Ordinance No. 8,229980312 -4 ORDINANCE NO. 8229 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH D & W CONTRACTORS, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE CENTRAL HEIGHTS PARK IMPROVEMENTS PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF SIXTEEN THOUSAND TWO HUNDRED EIGHTY -ONE AND 90/100 DOLLARS ($16,281.90) TO D & W CONTRACTORS, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with D & W Contractors, Inc., for the Central Heights Park Improvements project (the "Project "); and WHEREAS, a change order in the amount of SIXTEEN THOUSAND TWO HUNDRED EIGHTY -ONE AND 90/100 DOLLARS ($16,281.90) to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to D & W Contractors, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvements as constructed and completed by Contractor; and WHEREAS, there remains due and owing to D & W Contractors, Inc., the sum of SIXTEEN THOUSAND TWO HUNDRED EIGHTY -ONE AND 90/100 DOLLARS ($16,281.90); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section I.: That the City Council does hereby authorize Change Order No. 1 with D & W Contractors, Inc., to adjust the final unit bid quantities for the Central Heights Park Improvements project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as • 0 980312 -4a provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 4: That the Certificate of Final Acceptance heretofore - issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to D & W Contractors, Inc., in the amount of SIXTEEN THOUSAND TWO HUNDRED EIGHTY -ONE AND 90/100 DOLLARS ($16,281.90) is hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12 "' day of March, 1998. d4 PETE C. ALFAR , Mayor ATTEST: ZA�'2 P ,4� EILEEN P. HALL, City Clerk APPROVED AS TO FORM: Di'` efCKACI0 RAMIREZ, SR., y Attorney c:\MyDocuments\Council \Meetings \March \ChangeOrdI rinall'ayCentrall •leightsParkI2.doc 2 0 CITY bF BAYTOWN CHANGE ORDER #1 Central Heights Park Improvements P.O. No. 80043 3/5198 The amount of work performed on this project came in over the original contract amount. The overrun was for extra square yardage of concrete parking lot and driveway and lime stabilization plus additional footage of 8 -in retaining curb along the west side of the parking lot. The additional curb was required to provide a grade separation structure between the parking lot and the adjacent sidewalk. Item # Description Unit Orig. Quant. Final Quant. Quant. Diff. Cost Price Difference 1 6' concrete sidewalk SY 1030 1030.78 0.78 22.50 17.55 2 Parking lot and driveway SY 365 404.00 39.00 31.60 1,232.40 3 Lime stabilization SY 405 426.67 21.67 16.50 357.56 4 6" concrete curb LF 184 220.00 36.00 6.00 216.00 518" concrete curb LF 111 118.00 7.00 18.50 129.50 6 Wheelchair ramp EA 1 1.00 0.00 1,310.00 - 7 8" retaining curb LF 36 95.00 59.00 86.00 5,074.00 8 Pavement markings LS 1 1.00 0.00 1,300.00 - 9 Site prep. & cleanup LS 1 1.00 0.00 19,875.00 - 10 2'X 2' Grate inlet EA 1 1.00 0.00 900.00 - 11 4" PVC drain pipe LF 84 84.00 0.00 18 - Total Change Order #1 $7,027.01 D & W Contractors, Inc. Date City Engineer Date Finance Date City Manager Date Contract Summary: Original Contract Amount $72,542.00 Change Order #1 7,027.01 ® Final Contract Amount 579,569.01 Percent Overrun EXHIBIT A 9.7% changeorderctlhtspark i & w CONTRACTORS.) INC. CIVIL, & INI USTRIAL CONTRACTORS P. O. BOX 1075 CHANNELVIEW, TEXAS 77530 PROJECT: CITY OF BAYTOWN 15831 KLLER ROAD 1 HOUSTON, TEXAS 77049 OFC (281) 456 -0898 FAX: (281) 456 -0158 CENTRAL HEIGHTS PARK IMPROVEMENTS DATE: 03/09/98 P.O. #. 80043 INVOICE #: 980302 PAY ESTIMATE #: 3 FROM: 0124198 to 03/06/98 CONTRACT TIME: TOTAL TIME: TIME USED: WORK ORDER DATED: I I_ lTEM # DESCRIPTION UNri ORIGINAL QUANTITY QUANTITY THIS ESTIMATE QUANTITY TO DATE PRICE TOTAL 1 6' CONC. WALK S.Y. 1030 103038 $ 22.50 $ 23,192.55 2 j CONC. PARKING S.Y. 365 404 $ 31.60 $ 12,766.40 3 LIME STAB. S.Y. 405 426.67 $ 16.50 $ 7,040.06 4 6" CONC. CURB L.F. 184 220 $ 6.D0 $ 1,320.00 5 8" CONC. CURB L.F. 111 118 $18.50 $ 2,183.00 6 WHEELCHAIR RAMP EACH 1 1 $ 1,310.00 $ 1,310.00 7 8" RETAINING CURB LF. 36 95 $ 86.00 S 8,170.00 8 PVMT. MARKINGS L.S. 1 1 1 $ 1,300.00 $ 1300.00 9 SITE PREPARATION L.S. 1 .40 1 $ 19,875.00 $ 19,875.00 10 2 X 2 GRATE INLET EACH 1 1 I $ 900.00 S 900.00 11 4" P.V.C. DRAIN L.F. 84 84 $ 18.00 $ 1,512.00 WORK PERFORMED TO DATE: S 79,569.01 LESS 10% RETAINAGE: $ ' -0' SUBTOTAL: $ 79,569.01 LESS PREVIOUS PAYMENTS: S - 63,287.11 TOTAL DUE THIS ESTIMATE """""` $ 16,281.90 D & W COlf RACTOR C. DATE WAYNE CULVER, PRESIDb5� 41 INANCE CITY ENGINEER DATE CITY MANAGER CONTRACT SUMMARY ORIGINAL CONTRACT AMOUNT: $ 72,542.00 CHANGE ORDER #1: $ 7,027.01 FINAL CONTRACT AMOUNT: $ 79,569.01 DATE DATE