Loading...
Ordinance No. 8,502990128 -4 ORDINANCE NO. 8502 • AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 1 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR WORK ORDER NO. 6 ON THE ANNUAL SEWER REHABILITATION CONTRACT 1998 -1999; AUTHORIZING FINAL PAYMENT OF THE SUM OF FIFTY -EIGHT THOUSAND THREE HUNDRED TWENTY -THREE AND NO /100 DOLLARS ($58,323.00) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for Work Order No. 6 on the Annual Sewer Rehabilitation Contract 1998 -1999; and WHEREAS, a change order in the amount of TEN THOUSAND SIX HUNDRED EIGHTY - NINE AND NO /100 DOLLARS ($10,689.00) to adjust the final unit bid quantities is necessary to reflect the actual quantities used for Work Order No. 6 on the Annual Sewer Rehabilitation Contract 1998 -1999 as well as the amount remaining due to P.M. Construction and Rehabilitation, L.P.,; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of FIFTY -EIGHT THOUSAND THREE HUNDRED TWENTY -THREE AND NO 1100 DOLLARS ($58,323.00); NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 1 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities for Work Order No. 6 on the Annual Sewer Rehabilitation Contract 1998 -1999. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. ® Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as 990128 -4a ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. ,7 Section 3: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 4: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of FIFTY -EIGHT THOUSAND THREE HUNDRED TWENTY -THREE AND NO /100 DOLLARS ($58,323.00) is hereby authorized. Section 5: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28 "' day of January, 1999. /,� PETE C. ALFARO, Mayor ATTEST: J� EILEEN P. HALL, City Clerk APPROVED AS TO FORM: c4UO04,52,� I ACIO RAMIRE ., City Attorney cAMy Doc uments\ Council) MeetingsU anuary Tina]PayAnnua[SewerRehab.doc 2 ­CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE ORDER NO.1 TO WORK ORDER NO. 6 North Burnett to South Burnett 12121/98 This Change Order includes pipe bursting, reconnecting services, manhole sealing, point repairs, remove /replace pipe open cut and miscellaneous items in accordance with the plans for work on North Burnett to South Burnett. Item Description Unit Orig. Quant. Final Quant. Diff. Unit Price Cost 1 Pipe burst 6" & 8 ", 0' -8' deep( 8" SDR 19) LF 760 345 -415 $ 42.00 $ (17,430.00) 5 Pipe burst 8" & 10 ", 8' -15' deep LF 0 135 135 $ 50.00 $ 6,750.00 13 Remove Existing Slipliner, all sizes & dep LF 0 150 150 $ 5.00 $ 750.00 14 Reconnect service - short side, 0' -8' deep EA 7 4 -3 $ 500.00 $ (1,500.00) 151 Reconnect service - short side, over 8' de a EA 0 2 2 $ 700.00 $ 1,400.00 16 Reconnect service - long side, 0'- 8' deep EA 2 0 -2 $ 1,200.00 $ (2,400.00) 18 Manhole Wall Sealing VF 32 39.6 7.6 $ 85.00 $ 646.00 19 Replace /install new manhole. 0' to 8' deer, EA 4 1 -3 $ 1,500.00 $ (4,500.00) 22 Extra Cement Stabilized Sand TON 20 0 -20 $ 20.00 $ (400.00) 23 Point Rprlobst rmv - pipe bursting, 0' -8' deep EA 0 1 1 $ 300.00 $ 300.00 32 Clean 6" - 12" sewer LF 320 503 183 $ 3.00 $ 549.00 35 TV inspection - w /tapes & report LF 320 503 183 $ 1.00 $ 183.00 52 Rmv /repl 6" to 12 ", w /modified bedding,0' to 8' deep LF 310 327 17 $ 65.00 $ 1,105.00 53 Rmv /repl 6" to 12 ", w /modified bedding,8' to 15' deep LF 0 48 48 1 $ 75.00 $ 3,600.00 61 Rmv /repl up to 8" Concrete SY 10 0 -10 $ 60.00 $ (600.00) 67 Hydromulch Seeding SY 14 300 286�y$ 3.00 $ � .N!r t !y T '`. V(. ++== YLL9{r'��� � Yl •r' lYti1.G�1' 1� t858.00 j'�S.�r.� Total Change Order No. 1 on Work Order No. 6 ? MIM M3 y$}y(10,689.00) P.M. Construction Dzfte City Engineer Date Finance Date City Manager Date Work Order Summary: ® Initial work order No.6 $ 69,012.00 Change Order No.1 To Work Order No. 6 $(10,689.00) Final Work Order No. 6 Amount. $ 58,323.00 EXHIBIT A changeorder6annualss