Ordinance No. 8,351E 980723 -7 ORDINANCE NO. 8351 AN ORDINANCE AUTHORIZING DEDUCT CHANGE ORDER NO. 2 WITH P.M. CONSTRUCTION AND REHABILITATION, L.P., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE SAVELL SANITARY SEWER WORK ORDER UNDER THE ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99; AUTHORIZING FINAL PAYMENT OF THE SUM OF NINETY -THREE THOUSAND EIGHT HUNDRED SIXTY - FOUR AND 30/100 DOLLARS ($93,864.30) TO P.M. CONSTRUCTION AND REHABILITATION, L.P., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with P.M. Construction and Rehabilitation, L.P., for the Savell Sanitary Sewer Work Order under the Annual Sanitary Sewer Rehabilitation Contract - 1998 -99 (the "Project "); and WHEREAS, a deduct change order in the amount of TWENTY -SIX THOUSAND SEVEN HUNDRED THIRTY -FIVE AND 70/100 DOLLARS ($26,735.70) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to P.M. Construction and Rehabilitation, L.P.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Savell Sanitary Sewer Work Order under the Annual Sanitary Sewer Rehabilitation Contract — 1998 -99 and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to P.M. Construction and Rehabilitation, L.P., the sum of NINETY -THREE THOUSAND EIGHT HUNDRED SIXTY -FOUR AND 30 /100 DOLLARS ($93,864.30); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize deduct Change Order No. 2 with P.M. Construction and Rehabilitation, L.P., to adjust the final unit bid quantities for the Savell is Sanitary Sewer Work Order under the Annual Sanitary Sewer Rehabilitation Contract - 1998 -99. 980723 -7a is A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section S: That final payment to P.M. Construction and Rehabilitation, L.P., in the amount of NINETY -THREE THOUSAND EIGHT HUNDRED SIXTY -FOUR AND 30/100 DOLLARS ($93,864.30) is hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 23`d day of July, 1998. /,t a C ';g� PETE C. ALFARO, Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: oe momwce— 'C et4ACIO RAMIREZ, SR., it Attorney cAMyDocuments\ Council\ MeetingsUulyl ChangeOrder2 Final Pays aveII San itarySewer23 .doc 0 2 0 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE ORDER NO. 2 Memorial and Savell Sanitary Sewer Repairs 7120198 This Change Order includes 10 -inch pipe bursting and 8 -inch removal and replacement in accordance with the plans for work on Savell Drive. The tine on Savell was televised and it was determined that installation of a kickover, rehabilitation of portions of the 10 -inch line, replacement of a cast iron line, and removal of roots and tuberculation were required. The root an tuberculation removal were performed under work order no. 1. The work on Savell has a high priority due to an EPA administrative order to eliminate sewer overflows occuring during wet weather in the upstream section of this line. Item Description Unit Orig. Quant. Final Quant. Diff. Price Cost Savelt SS Rehab 1 Pipe burst 10 ", 0' -8' deep LF 1680 1463 -217 S 45.00 S (9,765.00) 14 Reconnect short service, 0' -8' deep EA 22 16 -6 S 500.00 S (3,000.00) 18 Manhole wall sealing VF 29 25.5 -3.5 5 85.00 S (297.50) 19 Repl /install new manhole, 0' -8' deep EA 4 4 0 S11,500.00 S 20 Repl /install new manhole, over 0' -8' deep VF 4 0 -4 S 200.00 5 (800.00) 22 Extra cement stabilized sand TON 120 95.664 -24.36 S 20.00 S (487.20) 29 Trench safety, up to 8' deep LF 200 200 0 S 1.00 S - 32 Clean 6" - 12" sewer LF 50 206 156 S 3.00 S 468.00 35 TV Inspection LF 50 206 156 5 1.00 S 156.00 52 Remove & replace 5 " -12 ", 0' -8' deep LF 60 77 17 S 65.00 S 1,105.00 53 Remove & replace 6 " -12 ", 8' -15' deep LF 25 0 -25 S 75.00 S (1,875.00) 60 Rmv /repl up to 5" sidewalkldriveway SY 280 26.4 -253.6 S 45.00 5 {11,412.00) 611 Rmvlrepl up to 8" concrete pvmt SY 37 29.7 -7.3 5 60.00 S (438.00) 651 Set up traffic control EA 1 1 0 S 500.00 S 67 Hydromulch seeding SY 280 150 -130 S 3.00 S (390.00) Total changes - Savell SS Rehab S (26,735.70) Total Change Order No. 1 S (26,735.70) P.M. Construction Date Finance Work Order Summary: Final construction cost Initial work order Change Order No. i 0 City Engineer Date ate City Manager S93,864.30 120,600.00 - 526,735.70 UhiL,.. A chang eorder2annualss Date