/100 DOLLARS ($67,560.90) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24th day of February, 2000. PETE C. ALFARO, ayor ATTEST: IIA GAi"WW. SMITH, City Clerk APPROVED AS TO FORM: JfAACIO RAMIREZ, Skjity Attorney cA MyDocuments \Council\99- 001February \Chord 1 Fin alPayPDpi sto]RangeWater &SewerLine.doc 0 2 C CITY OF BAYTOWN Police Department Pistol Range Water and Sewer Change Order #1 02/09/2000 This change is to add well point dewatering. Subsurface water was incured during installation of the gravity sewer.. ' NIBIT A pagel Col Description Unit Award Amount Actual Amount Quantity Difference Price CO #1 Amount Item 4" Sanitary Sewer, PVC, SDR 185 208 23 S 15.00 S 345.0 1 35, open cut, all depths, CIP L.F. 6" Sanitary Sewer, PVC, SDR 1 S 15.00 S 15.0 2 35, open cut, all depths, CIP L.F. 160 161 3 8" Sanitary Sewer, PVC, SOR 26, open cut, all depths, CIP L.F. 1000 966 -34 S 15.00 S (510.00 Manhole, all depths, pre -cast 5 0 S 1,250.00 S 4 concrete, CIP EA. 5 8" PVC waterline, AWWA, C- 900, OR -28, Augered Construction with 14" Steel 60 42 18 $ 100.00 S (1,800.00 5 Casing, all depths, CIP L.F. T7; Waterline, Sch 40, incl. All fittings, plugs,steel pipe 700 620 80 S 5.00 S (400.00 6 select, open cut, CIP L.F. Cement Stabilized Sand TO 71.77 1.77 S 20.00 S 35.4 7 Backfiil TON 8" PVC Water Main, AWWA C- 900, SOR 18, Incl. All fittings, plugs, steel pipe select, open 49 -1 S 100.00 S (100.00 8 cut. CIP LF 50 6" PVC Water Main, AWWA C- 900, SOR 18, Incl. All fittings, plugs, steel pipe select, open 1150 949 -201 $ 13.00 S (2,613.00 9 cut. CIP LF Fire Hydrant, Gate Valve and 5 10 boxes EA. 2 2 0 S 2,000.00 6" PVC Waterline, AWWA C- 900, SDR 18, Incl. Augered 91 -9 S 30.00 S (270.00 11 Construction, all depths, CIP LF 100 8 7x8" Stainless Steel Full circle tapping sleeve w /valve $ 12 and adjustable valve box, CIP EA 1 1 0 S 2,000.00 8" Gate Valve w /adjustable Valve Box, AWWA, 5 13 accessories, blocking, CIP EA 2 2 0 S 500.00 6" Gate Valve w /adjustable Valve Box, AWWA, S 14 accessories, blocking, CIP EA 2 2 0 5 350.00 S 70.0 15 Trench Safety System, CIP LF 30 loo 70 . S 1.00 0 $ Supplementary Items 0 0 -100 $ 6.00 S S (600.00 16a Bank Sand, CIP CY 100 Crushed Limestone 50 0 -50 S 1.00 S (50.00 16b bedding,CIP CY Change Order 1 Additional cost of excavation and backfilling with bank sand for 1" waterline due to 620 620 5 3.50 S 2,170.0 17 unanticipated site conditions LF 0 Additional labor and equipment to install water 2 S 595.00 S 1,190.0 18 meters. EA 0 2 Additional Bulldozer time to 19 cover trash exposed during installation of 8" sewer HR. 0 T.5 7.5 $ 75.00 S 562.5 ' NIBIT A pagel Col CITY OF BAYTOWN Police Department Pistol Range Water and Sewer Change Order #1 02!09/2000 This change is to add well point dewatering. Subsurface water was incured during installation of the gravity sewer.. Total Change order a1 1 1. In consideration for the above change, it is mutually agreed that the contract price is decreased 2. Also, it is mutually understood and agreed that the time of performance for all work is not increased and remains 60 workinig days. 3. Finally, it is understood and agreed that this change order is a full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays, and impacts related thereto and for performance of the changes within the time stated. 4. Contract Summary Contract Award Amount S 68,655.00 Change Order #1 (add) S (1,094.10) Amended Contract Amount $ 67,560.90 Contract Award Performance Duration 60 Change Order #1 (no change) 0 Amended Perform Duration 60 000 Whitelak, Inc Oate Finance Director Date Col Director of Engineering & inspection City Manager Date page2 Additional Dump Truck time to Award Actual Quantity CO #1 20 cover trash exposed during installation of 6" sewer HR. 0 15 15 S 35.00 5 525.0 Additional select fill where 21 trash was removed during installation of 8" sewer CY 0 56 56 $ 6.00 S 336.0 S (1.094.10) Total Change order a1 1 1. In consideration for the above change, it is mutually agreed that the contract price is decreased 2. Also, it is mutually understood and agreed that the time of performance for all work is not increased and remains 60 workinig days. 3. Finally, it is understood and agreed that this change order is a full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays, and impacts related thereto and for performance of the changes within the time stated. 4. Contract Summary Contract Award Amount S 68,655.00 Change Order #1 (add) S (1,094.10) Amended Contract Amount $ 67,560.90 Contract Award Performance Duration 60 Change Order #1 (no change) 0 Amended Perform Duration 60 000 Whitelak, Inc Oate Finance Director Date Col Director of Engineering & inspection City Manager Date page2