Loading...
Ordinance No. 8,427981022 -4 ORDINANCE NO. 8427 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH TEXAS STERLING CONSTRUCTION, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE WILLIAM, PINE, STIMSON AND FLORIDA SANITARY SEWER REHABILITATION PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF FORTY -ONE THOUSAND FIVE HUNDRED EIGHTY -FOUR AND 65/100 DOLLARS ($41,584.65) TO TEXAS STERLING CONSTRUCTION, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with Texas Sterling Construction, Inc., for the William, Pine, Stimson and Florida sanitary sewer rehabilitation project (the "Project "); and WHEREAS, a change order in the amount of EIGHTEEN THOUSAND FOUR HUNDRED TWENTY -ONE AND NO 1100 DOLLARS ($18,421.00) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to Texas Sterling Construction, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the William, Pine, Stimson and Florida sanitary sewer rehabilitation project and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to Texas Sterling Construction, Inc., the sum of FORTY -ONE THOUSAND FIVE HUNDRED EIGHTY -FOUR AND 65/100 DOLLARS ($41,584.65); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Texas Sterling Construction, Inc., to adjust the final unit bid quantities for the William, Pine, Stimson and Florida sanitary sewer rehabilitation project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as C 981022 -4a provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to Texas Sterling Construction, Inc., in the amount of FORTY -ONE THOUSAND FIVE HUNDRED EIGHTY -FOUR AND 65/100 DOLLARS ($41,584.65) is hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 22 " day of October, 1998. A� PETE C. ALFARO, Mayor ATTEST: EILEEN P: HALL, City Clerk APPROVED AS TO FORM: izz ACIO RAMIREZ, SR. C' y Attorney c:\ MyDocuments\ CouncillMeetings \October\ChangeOrderl Final PayWilIiamPineStimsonfloridaSewer .doc 2 • • CITY OF BAYTOWN William, Pine, Stimson & Florida Sanitary Sewer Rehab Project No. 98- CD117 -10 Change Order No. 1 Daate : October 14, 1998 This change order adjusts the final quantities of all items. The number of working days does not change. It is mutually understood and agreed that the time of performance for all work will remain 50 working days. 2. !t is understcod and agreed : "at this change order is full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays and impacts related thereto and for performance of the changes within the time stated. Texas SrerIingrCbnstVofi, Inc. Date / Assistant Director of Enginee T Inspections Date Finance Date City Manager Date Contract Summary: Original Contract Amount $ 212,205.50 Change Order No.1 $ 18,421.00 EXHIF A Final Contract Amount $230,626.50 CO1 WmPine Orig. Final Difference Unit Difference Contract Quantities Price in Item Description Unit Quant. Cost Pipe bursting 6 -in or 8 -in with 8 -in 11 HDPE, SOR -19, CIP LF 4652 4498 -154 $ 31.00 $ (4,774.00) 21 Remove existing 5 -in slipliner; CIP LF 576 1927 1351 $ 20.00 $ 27,020.00 Sanitary sewer manhole 3 1 rehabilitation; CIP VF 47 30.4 -16.6 $ 75.00 $ (1,245.00) Install new or replace existing J manhole, cast -in -place or precast concrete, all depths; CIP EA 7 7 0 L.$1.900.00 $ Short side service reconnections from main to easement or right -of- 5 way line; CIP EA 129 133 4 $ 225.00 $ 900.00 Long side service reconnections from main to easement or right -of- way line (long side laps are under 6 pavement); CIP EA 5 5 0 $ 250.00 $ Wet of dry point repair or 7 obstruction removal, all depths; CIP EA 5 4 -1 $ 220.00 $ (220.00) Extra length point repair or 8 obstruction removal, all depths; CIP LF 40 0 -40 $ 16.50 $ (660.00) 9 Trench safety; CIP LF 135 135 0 $ 0.10 $ Cement Stabilized sand under pavement for point repairs, 2 10 sackslton; CIP TONS 50 0 -50 $ 17.00 $ (850.00) Remove and replace asphalt pavement and base at point 11 repairs, includes saw cutting; CIP SY 25 0 -25 $ 70.00 $ (1,750.00) Hydromulch seed disturbed areas; 12 CIP LS 1 1 0 $5,000.00 $ - ota Change Order o. $ 18,421.00 It is mutually understood and agreed that the time of performance for all work will remain 50 working days. 2. !t is understcod and agreed : "at this change order is full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays and impacts related thereto and for performance of the changes within the time stated. Texas SrerIingrCbnstVofi, Inc. Date / Assistant Director of Enginee T Inspections Date Finance Date City Manager Date Contract Summary: Original Contract Amount $ 212,205.50 Change Order No.1 $ 18,421.00 EXHIF A Final Contract Amount $230,626.50 CO1 WmPine