Loading...
Ordinance No. 8,533990311 -4 ORDINANCE NO. 8533 . ® AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 TO WORK ORDER NO. 7 WITH P.M. CONSTRUCTION & REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE 1998 -99 ANNUAL SANITARY SEWER REHABILITATION CONTRACT; AUTHORIZING FINAL PAYMENT OF THE SUM OF NINETY -ONE THOUSAND ONE HUNDRED THIRTY -THREE AND 10 /00 DOLLARS ($91,133.10) TO P.M. CONSTRUCTION & REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction & Rehabilitation, L.P., for the 1998 -99 Annual Sanitary Sewer Rehabilitation Contract (the "Project "); and WHEREAS, a change order in the amount of THIRTY -SEVEN THOUSAND TWO HUNDRED EIGHTY -SIX AND 20 /100 DOLLARS ($37,286.20) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction & Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction & Rehabilitation, L.P., the sum of NINETY -ONE THOUSAND ONE HUNDRED THIRTY -THREE AND 10 /100 DOLLARS ($91,133.10); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 to Work Order No. 7 with P.M. Construction & Rehabilitation, L.P., to adjust the final unit bid quantities for the 1998 -99 Annual Sanitary Sewer Rehabilitation Contract. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. 990311 -4a ® Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction & Rehabilitation, L.P., in the amount of NINETY -ONE THOUSAND ONE HUNDRED THIRTY -THREE AND 10 /100 DOLLARS ($91,133.10) is hereby authorized. Section S: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1 I" day of March, 1999. /,Gtr G , �?_ g� PETE C. ALFA , Mayor WL ty Clerk AS TO FORM: F@j .Fffolft 67's, mWiffl, f cAMyDocuments \Councii\ Meetings \M arch \EngDedChOrderFina[ PaySewerRehab.doc ® 2 0 CI'T'Y OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE ORDER NOA TO WORK ORDER NO. 7 (revised 1119199) East Baker Road, Goose Creek Country Club and Kilgore Road 313199 This Change Order includes pipe bursting, reconnecting services, manhole sealing, point repairs, removelreplace pipe open cut and miscellaneous items in accordance with the plans for work on East Baker Road, Goose Creek Country Club 21" Sewer and Kilgore Road Sewer, Cost Difference P.M. Construction Date Finance Date Work Order Summary: ® Initial work order No.7 S 128,419.30 Change Order No.7 To Work Order No. 7 S (37,286.20) Final Work Order No. 7 Amount. S 91,133.10 City Engineer Date City Manager Date EXHIBIT A changeorder7annualss Orig. Final Unit Item Description Unit Quant. I Quant. I Diff. I Price Cost Difference P.M. Construction Date Finance Date Work Order Summary: ® Initial work order No.7 S 128,419.30 Change Order No.7 To Work Order No. 7 S (37,286.20) Final Work Order No. 7 Amount. S 91,133.10 City Engineer Date City Manager Date EXHIBIT A changeorder7annualss CITY OF BAYTOWN Project: ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 East Baker Point Repair, Goose Creek Country Club Point Repair �\ Kilgore Road S.S. Rehabilitation P.M. Construction and Rehabilitation, L.P. 7704 East Erath Houston, Texas 77012 Pay Estimate No. 1 & Final Work Order #7 Time: 25 Work Days Total Time Used: 24Days Item Description Unit Est. W07 Quant. P.E.1 Quantities Total W07 Quantities Unit Price .,.Actual W07 e. :,Total Cost . 4 Pipe burst 10 ", 0' -8' deep LF 960 0 0 $ 45.00 12 Pipe burst 12" & 15 ",8' to 15' deep LF 450 450 450 $ 100.00 $ 45,000.00 14 Reconnect service - short side, 0' -8' deep EA 7 1 1 $ 500.00 $' ' •.500.00 18 Manhole Wall Sealing VF 63 48.08 48.08 $ 85.00 $ = ,'4,086.80 19 Repl /install new manhole, 0' -8' deep EA 1 1 1 $ 1,500.00 $ - 1.500.00 22 Extra cement stabilized sand TON 238.63 215.93 215.93 $ 20.00 $ 4,318.60 23 Point Rpr /obst rmv - pipe bursting, 0'-8'deell EA 2 2 2 $ 300.00 $ • .. 600.00 27 Well Point, all depths, up to 12 LF EA 1 1 1 $ 2,800.00 $...:,2,800.00 28 Well Point, Extra Length over 12 LF LF 430 430 430 $ 20.00 $),- 8,600.00 29 Trench Safety, up to 8' deep LF 60 30 30 $ 1.00 $. ?rr30.00 30 Trench Safety. 8' to 15' deep LF 30 30 30 $ 1.00 $ x 30.00 31 Trench Safety over 15' deep LF 60 60 60 $ 1.00 $ x:.60.00 32 Clean 6 " -12" sewer LF 320 655 655 $ 3.00 $ "- •1,965.00 35 TV inspection w /tapes & report LF 0 655 655 $ 1.00 $ ..: 655.00 36 Bypass Pumping, 3" Pump Day 2 2 2 $ 1.00 $ ; 2.00 38 Bypass Pumping, 6" Pump Day 3 3 3 $ 500.00 $ ..1,500.00 47 Point repair 21 " -36 ", 8 %15' deep, up to 12 LF EA 1 1 1 $ 7,500.00 $ 7,500.00 50 Extra length point repair, all sizes, 8'-15' deep LF 2 2 2 $ 150.00 $ 300.00 60 Rmv/ rep[ up to 5" sidewalk/Drive (incl. Saw cutting, reinf.) SY 36.66 36.66 36.66 $ 45.00 '$-' ' 1,649.70 62 Rmv /repl up tot" HMAC, Type D SY 15 0 0 $ 30.00 $ - 65 Set up traffic control EA 2 2 2 $ 500.00 $ 1,000.00 67 Hydromulch Seeding SY 180 360 360 $ 3.00 $ . 1,080.00 68 7" Slipliner LF 0 306 306 $ 26.00 $•:7,956.00 Total $ $ _... .. - Sub -Total Work Performed to Date $ 91,133.10 Less Retainage of Pay Est. Not, W07 Vi i%69wig 'i1155 ate . 'b,� 1,'x'4 ` $ - Less Total Previous Payments = 1 ' "FOR Me'7 $ - Total Due This Estimate MI-Ma 711M7,xr . X94ZV3 _;_=W1 $ 91,133.10 . - V, Uy' / 3- 1� P. . Construction Date Finance Date City Engineer Date City manager Date 40 Contract Summary: Original Work Order #7 Amount $ 128,419.30 Change Order 7 $ (37,286.20) Current Work Order #7 Amount $ 91,133.10 pelwo7