Ordinance No. 8,350980723 -6 ORDINANCE NO. 8350 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 WITH PM CONSTRUCTION AND REHABILITATION, L.P., FOR THE REHABILITATION OF SANITARY SEWERS IN PLUMWOOD PHASE II AND OLD HORACE MANN SCHOOL; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF TWENTY -THREE THOUSAND EIGHT HUNDRED AND 85/100 DOLLARS ($23,800.85); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with PM Construction and Rehabilitation, L.P., for the Rehabilitation of Sanitary Sewers in Plumwood Phase 11 and Old Horace Mann School. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of TWENTY -THREE THOUSAND EIGHT HUNDRED AND 85/100 DOLLARS ($23,800.85) to PM Construction and Rehabilitation, L.P., for Change Order No. 2 for the Rehabilitation of Sanitary Sewers in Plumwood Phase II and Old Horace Mann School. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND NO/] 00 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 23'd day of July, 1998. PETE C. ALFARO, Mayor . ATTEST: ILEEN P. HALL, City Clerk ® APPROVED AS TO FORM: :Xe 492=�J;�4 ACIO RAMIRE ., City Attorney cA Myoocumentsl CounciAMeetingsU ulyl ChangcOrd2SSRehabPIumwoodOldHoraceMann23 .doc • CHANGE ORDER NO. 2 Honorable Pete C. Alfaro, Mayor and City Council City of Baytown P. O. Box 424 Baytown, Texas 77522 July 22, 1998 Subject: Request for approval of rates on labor and/or materials and/or equipment. Contractor: P.M. Construction & Rehab, L.P. Project: Construction of Sanitary Sewer Rehabilitation in Old Horace Mann School Area, Job No. 04453, Contract No. 2, Construction of Plumwood Phase II Sanitary Sewer Rehabilitation, Job No. 044 -54, Contract No. 1 Original Contract Amount: $426,979.96 Dear Mayor and City Council: Your approval is requested on the following items for the above referenced contract. This work starts at Manhole EP 111 on Narcille, and proceeds west approximately 585 feet to a cleanout and serves 16 residential homes. This is a backyard easement between Olive and East Fayle. Item No. Description 2B. Pipebursting of 6" or 8" Sanitary Sewer With 8" H.D.P.E., SDR -19 Quantity Unit Each Cost E.\Current ProlV0aytownl044 -54 421044.52 41\044 -52 # 1 044.54 11 Change Order 2.dot 585 L. F. $ 27.00 $15,795.00 Eaf RK A Change Order No. 2 July 22, 1998 ® 044 -53, Contract No. 2 Page 2 044 -54, Contract No. 1 Item No. Description Quantity Unit Each Cost 4B. Short Side Service Reconnec- tions 16 Ea. $ 350.00 $ 5,600.00 6B. Standard Cast -In -Place or Precast Concrete Sanitary Sewer Manhole 2 Ea. $1,200.00 $ 2,400.00 7B. Smoke Testing of S.S. for Service Reconnections 585 L. F. $ 0.01 $ 5.85 Total Change Order No. 2 $ 23,800.85 Change Order No. 1 $ 8,596.00 Original Contract Amount $426,979.96 Adjusted Contract Amount $459,376.81 Original Contract Time 120 Calendar Days Extension of Time Change Order No. 1 0 Calendar Days Extension of Time Change Order No. 2 0 Calendar Days Total Contract Time 120 Calendar Days .7 Change Order No. 2 044 -53, Contract No. 2 044 -54, Contract No. 1 July 22, 1998 Page 3 Change Order No. 2 represents an increase of 5.57% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and/or waived hereby. SUBMITTED FOR APPROVAL LANGFORD ENGINEERING, INC. am Date Z— C` APPROVED: CITY OF BAYTOWN By: /. A r Pete C. Alfaro Mayor Date 2 y • ACCEPTED: PM CONSTRUCTION & REHAB, L.P. B y: %? '7'Y% . �Yj Date 2 9� 0 CITY OF BAYTOWN ANNUAL SANITARY SEWER REHABILITATION CONTRACT - 1998 -99 CHANGE ORDER NO. 2 Memorial and Savell Sanitary Sewer Repairs 7120198 This Change Order includes 10 -inch pipe bursting and 8 -inch removal and replacement in accordance with the plans for work on Savell Drive. The line on Savell was televised and it was determined that installation of a kickover, rehabilitation of portions of the 10 -inch line, replacement of a cast iron line, and removal of roots and tuberculation were required. The root an tuberculation removal were performed under work order no. 1. The work on Savell has a high priority due to an EPA administrative order to eliminate sewer overflows occuring during wet weather in the upstream section of this line. Item Description Unit Orig. Quant. Final Quant. Diff. Price Cost Savell SS Rehab 1 Pipe burst 10 ", 0' -8' deep LF 1680 1463 -217 S 45.00 S (9,765.00) 14 Reconnect short service, 0' -8' deep EA 22 16 -6 S 500.00 5 (3,000.00) 18 Manhole wall sealing VF 29 25.5 -3.5 S 85.00 S (297.50) 19 Repllinstall new manhole, 0'-8'-deep EA 4 4 0 S1.500.00 S - 20 Repllinstall new manhole, over 0'-8' deep VF 4 0 -4 S 200.00 S (800.00) 22 Extra cement stabilized sand TON 120 95.64 -24.36 S 20.00 S (487.20) 29 Trench safety, up to 8' deep LF 200 200 1 0 S 1.00 S - 32 Clean 6" - 12" sewer LF 50 206 156 S 3.00 S 468.00 35 TV Inspection LF 50 206 156 S 1.00 5 156.00 52 Remove & replace 6 " -12 ", 0' -8' deep LF 60 77 17 S 65.00 S 1,105.00 53 Remove & replace 6 " -12 ", 8' -15' deep LF 25 0 -25 S 75.00 S (1,875.00) 60 Rmv /repl up to 5" sidewalk/driveway SY 280 26.4 -253.6 S 45.00 S (11,412.00) 611 Rmvlrepl up to 8" concrete pvmt SY 37 293 -7.3 S 60.00 S (438.00) 65 Set up traffic control EA 1 1 0 S 500.00 5 - 67 Hydromulch seeding SY 280 150 -130 S 3.00 S (390.00) Total changes - Savell SS Rehab S (26,735.70) Total Change Order No. 1 S( P.M. Construction Date Finance • Date Work Order Summary'. Final construction cost 593,864.30 Initial work order 120,600.00 Change Order No. 1 - 526,735.70 City Engineer Date City Manager changeorder2annualss to