Loading...
Ordinance No. 8,653990812 -9 ORDINANCE NO. 8653 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 TO WORK ORDER NO.3 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE YEAR 1999- 2000 ANNUAL SEWER REHABILITATION CONTRACT; AUTHORIZING FINAL PAYMENT OF THE SUM OF EIGHTEEN THOUSAND ONE HUNDRED FIFTY -ONE AND 30/100 DOLLARS ($18,151.30) TO P.M. CONSTRUCTION & REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction & Rehabilitation, L.P., for the Year 1999 -2000 Annual Sewer Rehabilitation Contract (the "Project "); and WHEREAS, a deduct change order in the amount of FOUR HUNDRED THREE AND 70/100 DOLLARS ($403.70) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction & Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction & Rehabilitation, L.P., the sum of EIGHTEEN THOUSAND ONE HUNDRED FIFTY -ONE AND 30/100 DOLLARS ($18,151.30); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 to Work Order No. 3 with P.M. Construction & Rehabilitation, L.P., to adjust the final unit bid quantities for the Year 1999 -2000 Annual Sewer Rehabilitation Contract. A copy of said change order is attached hereto, marked Exhibit "A," and made apart hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work ® and improvements, and finds and determines that all of said improvements have been completed as C I�z 990812 -9a ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction & Rehabilitation, L.P., in the amount of EIGHTEEN THOUSAND ONE HUNDRED FIFTY -ONE AND 30/100 DOLLARS ($18,151.30) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12th day of August, 1999. A C. � PETE C. ALFARO, Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: ggr ll � � • ® c:\MyDocuments \Council\ Meetings\ August\ AnnualSewerRehab99- OOChOrdIWkOrdldoc 2 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT 2 -1999 -2000 Change Order #1 on Work Order #3 Emergency repairs on Cedar Bayou Road 8/3/99 This work order included pipe bursting , service reconnections, well pointing, manhole wall rehabilitation and miscellaneous items related to emergency work on Cedar Bayou Road Item Description Unit Orig. Quant. Actual Quant. Diff. Price Cost 5 8" & 10" pipe bursting to 10" SDR 19, 0' to 8' deep LF 64 64 0 $ 50.00 $ - 15 Reconnect Service - Short Side, over 8' deep' EA 1 1 0 $ 700.00 $ - 17 Reconnect Service - Long Side, 0' to 8' deep EA 4 4 $ 1,500.00 $ - 18 Manhole wall sealing VF 25 19 -6 $ 85.00 $ (510.00) 22 Extra cement stabilized sand TON 80 79 -1.06 $ 20.00 $ (21.20) 30 Trench Safety, 8' to 15' deep LF 80 80 0 $ 1.00 $ - 53 Rmv /rpl 6" - 112" pipe, includes modified bedding LF 50 50 $ 75.00 $ - 62 Asph. Pvmt SY 10 14 4.25 $ 30.00 $ 127.50 65 Set up Traffic Control EA 1 1 0 $ 500.00 $ - 67 Hydromulch Seeding SY 100 1001 0 $ 3.00 $ - Total Change Order #1 -99 .M Construction Date Finance Date Co1wo3 Work Order Summary: Final Construction Cost $ 18,151.30 Initial Work Order $ 18,555.00 Change Order #1 $ (403.70) EXHIBIT A $ (403.70) Director of Engineering & Inspections Date City Date manager pagel I'] E F7 Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT -1999 - 2000 Contract 2 Emergency Work on Cedar Bayou Road P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 (final) Work Order #3, Total Time Allowed: 15 Working Days Total Time Used: 5 Days Item Description Unit P.E.1 Quantities Unit Price WO2 Actual 5 Pipe burst 8" & 10" to 10 ", 8' -15' deep LF 64 $ 50.00 $ 3,200.00 15 Reconnect service - short side, over8' deep EA 1 $ 700.00 $ 700.00 17 Reconnect service - long side, over 8' deep EA 4 $ 1,500.00 $ 6,000.00 18 Manhole Wall Sealing VF 19 $ 85.00 $ 1,615.00 22 Extra cement stabilized sand TON 78.94 $ 20.00 $ 1,578.80 30 Trench Safety, 8' to 15' deep LF 80 $ 1.00 $ 80.00 53 Rmv /repl 6" - 12" pipe incl. Modified bedding LF 50 $ 75.00 $ 3,750.00 62 Rmv /repl up to 2" HMAC, Type D, CIP SY 14.25 $ 30.00 $ 427.50 65 Set up traffic control EA 1 $ 500.00 $ 500.00 67 Hydromulch Seeding SY 100 $ 3.00 $ 300.00 Total $ 18,151.30 Less 0% Retainage NOW= Zamon= $ - ' . Less Total Previous Payments on WO 2 $ - Final Payment WO #2 $ 18,151.30 /• Date Finance Date Contract Summary: Current Work Order #1 Amount $ 18,151.30 Less Previous Payments $ Current Amount Due $ 18,151.30 pelwo3final Director of Engineering & Inspections Date City manager Date • �l