Ordinance No. 8,199980212 -10 ORDINANCE NO. 8199 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH WHITELAK, INC., ® FOR REROUTING THE 21- INCH.SANITARY SEWER ON GARTH ROAD PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FORTY - TWO THOUSAND TWO HUNDRED THIRTY -NINE AND 76/100 DOLLARS ($42,239.76); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: • That the City Council does hereby authorize Change Order No. 1 with Whitelak, Inc., for rerouting the 21 -inch sanitary sewer on Garth Road project. A copy of said change order is attached hereto, marked Exhibit 'A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FORTY -TWO THOUSAND TWO HUNDRED THIRTY -NINE AND 76/100 DOLLARS ($42,239.76) to Whitelak, Inc., for Change Order No. 1 for routing the 21 -inch sanitary sewer on Garth Road project. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated § '252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND NO /100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five percent (25 %) or decreased by more than twenty -five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12`h day of February, 1998. /i e !� PETE C. ALFARO, Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: ACIO RAMIRE ., City Attorney c:\MyDocuments% Council \Mectings\Fcbruary%ChangeOrd l Reroute2I InchGarth Road 12.doc • CHANGE ORDER NO. 1 Honorable Pete C. Alfaro, Mayor and City Council City of Baytown P. O. Box 424 Baytown, Texas 77522 February 11, 1998 Subject: Request for approval of rates on labor and/or materials and/or equipment. Contractor: Whitelak, Inc. Project: Construction of Rerouting of 21" Sanitary Sewer on Garth Road, Job No. 044 -52, Contract No. 1 Original Contract Amount: $252,176.00 Dear Mayor and City Council: Your approval is requested on the following items for the above referenced contract. It was necessary to remove and replace two deteriorated manholes, which had collapsed and blocked the sewer flow in the 15 -inch line. Emergency repair to sewer system at 1008 East Baker Road, which consisted of the removal and replacement of two existing manholes, 52 L.F. of eight -inch (8 ") sanitary sewer, and 13 L.F. of 15 -inch sanitary sewer. The attached letter dated February 11, 1998, together with supporting documentation will serve as the basis for cost of this additional work. Description Emergency Repair at 1008 East Baker Road Total Change Order No. 1 Original Contract Amount Adjusted Contract Amount Quantity Unit V\SERVER%OFFICE4vrrent proi\Change OrderSNO44521 Change Order t.do[ 1 L.S EXHIBIT A Each Cost $42,239.76 $42,239.76 $ 42,239.76 $252,176.00 $294,415.76 ® Change Order No. 1 February 11, 1998 044 -52, Contract No. 1 Page 2 Original Contract Time 60 Calendar Days Extension of Time This Change Order No. 1 7 Calendar Days Total Contract Time 67 Calendar Days Change Order No. 1 represents an increase of 16.75% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. SUBMITTED FOR APPROVAL: ACCEPTED: LANGFORD ENGINEERING, INC. WHITELAK, INC. as Johrf K. D is P.E. Pr sect Manager Date C�)-/.-) -Vie) APPROVED: CITY OF BAYTOWN : Date El Pete C. Alfaro Mayor C By: C. M. Whitehea , III Vice President Date 4 �iz�98 �T 2530 KNOBLOCK PK (713) 928.6411 Fax (713) 928-8600 WHITELAK, INC. UTILITY CONTRACTORS Houston, Texas 77023 LABOR: Week Ending 1 -21 -98 $1,414.68 1 -28 -98 6,345.72 TOTAL LABOR $7,760,40 EQUIPMENT: Cat. 322 Backhoe 1 Week @ 2,200.00 /Wk. $2,200.00 Cat. 926 Loader 1 Week @ 1,400.00 /Wk. 1,400.00 Truck, 2 Ton 7 Days @ 200.00 /Day 1,400.00 Truck, Pickup 7 Days @ 60.00 /Day 420.00 Air Comp. w /tools 7 Days @ 100.00 /Day 700.00 Chain Saw 7 Days @ 40.00 /Day 280.00 Cut Off Saw 7 Days @ 40.00 /Day 280.00 3" Centrifical Pump w /Hoses 7 Days @ 40.00 /Day 280.00 3" Diaphragm Pump w /Hoses 7 Days @ 40.00 /Day 280.00 Truck, Tractor Trailer 8 Hrs. @ 200.00 /Hr. 1,600,00 Small Tools 557 Man Hrs. @ 1.00 /Man Hr. 557.00 Barricades 557 Man Hrs. @ 1.00 /Man Hr. 557.00 Truck, 14 C.X. Dump 25k Hrs. @ 35.00 /Hr. 892.50 Steel Sheet Piling 1 L.S. @ 1,000.00 /Lump Sum 1,000.00 Fuel 496 Gal. @ 1.02 /Gal. 505.92 TOTAL EQUIPMENT 12,352.42 'MATERIALS: Highlands Stabilized Sand $1,991.15 Mega Sand 389.22 Gulf Coast Limestone, Inc. 216.71 Municipal Pipe 204.00 It " 56.00 " it 121.83 It 11 233.71 Olsen & Guerra 215.00 11 11 501.12 Houston Shell & Concrete 605.00 TOTAL MATERIALS 4,533.74 MISCELLANEOUS ITEMS: Manhole Builder - D. Barroso Contracting 1,625.00 v 2530 KNOBLOCK • • WHITELAK, INC. UTILITY CONTRACTORS Houston, Texas 77023 RECAP LABOR: EQUIPMENT INSURANCE /TAXES (52 %) MATERIALS MISCELLANEOUS TOTAL 15% OVERHEAD /PROFIT TOTAL AMOUNT DUE $ 7,760,40 12,352.42 10,458.67 4,533.74 1,625.00 PK (713) 928-6411 Fax (713) 928 -8600 $36,730.23 s 4nQ si SL.9 91Q 7h 2530 KNOBLOCK INVOICE WHITELAK, INC. UTILITY CONTRACTORS Houston, Texas 77023 To: Langford Engineering, Inc. 1080 West Sam Houston Parkway North Suite 200 Houston, Texas 77043 -5014 Attention: Mr. Tom Moody EMERGENCY REPAIR @ 1008 E. BAKER TOTAL AMOUNT DUE • 928 -6411 Date: February 11, 1998 No: 2192 Order No: $42,239.76 $42,239.76