Ordinance No. 8,457981124 -6 ORDINANCE NO. 8457 0 AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 4 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE ANNUAL SEWER REHABILITATION CONTRACT 1998 -1999; AUTHORIZING FINAL PAYMENT OF THE SUM OF ONE HUNDRED EIGHTY -SIX THOUSAND SEVEN HUNDRED EIGHTY -TWO AND. 60/100 DOLLARS ($186,782.60) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., AND ACCEPTANCE OF WORK ORDER NO. 4 FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.F., for the Annual Sewer Rehabilitation Contract 1998 -1999 (the "Project "); and WHEREAS, a deduct change order in the amount of FOUR HUNDRED EIGHT AND 30/100 DOLLARS ($408.30) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction and Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City's Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City's Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Annual Sewer Rehabilitation Contract 1998 -1999 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of ONE HUNDRED EIGHTY -SIX THOUSAND SEVEN HUNDRED EIGHTY -TWO AND 60 /100 DOLLARS ($186,782.60); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 4 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities and accept Work Order No. 4 for the Annual Sewer Rehabilitation Contract 1998 -1999. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. • 981124 -6a is Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore issued by the City's Engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to P.M. Construction and Rehabilitation, L.P. in the amount of ONE HUNDRED EIGHTY -SIX THOUSAND SEVEN HUNDRED EIGHTY -TWO AND 60/100 DOLLARS ($186,782.60) and acceptance of Work Order No. 4 are hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24" day of November, 1998. PETE C. ALFAR , Mayor ATTEST: 2 "004r v EILEEN P. HALL, City Clerk APPROVED AS TO FORM: cAMyDocumenls\ Councill MeelingsWovember \AuthorizeDeductChangeOrder4& WorkOrder4forAnnualSewerRehabK9 8- 99.doc E CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE C- 7, F,,. =R N0.4 Bayway Drive and Pin Gak Sanitary S,;:vrer spans 11/10/98 This Change Order includes 8" and 10" pipe bursting, reconnecting services, manhole sealing, point repairs and miscellaneous items in accordance with the plans for work on Bayway Drive and Pin Oak. :[: Orig. Final Unit Item Description Unit Quant. Qua Price Pipe burst 6" & 8 ", 0' -8' deep( 8" SDR 1 19) Pipe burst 8" & 10 ", 8' -15' deep( 10" SDR 5 19) Remove existing slipliner, all sizes & 13 depths Reconnect service - short side, 0' -8' 14 deep Reconnect service - short side, over 8' $21Replace/iinstall p hole Wall Sealing l /install new manhole, 0' -8' deep ring and cover 22 1 Extra cement stabilized sand Point Rpr /obst rmv - pipe bursting, 0' -8' 23 deep 29 Trench Safety, up to 8' deep 30 Trench Safety, 8' -15' deep 62 Rmv /repl up tot" HMAC, Type D 65 Set up traffic control 67 Hydromulch Seeding Total Change Order No. 4 1 W-�aMamrI'!%v�1WNM • • 0. - rinance Date Work Order Summary: Initial work order No. 4 Change Order No.4 Final Work Order No. 4 Amount Cost LF 1200 1154 -46 $ 42.00 $ (1,)32.00) LF 2618 2584 -34 $ 50.00 $ (1 ,700.00) LF 2186 1431 -755 $ 5.00 $ (3,775.00) EA 24 18 -6 $ 500.00 $ (3,000.00) EA 14 14 0 $ 700.00 $ - 1 VF 88.5 117 28.5 1 $ 85.00 $ 2,422.50 EA 2 2 0 $ 1,500.00 $ - EA 1 2 1 $ 300.00 $ 300.00 TON 70 492.31 422.31 $ 20.00 $ 8,446.20 EA 2 2 0 $ 300.00 $ - LF 80 80 0 $ - LF 115 115 0 $ 1.00 $ - SY 39 0 -39 $ 30.00 $ (1,170.00) EA 1 1 0 $ 500.00 $ - SY 292 292 0 $ 3.00 $ - Jill .2 116, . $ (408.30) r ± � ��1�pp .i7,�1�'�•� =� \ ' T' r "� 3 x ity ngineer Date City Manager 229,593.50 - $408.30 229,185.20 EXHIBIT A changeorder4an nualss Date