Loading...
Ordinance No. 8,631990708 -7 ORDINANCE N0. 8631 ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 2 WITH HORSESHOE CONSTRUCTION, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE GLEN ARBOR/FAIR PARK SANITARY SEWER REHABILITATION PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF ONE HUNDRED THIRTY -TWO THOUSAND SEVEN HUNDRED NINE AND FIFTY -NINE /100 DOLLARS ($132,709.59) TO HORSESHOE CONSTRUCTION, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Horseshoe Construction, Inc., for the Glen Arbor/Fair Park Sanitary Sewer Rehabilitation project (the "Project "); and WHEREAS, a deduct change order in the amount of FIFTY -EIGHT THOUSAND THREE HUNDRED FOUR AND EIGHTY /100 DOLLARS ($58,304.80) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to Horseshoe Construction, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Glen Arbor /Fair Park Sanitary Sewer Rehabilitation project and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Horseshoe Construction, Inc., the sum of ONE HUNDRED THIRTY -TWO THOUSAND SEVEN HUNDRED NINE AND FIFTY - NINE /100 DOLLARS ($132,709.59); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 2 with Horseshoe Construction, Inc., to adjust the final unit bid quantities for the Glen Arbor/Fair Park Sanitary Sewer Rehabilitation project. A copy of said deduct change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work 40 and improvements, and finds and determines that all of said improvements have been completed as E 990708 -7a ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 3: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to Horseshoe Construction, Inc., in the amount of ONE HUNDRED THIRTY -TWO THOUSAND SEVEN HUNDRED NINE AND FIFTY -NINE /100 DOLLARS ($132,709.59) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 8th day of July, 1999. PETE C. ALFARO, ayor ATTEST: EILEEN. P..HALL, City Clerk APPROVED AS TO FORM: ACID RAMIREZ, S ity Attorney c: \MyDocuments \Co unci ] \MeetingsV uly\ HoreshoeConstructionDeductChangeOrderF i nalPayOut8. doc 0 2 v WA- SMITH & ASSOCIATES June 22, 1999 BALANCING CHANGE ORDER The Honorable Mayor and City Council City of Baytown P.O. Box 424 Baytown, Texas 77522 SUBJECT: Request for Change in Contract CONTRACTOR: Horseshoe Construction, Inc. CONTRACT DATED: May 5, 1998 ORIGINAL CONTRACT AMOUNT: $ 1,619,920.00 WSA PROJECT NO.: 024 - 0280 -4 PROJECT: Glen Harbor /Fair Park Sanitary Sewer Rehab The Honorable Mayor and City Council, In accordance with Article 3 of the General Conditions of the Agreement the Contractor has requested a change in the Contract Amount for the following reason: During the course of construction it has become necessary to remove 6 sags totaling 390 linear feet, build 25 inverts in existing manholes that had no inverts, and use sod in lieu of hydro - mulch. Three obstruction removals were paid for as point repairs. The cost of above described items are as follows: Balancing Change Order Item No. Description Est. Quant. Units Unit Price Total Cost 50 8" PVC Gravity Sewer Open Cut 390 LF 1$60.00 $23,400.00 51 8" PVC Replacement by Pipe Bursting -390 LF $34.00 ($13,260.00) 52 Obstruction Removal 3, EA $500.00 $1,500.00 53 Point Repair (0 -5') -1 EA $100.00 ($100.00) 54 Point Repair (5 -10') -2 EA $100.00 ($200.00) 55 Build Inverts in Existing Manholes 25 EA $75.00 $1,875.00 56 Sod in Lieu of Hydro -Mulch 13130 S.Y. $3.50 $45,955.00 Sub -Total Item Nos. 50,51,52,53,54, and 55 $59,170.00 11821 1 -10 East Freeway, Suite 400 - Houstun. Texas 77029 • Ph: (713) 450 -1300 • Fax: (713) 450 -1385 EXHIBIT A C7 ® The Honorable Mayor and City Council City of Baytown Balancing Change Order WSA Project No. 024 - 0280 -4 June 22, 1999 Page 2 We have reviewed this cost and recommend approval of the change in Contract Amount, an addition of $59,170.00 for above described Items. Because the quantities comprising the original contract reflect estimated amounts, a Balancing Change Order must be prepared at job completion amending the contract to agree with the actual value of the installed facilities. The accompanying tabulation lists the Bid Items which varied from