Ordinance No. 8,446981112 -6 ORDINANCE NO. 8446 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 WITH ALLCO, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE WARD, ELTON, CEDAR AND BAYOU SANITARY SEWER REHABILITATION PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF THIRTY - EIGHT THOUSAND FOUR HUNDRED FORTY -TWO AND 40 /100 DOLLARS ($38,442.40) TO ALLCO, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Allco, Inc., for the Ward, Elton, Cedar and Bayou Sanitary Sewer Rehabilitation project (the "Project "); and WHEREAS, a change order in the amount of THIRTEEN THOUSAND ONE HUNDRED NINETY -ONE AND 01 /100 DOLLARS ($13,191.01) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to Allco, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Ward, Elton, Cedar and Bayou Sanitary Sewer Rehabilitation project and improvements and has heretofore issued his Certificate of Final Acceptance and-has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Allco, Inc., the sum of THIRTY -EIGHT THOUSAND FOUR HUNDRED FORTY -TWO AND 40 /100 DOLLARS ($38,442.40); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Allco, Inc., to adjust the final unit bid quantities for the Ward, Elton, Cedar and Bayou Sanitary Sewer Rehabilitation project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as 981112 -6a ® provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to Allco, Inc., in the amount of THIRTY -EIGHT THOUSAND FOUR HUNDRED FORTY -TWO AND 40/100 DOLLARS ($38,442.40) is hereby authorized. Section b: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12" day of November, 1998. ,( !, PETE C. ALFAR , Mayor ATTEST: EILEEN P. HALL, 61ty Clerk APPROVED AS TO FORM: ACIO RAMIREZ, SR., ity Attorney c:1MyDocuments% Council\ Meetings\ Novemberl ChangeOrderFinaiPayWardE ltonCedar &Bayou ] 2.doc 0 2 y ® City of Baytown Ward, Cedar, Elton and Bayou Sanitary Sewer Rehab Project No. 97 -95G36 -005 Change Order No.2 Adjustment of Final Quantities Date: October 9, 1998 r 1 Item Description Units Original Change Quantity Finat Adjusted Quantity Contract Contract NO. Contract Order Subtotal Quantities Change Order Unit Price Quantities No.1 No.2 Price Extenstion i Bursting with 12" HDPE, SDR 17, of existing 12" sewer i pines I 1 L Cnn 1 77T. T EXHIBIT A page 1 Sanitary Sewer Manhole Wall - - -- i -- ay.a J 01.:)U -J b,Z03.75 2 Seating V. F. 50 0 50 30.86 -19.14 S 85.00 S (1,626.90) Sanitary sewer Manhole 3 replacement EA. 1 0 1 0 -1 52,250.00 S (2,250.00) Service Connection, 4 -in and 6 -in 4lines;CIP EA. 7 0 7 7 0 $ 750.00 S Work at storm box at station 5 0 +00; CIP L.S. 1 0 1 1 0 S1,500.00 S 6 Work at storm box, station 4 +65 L.S. 1 0 1 1 0 51,500.00 S Wet or dry point repair or 7 obstruction removal up to 12 LF EA. 3 0 3 2 -1 51,800.00 S (1,800.00) Extra length point repair for Item 816 above L. F. 30 0 30 0 -30 S 100.00 S (3,000.00) Grouting of void space above new 9 HDPE pipe C.Y. 30 0 30 0 -30 S 15.00 S (450.00) Cedar.T1tofi`&TBaWl' .�;r:�� �3 r?�� >�� Y:. °����� -�. � 21, � =_r�. a�•r�,t��:�y�;s����_ Pipe bursting with 8" HDPE SDR 10 19, of existing 8" sewer pipe L.F. 1700 0 1700 1938 238 S 47.50 S 11,305.00 Pipe bursting with 10' HDPE SDR 11 19, of existing 10" sewer pipe L.F. 440 0 440 452 12 S 52.50 S 630.00 Sanitary Sewer Manhole Wall 12 Sealing I V. F. 60 0 60 45.75 -14.25 S 85.00 5 (1,211.25) Sanitary sewer Manhole 13 replacement EA. 1 0 1 2 1 52,250.00 S 2,250.00 14 Service Connection, 4" lines EA. 33 0 33 32 -1 S 750.00 S (750.00) 15 Relocate service connection EA. 2 0 2 4 2 S 750.00 $ 1,500.00 Wet or dry point repair or 16 obstruction removal up to 12 LF EA. 2 0 2 5 3 51,800.00 S 5.400.00 Extra length point repair for Item 17 16 above L.F. 10 0 10 0 -10 S 100.00 S (1,000.00) Grouting of existing 8 -in sewer 18 line to be abandoned: CIP C.Y. 9 0 9 12 3 S 15.00 S 45.00 Cut and plug existing 8" sewer line to be abandoned (only 1 plug 19 required on downstream end) L. S. 1 0 1 1 0 S 750.00 S ..