Ordinance No. 8,348980723 -4 ORDINANCE NO. 8348 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH ALLCO, INC., FOR THE WARD, CEDAR, ELTON AND BAYOU SANITARY SEWER REHABILITATION CONTRACT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF EIGHTEEN THOUSAND SIX HUNDRED TWENTY -FIVE AND NO 1100 DOLLARS ($18,625.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Allco, Inc., for the Ward, Cedar, Elton and Bayou Sanitary Sewer Rehabilitation contract. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of EIGHTEEN THOUSAND SIX HUNDRED TWENTY -FIVE AND NO /100 DOLLARS ($18,625.00) to Allco, Inc., for Change Order No. 1 for the Ward, Cedar, Elton and Bayou Sanitary Sewer Rehabilitation contract. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND NO /100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 23'd day of July, 1998. /, e, PETE C. ALFARO, Mayor ATTEST: - 9 Z� Z/z2z�__� - EILEEN P. HALL, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, SAlity Attorney c:\ MyDocument s\ Counci ] \McetingsUuly \ChangeOrderl WardCedarF1 ton Bayou SSReh AD. doc Change Order No. X Ward, Cedar, Elton, and Bayou Sanitary SeNver Rehabilitation Project Project No. 97 -95G36 -005 1. This contract for Ward, Cedar, Elton, and Bayou Sanitary Sewer Rehabilitation Project, Project No. 97 -95G36 -005, Baytown, Texas, is modified as follows: Statement of Change: a. Provide traffic control and comply with all notes as shown on attached drawings. b. In lieu of pipe - bursting the segment of sewer pipe under S.H. 146 between Manholes 5 and 6 on Sheet No. 2, open cut and remove the existing sewer pipe and replace with 12 -in. HDPE, SDR 17, with 14 -in. steel casing. c. Fill open cut trench with stabilized sand to bottom of existing pavement of S.H. 146, in accordance with Texas Department of Transportation (T.x•DOT) specifications. d. Remove existing concrete and asphalt pavement and replace with same per TxDOT specifications. 2. In consideration for the above change, it is mutually agreed that the contract price is increased as follows: ITEM APPROX No. QUA NNT. 20 1 UNIT OF MEASURE L. S. 21 5 Day 22 150 L.F. UNIT DESCRIPT[ON PRICE EXTENSION Traffic Control Set -up and Removal; CIP. 52,900.00 52,900.00 Barricade Rental; CIP 5525.00 S2,625.00 Remove existing pipe and replace with 12 -in. HDPE, SDR 17, with 14 -in. steel casing; CIP. 557.50 SS,625.00 23 360 Ton Cement stabilized sand bedding and backfiH, CIP. S17.30 S6,228.00 24 90 S. Y. Remove and replace existing pavement; CIP. SS0.00 57,200.00 Pale 1 of 2 Change Order No. 1 Ward, Cedar, Elton, and Bayou Sanitary SeNver Rehabilitation Project Project No. 97 -95G36 -005 ITEM APPROX. UNIT OF UNIT No. QUAN T. MEASURE DESCRIPTION PRICE EXTENSION 1 150 L. F. Deduct 150 L.F. pipe - bursting from Item No. 1. (S57.50) (13.625.00) TOTAL 518,933.00 3. Also, it is mutually understood and agreed that the time of performance for all wort: is increased five (5) working days. d. It is understood and agreed that this change order is a full and complete equitable adjustment and constitutes compensation in full on behalf of the contractor for all costs and markups directly or indirectly attributable to the changes ordered herein, for all delays, and impacts related thereto and for performance of the changes within the time stated. 5. Contract Summary Original Contract ?.mount Change Order No. 1 (add) Amended Contract Amount Original Performance Duration Change Order No. 1 (add) Ainended Performance Duration ACCEPTED Allco, Inc. Authorized Officer Finance Director n Date S 252,7S5.00 S 1S.953-0 S 271,738.00 50 working days 5 workingg dav3 55 working days APPROVED City of Baytown City Engineer Date City Manager Page 2 of 2 Date Date