original estimated amounts. It list the overrun and underrun quantities and cost of each item and then shows the net overrun/underrun. This change order amends the contract by the net underrun amount of ($58,304.80). Balancing Change Order ITEM NO. ORIGINAL QUANTITY ACTUAL QUANTITY DIFFERENCE + OR - UNIT PRICE ADD OR (DEDUCT) 1 7460 4396 -3064 $1.00 ($3,064.00) 2 13745 14673 928 $1.00 $928.00 3 450 392 -58 $2.00 ($116.00) 4 1575 1370 -205 $2.00 ($410.00) 5 1210 1200 -10 $2.00 ($20.00) 6 7460 4396 -3064 $1.00 ($3,064.00) 7 13745 14413 668 $1.00 $668.00 8 1450 0 -450 $1.00 ($450.00) 9 1 1575 1762 187 $1.00 $187.00 10 11210 1200 -10 $1.00 ($10.00) 11 10 5 -5 $300.00 ($1,500.00) 12 5 1 0 -5 1$200.00 ($1,000.00) r U C7 ® The Honorable Mayor and City Council City of Baytown Balancing Change Order WSA Project No. 024 - 0280 -4 June 22, 1999 Page 3 ITEM NO. ORIGINAL QUANTITY ACTUAL QUANTITY DIFFERENCE + OR - UNIT PRICE ADD OR (DEDUCT) 14 40 2 -38 $100.00 ($3,800.00) 15 300 307 7 $60.00 $420.00 16 6585 3816 -2769 $34.00 ($94,146.00)- 17 9325 10666 1341 $34.00 $45,594.00 18 450 392 -58 $45.00 ($2,610.00) 19 1275 1370 95 $55.00 $5,225.00 20 875 623 -252 $40.00 ($10,080.00) 21 4420 4027 -393 $37.00 ($14,541.00) 22 1210 1213.5 3.5 $100.00 $350.00 23 10 1 -9 $100.00 ($900.00) 24 10 2 -8 $100.00 ($800.00) 25 10 0 -10 $100.00 ($1,000.00) 26 10 0 -10 $100.00 ($1,000.00) 27 10 0 -10 $100.00 ($1,000.00) 28 10 0 -10 $100.00 ($1,000.00) 30 387 403 16 $400.00 $6,400.00 32 29 28 -1 $425.00 ($425.00) 33 19 22 3 $1,700.00 $5,100.00 34 30 3 -27 $200.00 ($5,400.00) 36 600 540.96 -59.04 $70.00 ($4,132.80) 37 100 10 -90 $80.00 1 ($7,200.00) C C The Honorable Mayor and City Council City of Baytown Balancing Change Order WSA Project No. 024 - 0280 -4 June 22, 1999 Page 4 ITEM NO. ORIGINAL QUANTITY ACTUAL QUANTITY DIFFERENCE + OR - UNIT PRICE ADD OR (DEDUCT) 39 4 1.40 - 2.60 $1,200.00 ($3,120.00) 40 50 0 -50 $40.00 ($2,000.00) 41 50 0 -50 $40.00 ($2,000.00) 42 a 50 0 -50 $10.00 ($500.00) 42 b 50 0 -50 $25.00 ($1,250.00) 42 c 5 0 -5 $20.00 ($100.00) 42 d 5 0 -5 $80.00 ($400.00) 42 e 800 0 -800 $0.50 ($400.00) 43 a 615 506 -109 $1.00 ($109.00) 43 b 1625 1660 35 $1.00 $35.00 43 c 615 506 -109 $1.00 ($109.00) 43 d 1675 1660 -15 $1.00 ($15.00) 43 e 615 519 -96 $35.00 ($3,360.00) 43 f 1675 1660 -15 $35.00 ($525.00) 43 g 2 3 1 $2,000.00 $2,000.00 44 a 1575 986 -589 $1.00 ($589.00) 44 c 1575 1368 -207 $1.00 ($207.00) 44 e 1575 1370 -205 $35.00 ($7,175.00) 44 f 400 0 -400 $35.00 ($14,000.00) 44 h 31 29 -2 $425.00 ($850.00) 45 a 75 1 382 307 $1.00 $307.00 n Ll n The Honorable Mayor and City Council City of Baytown Balancing Change Order WSA Project No. 024 - 0280 -4 June 22, 1999 Page 5 ITEM NO. ORIGINAL QUANTITY ACTUAL QUANTITY DIFFERENCE + OR - UNIT PRICE ADD OR (DEDUCT) 45 b 1550 1530 -20 $1.00 ($20.00) 45 c 300 302 2 $1.00 $2.00 45 d 75 0 -75 $1.00 ($75.00) 45 e 1550 1530 -20 $1.00 ($20.00) 45 f 300 302 2 $1.00 $2.00 45 g 75 905 830 $35.00 $29,050.00 45 h 1550 1025 -525 $35.00 ($18,375.00) 45 i 300 302 2 $80.00 $160.00 45 j 1 0 -1 $1,900.00 ($1,900.00) 45 k 36 35 -1 $425.00 ($425.00) 46 12 13 1 $300.00 $300.00 48 160 1 78 1 18 1 $55.00 $990.00 Sub -Total Balancing Change Order ($117,474.80) Total Balancing Change Order ($58,304.80) TOTAL OVERRUNS ............................... $156,888.00 TOTAL UNDERRUNS ............................ ($215,192.80) TOTAL BALANCING CHANGE ORDER ............. ($58,304.80) We have reviewed this cost and recommend approval of the change in Contract Amount, a deduction of ($58,304.80), as summarized below. SUMMARY: Original Contract Amount ............................. $ 1,619,920.00 Change Order No. 1, Add ............................... $ 8,626.63 ® Balancing Change Order Deduct .......................... ($58,304.80) Amended Contract Amount ............................ $ 1,570,241.83 E The Honorable Mayor and City Council City of Baytown Balancing Change Order WSA Project No. 024 - 0280 -4 June 22, 1999 Page 6 RECOMMENDED FOR APPROVAL: Wayne Smith & Associates, Inc. By: W4�4� Date: or— Z-f —fP APPROVED: City of Baytown Date: AGREED: Horseshoe Construction, Inc. By: Date: C