�� ?d.mxC. ti:a'na Ord er'No Traffic Control Set -up and 20 Removal; CIP L. S. 0 1 1 1 0 52.900.00 S - 21 113arricade Rental DAY 0 5 1 5 10 5 S 525.00 S 2.625.00 Remove existing pipe and replace with 12' HDPE, SDR 17 with 14' 22 steel casing L. F. 0 150 150 147 -3 S 57.50 S (172.50) Cement stabilized sand bedding 23 and backfill TON 0 360 360 143.22 - 216.78 S 17.30 S (3,750.29) Remove and replace existing 24 pavement S.Y. 0 90 90 93.04 3.04 S 80.00 S 243.20 EXHIBIT A page 1 City of Baytown Ward, Cedar, Elton and aayou Sanitary Sewer Rehab Project No. 97 -95G36 -005 Change Order No.2 Adjustment of Final Quantities Date: October 9. 1998 Item Description Units Original Change Quantity Final Adjusted Quantity Contract Contract NO. Contract Order Subtotal Quantities Change Order Unit Price Quantities No. i No. 2 Price I Extenstion Change Order No. 2 Total S 13,191.01 1. It is mutually understood and agreed that the time of performance for all work is revised to 99 working days. 2. It is understood and agreed that this change order is full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays and impacts related thereto and for performance of the changes within the time stated. Allco, Inc (Accepted) Finance it Contract S,1 mmarv• Original Contract Amount $ 252,785.00 Change Order No. 1 S 18,953.00 Change Order No. 2 S 13,191.01 Amended Contract Amount S 284,929,01 Original Performance Duration 50 working days Change Order No. 1 (add) 5 working days Change Order No. 2 (add) 44 working days Amended Performance Duration 99 working days Date Date Director of Engineering & Inspection (Approved) City Manager Date Date page 2 • City of Baytown Ward, Cedar, Elton and Bayou Sanitary Sewer Rehab Project No, 97- 95G36.005 Final Pay Application Date: November 12, 1998 Item Description NO, Units Original Change Contract Order Quantities No.1 Change Order No.2 Final Contract Amount Quantities Unit Earned Price 1 Pipe Bursting with 12- HOPE, L.F. 1500 -150 90.5 1440,5 Is 57.50 $ 82.828.75 2 ISanitary Sewer Manhole Wall V.F. 50 0 -19.14 30.86 $ 85.00 $ 2,623.10 3 Sanitary sewer Manhole EA 1 0 -1 0 S 2,250.00 S - 4 Service Connection, 4 -in and S. EA. 7 0 0 7 $ 750.00 S 5,250.00 5 Work al storm box at station L.S. 1 0 0 1 S 1,500.00 $ 1,500.00 6 Work at storm box, station 4+651 LS. 1 0 0 1 $ 1,500.00 $ 1.500.00 7 We( or d point repair or EA 3 0 -t 2 S 1,800.00 $ 3,600.00 8 Extra length point repair for L.F. 30 1 0 -30 0 $ 100.00 $ - 9 Grouting of void space above ed`ar: -Elton C.Y. 30 0 .30 0 1 S 15.00 $ 0 238 10 Pipe bursting with 8' HDPE L.F. 1700 1938 S 47.50 S 92.055.00 11 Pipe bursting with 10' HOPE L.F. 440 0 12 1 452 S 52.50 S 23.730.00 12 Sanitary Sewer Manhole Wall I V.F. 60 0 -14.25 45.75 S 85.00 S 3.888.75 13 Sanitary sewer Manhole EA. 1 0 1 2 S 2.250.00 S 4.500.00 14 Service Connection, 4' lines EA 33 0 -1 32 S 750.00 S 24,000.00 15 Relocate service connection' EA 2 0 2 4 S 750.00 $ 3.000.00 16 Wet ordy point repair or FA. 2 1 0 3 S 1,800.00 S 9,000.00 17 Extra length point repair for L.F. 10 0 -10 S 100.00 S 18 Grouting of existing 8 -in sewer C.Y. 9 0 3 $ 15.00 S 180.00 19 Cut and plug existing 8' sewer L.S. 1 0 0 Al2 S 750.00 $ 750.00 20 Traffic Control Set -up and L.S. 1 0 0 S 2,900.00 S 2.900.00 21 Barricade Rental DAY 0 S $ 525.00 S 5,250.00 22 Remove existing pipe and L.F. E36 0 -3 147 S 57.50 $ ,a52.50 23 Cement stabilized sand beddin 7ON 0 - 216.78 143.22 S 17.30 5 ��7 24 emove an replace excstin9 S.Y. 0 3.Oa 93.04 80.00 .477.71 .4aJ .20 TOTAL AMOUNT EARNED: $ 284,929.01 PREVIOUS PAYMENTS: $246,486.61 FINAL PAYMENT: $38,442.40 Contract Summa [y* Original Contract Amount S 252,785.00 Change Order No. 1 S 18,953.00 Change Order No. 2 S 13,191.01 Amended on rac moue Original Performance Duration 50 working days Change Order No. 1 (add) 5 working days Change Order No. 2 add 44 working days Amended Performance Duration wor ing days Allco. Inc (Accepted) ate Finance Date Director of Engineering & Date Inspection (Approved) City Klanager Dale