Loading...
BAWA Resolution No. 2019-21RESOLUTION NO. 2019-21 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY AUTHORIZING CHANGE ORDER NO. 7 WITH PEPPER LAWSON WATERWORKS, LLC, FOR THE BAWA 6 MGD SURFACE WATER TREATMENT PLANT PROJECT IN THE AMOUNT OF ONE HUNDRED FIFTY-ONE THOUSAND FOUR HUNDRED FORTY-SIX AND 70/100 DOLLARS ($151,446.70); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority does hereby authorize Change Order No. 7 with Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the Board of Directors of the Baytown Area Water Authority hereby authorizes the payment of an amount not to exceed ONE HUNDRED FIFTY-ONE THOUSAND FOUR HUNDRED FORTY-SIX AND 70/100 DOLLARS ($151,446.70) to Pepper Lawson Waterworks, LLC, consistent with the change order authorized in Section 1. Section 3: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 20th day of November, 2019. /IRRZENDA BRADLEY SMITH, President ATT L ICIA BRYS H, tant Secretary gre_R�,,��/ Q2- Gay. APPROVED AS TO FORM: - 0 ; r Y&IM; ACIO RAMIREZ, SR., eral Counsel /',���'�� ► i *�'`��\``\` R:\Karen\Files\B A W A\Resolution\2019\ChangeOrderNo74BA W AEAST.docx Exhibit "A" BAYTOWN AREA WATER AUTHORITY Change Order No. 7 0 MCD SURFACE WATER TREATMENT PLANT PO: Bate: 1800211 16-Oct-19 CO 7.1 is requested for compensation for the efforts that PIN invested during the value engineering. CO T2 is requested for compensation for the extra cost the PLW had incurred due to the subcontractor and vendor escalation. CO 7.3 is requested due to the Operation Building CMU reinforcement design mudificatin by the EOR. CO 7.4 is a credit for the electrical building doors modification in compliance with the windload requirement. CO 7.5 is a credit for the reinforced concrete box modification requested by the EOR. CO 7.6 is requested for electrical building roofing system modification to meet the windload requirement. CO 7.7 is a credit for deleting the stormwater detension pond concrete pilot channel complete requested by the EOR. CO 7.8 is requested for the SCADA hardware modification per RFP #005. Add or Delete Items: jlgpl 7.1 7.2 7.3 _ 7.4 1 7.5 _ 7.6 iEtectriral i 7.7 7.8 _•SCADA Description VE Efforts PCO 005 _(_ _)_ _ Subcontractor and Vendor Escalation (PCO 007) ;CMU and Steel Beata Modification (PCO 019) _ _ _ _r _ — Electrical Buis Door Modification (PCO027) lReinforced Concrete Box Modification (PCO 031) Buildi� Roofing Modification (1'C0034) _; Storrnwater Pond Pilot Channel Deduction (PCO 040) Unrt 1-- 1 1 -1 -1 —� l 1 u t - - tS -LS LS _ —.- _-- LS_ LS nr P •ce - t n _ 30,000.00 243,205.00 j 30.151.95 95 _$ 30,000.00 $ 243,205.00 $ 30,151.95 _ 2,040.00 _ - 118,041.79 $ (2,040.00) $ (118,041-79) LS LS LS 3,553.50 $ 3,553.50 i,966.60 6,584.64 $ {41,966.6(1) $ 6,584.64 Hardware Modification (PC0041) -- - _- 1 $ 151,446.70 Contract 5u p ary:-- -- - - --- - `- — --- -- - - r l Original Contract Price --- On •nal Revised $52,186,000.00 2 Owner Contingency Previous Change Orders This Change Order _ -_ -- --- Rernaining Contingency $0.00 $ (3,615,632.74 _-- --- - j -- ( - — — j 3 Change Orders - — Previous Change Orders i - rhis change order 4 Revised Contract Price $ 151,446.71 ( $52,186,(H)0.00 $48,721,813.9+ Original Contract Duration 1095 Previous Extensions 0 This Change Order 0 Revised Duration - Calendar Days 1095 Contractor PEW Waterworks, LLC -bate t0yEngineering Director Date Chas Smith, Vict IwKe dcnt Consultant: )ones! rter, Inc. nme i City Manager Este (C3&2_17.0-t 9