Ordinance No. 8,397980910 -16
ORDINANCE NO. 8397
® AN ORDINANCE ACCEPTING THE SPECIFIC AND AGGREGATE STOP LOSS
COVERAGE WITH SUN LIFE OF CANADA, BROKERED THROUGH VISCO,
APPLICABLE TO THE CITY OF BAYTOWN'S MEDICAL AND DENTAL
BENEFITS PROGRAM; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN,
THE SUM OF ONE HUNDRED FIFTY -NINE THOUSAND THREE HUNDRED AND
NO /100 DOLLARS ($159,300.00); MAKING OTHER PROVISIONS RELATED
THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
****************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council of the City of Baytown hereby accepts the specific and
aggregate stop loss coverage with Sun Life of Canada, brokered through VISCO, applicable to the City of
Baytown's medical and dental benefits program.
Section 2: That the City Council hereby authorizes payment to Sun Life of Canada of the sum of
ONE HUNDRED FIFTY -NINE THOUSAND THREE HUNDRED AND NO /100 DOLLARS
($159,300.00) for specific and aggregate stop loss coverage.
Section 3: That pursuant to the provisions of Texas Local Government Code Annotated
§252.048, the City Manager is hereby granted general authority to approve any change order involving a
decrease or an increase in costs of FIFTEEN THOUSAND AND NO /100 DOLLARS ($15,000.00) or
less, provided that the original contract price may not be increased by more than twenty-five percent
(25 %) or decreased by more than twenty-five percent (25 %) without the consent of the contractor to such
decrease.
Section 4: This ordinance shall take effect immediately from and after its passage by the City
Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of
Baytown this the 10th day of September, 1998.
/,�- (4-
PETE C. ALFARO, Mayor
ATTEST:
EILEEN P. HALL, City Clerk
APPROVED AS TO FORM:
lz�, / Fz), egi2�t� —
ACIO RAMIREZ, SR., Ci4 At rney
cAMyDocuments\Counci1\ Meetings \SeptembeAS top LossSunLireVISCOI O.doc
CITY OF BAYTOWN
ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99
CHANGE ORDER NO.3
N & S Shepherd, Country Club View, Civic Drive,
Goose Creek Drive and Pecan manor Seniiary Sewer Repairs
9/10/98
This Change Order includes 6" & 8" and 10" & 12" pipe bursting, reconnecting services, manhole sealing,
point repairs and miscellaneous items in accordance with the plans for work on N. & S. Shepherd,
Country Club View, Civic Drive, Goose Creek Drive and Pecan Manor Sanitary Sewer Repairs.
Item
Description
Unit
Orig.
Quant,
Final
Quant.
Diff.
Unit
Price
Cost
1
Pipe burst 8 ", 0' -8' deep
LF
4400
4035
-365
$ 42.00
$ (15,330.00)
4
Pipe burst 10 ", 0' -8' deep
LF
0
0
0
$ 45.00
$ -
7
Pipe burst 12 ", 0' -8' deep
LF
300
312
12
$ 60.00
$ 720.00
13
Remove existing slipliner, all sizes & dep
LF
0
45
45
$ 5.00
$ 225.00
14
Reconnect service - short side, 0' -8' deeq
EA
65
55
-10
$ 500.00
$ (5,000.00)
16
Reconnect service - long side, 0' -8' deep
EA
12
6
-6
$1,200.00
$ (7,200.00)
18
Manhole Wail Sealing
VF
100
95.84
-4.16
$ 85.00
$ (353.60)
19
Repl /instals new manhole, 0' -8' deep
EA
5
4
-1
$1,500.00
$ (1,500.00)
20
Repl /install new manhole, over 8' deep
VF
0
0
0
$ 200.00
$ -
21
Replace /install ring and cover
EA
3
3
0
$ 300.00
$ -
22
Extra cement stabilized sand
TON
100
53.8
-46.2
$ 20.00
$ (924.00)
23
Point Rpr /obst rmv - pipe bursting, 0' -8' d
a EA
2
5
3
$ 300.00
$ 900.00
26
Extra length point repair, all depths
LF
10
0
-10
$ 100.00
$ (1,000.00)
29
Trench Safety, up to 8' deep
LF
200
200
0
$ 1.00
$ -
32
Clean 6 " -12" Sewer
LF
0
0
0
$ 3.00
$ -
35
TV Inspection
LF
0
0
0
$ 1.00
$ -
52
Rmv /Repl 6 " -12 ", incl. Mod. Bedding, 0'-
8' deep, 50 l.f. min.
LF
0
0
0
$ 65.00
$ -
53
Rmv /Repl 6 " -12 ", incl. Mod. Bedding, 8'-
15' deep, 50 l.f. min.
LF
0
0
0
$ 75.00
$ -
58
Auger & Encase 8 " -10 ", all depths
LF
0
0
0
$ 100.00
$ -
60
Rmvl repl up to 5" sidewalk/Drive (incl.
Saw cutting, reinf.)
SY
10
0
-10
$ 45.00
$ (450.00)
61
Rmv/ repl up to 8" Concrete pvmnt. (inci.
Saw cutting, reinf., Base removal
SY
10
0
-10
$ 60.00
$ (600.00)
62
Rmv /repl up to2" HMAC, Type D
SY
10
26U71
$ 30.00
$ 500.10
63
1" rock with no fines for bedding
TON
15
$ 20.00
$ (300.00)
65
Set up traffic control
EA
2
$ 500.00
$ 500.00
67
Hydromulch Seeding
SY
550
4$
3.00
$ (210.00)
68
Root and Tuberculation Removal
L.S.
0
$ 8,677.90
$ -
Total Change Order No. 3
$ (30,022.50)
P.M. Construction Date City Engineer Date
Finance
Work Order Summary:
Final construction cost
Initial work order
Change Order No-3
to City Manager
$244,677.50 A
274,700.00
- $30,022.50
changeorder3annualss
Date