Loading...
Ordinance No. 8,397980910 -16 ORDINANCE NO. 8397 ® AN ORDINANCE ACCEPTING THE SPECIFIC AND AGGREGATE STOP LOSS COVERAGE WITH SUN LIFE OF CANADA, BROKERED THROUGH VISCO, APPLICABLE TO THE CITY OF BAYTOWN'S MEDICAL AND DENTAL BENEFITS PROGRAM; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF ONE HUNDRED FIFTY -NINE THOUSAND THREE HUNDRED AND NO /100 DOLLARS ($159,300.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown hereby accepts the specific and aggregate stop loss coverage with Sun Life of Canada, brokered through VISCO, applicable to the City of Baytown's medical and dental benefits program. Section 2: That the City Council hereby authorizes payment to Sun Life of Canada of the sum of ONE HUNDRED FIFTY -NINE THOUSAND THREE HUNDRED AND NO /100 DOLLARS ($159,300.00) for specific and aggregate stop loss coverage. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated §252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND NO /100 DOLLARS ($15,000.00) or less, provided that the original contract price may not be increased by more than twenty-five percent (25 %) or decreased by more than twenty-five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 10th day of September, 1998. /,�- (4- PETE C. ALFARO, Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: lz�, / Fz), egi2�t� — ACIO RAMIREZ, SR., Ci4 At rney cAMyDocuments\Counci1\ Meetings \SeptembeAS top LossSunLireVISCOI O.doc CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE ORDER NO.3 N & S Shepherd, Country Club View, Civic Drive, Goose Creek Drive and Pecan manor Seniiary Sewer Repairs 9/10/98 This Change Order includes 6" & 8" and 10" & 12" pipe bursting, reconnecting services, manhole sealing, point repairs and miscellaneous items in accordance with the plans for work on N. & S. Shepherd, Country Club View, Civic Drive, Goose Creek Drive and Pecan Manor Sanitary Sewer Repairs. Item Description Unit Orig. Quant, Final Quant. Diff. Unit Price Cost 1 Pipe burst 8 ", 0' -8' deep LF 4400 4035 -365 $ 42.00 $ (15,330.00) 4 Pipe burst 10 ", 0' -8' deep LF 0 0 0 $ 45.00 $ - 7 Pipe burst 12 ", 0' -8' deep LF 300 312 12 $ 60.00 $ 720.00 13 Remove existing slipliner, all sizes & dep LF 0 45 45 $ 5.00 $ 225.00 14 Reconnect service - short side, 0' -8' deeq EA 65 55 -10 $ 500.00 $ (5,000.00) 16 Reconnect service - long side, 0' -8' deep EA 12 6 -6 $1,200.00 $ (7,200.00) 18 Manhole Wail Sealing VF 100 95.84 -4.16 $ 85.00 $ (353.60) 19 Repl /instals new manhole, 0' -8' deep EA 5 4 -1 $1,500.00 $ (1,500.00) 20 Repl /install new manhole, over 8' deep VF 0 0 0 $ 200.00 $ - 21 Replace /install ring and cover EA 3 3 0 $ 300.00 $ - 22 Extra cement stabilized sand TON 100 53.8 -46.2 $ 20.00 $ (924.00) 23 Point Rpr /obst rmv - pipe bursting, 0' -8' d a EA 2 5 3 $ 300.00 $ 900.00 26 Extra length point repair, all depths LF 10 0 -10 $ 100.00 $ (1,000.00) 29 Trench Safety, up to 8' deep LF 200 200 0 $ 1.00 $ - 32 Clean 6 " -12" Sewer LF 0 0 0 $ 3.00 $ - 35 TV Inspection LF 0 0 0 $ 1.00 $ - 52 Rmv /Repl 6 " -12 ", incl. Mod. Bedding, 0'- 8' deep, 50 l.f. min. LF 0 0 0 $ 65.00 $ - 53 Rmv /Repl 6 " -12 ", incl. Mod. Bedding, 8'- 15' deep, 50 l.f. min. LF 0 0 0 $ 75.00 $ - 58 Auger & Encase 8 " -10 ", all depths LF 0 0 0 $ 100.00 $ - 60 Rmvl repl up to 5" sidewalk/Drive (incl. Saw cutting, reinf.) SY 10 0 -10 $ 45.00 $ (450.00) 61 Rmv/ repl up to 8" Concrete pvmnt. (inci. Saw cutting, reinf., Base removal SY 10 0 -10 $ 60.00 $ (600.00) 62 Rmv /repl up to2" HMAC, Type D SY 10 26U71 $ 30.00 $ 500.10 63 1" rock with no fines for bedding TON 15 $ 20.00 $ (300.00) 65 Set up traffic control EA 2 $ 500.00 $ 500.00 67 Hydromulch Seeding SY 550 4$ 3.00 $ (210.00) 68 Root and Tuberculation Removal L.S. 0 $ 8,677.90 $ - Total Change Order No. 3 $ (30,022.50) P.M. Construction Date City Engineer Date Finance Work Order Summary: Final construction cost Initial work order Change Order No-3 to City Manager $244,677.50 A 274,700.00 - $30,022.50 changeorder3annualss Date