Ordinance No. 8,144971125 -6. ORDINANCE NO. 8144 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 3 WITH J.T.B. SERVICES, INC., TO ADJUST THE FINAL UNIT BID QUANTITIES FOR THE AIRHART SIDEWALK AND KENTUCKY DRAINAGE PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF TWENTY -TWO THOUSAND THREE HUNDRED SIXTEEN AND 49/100 DOLLARS ($22,316.49) TO J.T.B. SERVICES, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, the City of Baytown contracted with J.T.B. Services, Inc., for the Airhart Sidewalk and Kentucky Drainage Project (the "Project "); and WHEREAS, a change order in the amount of $3,839.95 to adjust the final unit bid quantities is necessary to reflect the actual quantities used in the Project as well as the amount remaining due to J.T.B. Services, Inc.; and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by the City Engineer and as approved and adopted by the City Council have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, the City Engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the work and improvements and has heretofore issued his Certificate of Final Acceptance and has certified same to the City Council and recommended that it accept and receive said work and improvement as constructed and completed by Contractor; and WHEREAS, there remains due and owing to J.T.B. Services, Inc., the sum of TWENTY - TWO THOUSAND THREE HUNDRED SIXTEEN AND 49/100 DOLLARS ($22,316.49); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 3 with J.T.B. Services, Inc., to adjust the final unit bid quantities for the Airhart Sidewalk and Kentucky Drainage Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council hereby accepts and approves the above - described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all -of the terms and provisions of the aforesaid contract. 971125 -:6-a Section 4: That the Certificate of Final Acceptance heretofore issued by the City Engineer and certified to the City Council is hereby accepted and received. Section 5: That final payment to J.T.B. Services, Inc., in the amount TWENTY -TWO THOUSAND THREE HUNDRED SIXTEEN AND 49/100 DOLLARS ($22,316.49) is hereby authorized. Section 6: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 25`h day of November, 1997. PETE C. ALFAR , Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: G ACIO RAMIREZ, SR ty Attorney cAMyDocuments\Counci Weetings\N ovembe6MChangeOrderFina [Pay.25.doc • 2 CITY OF BAYTOWN CHANGE ORDER #3 Airhart Sidewalk and Kentucky Drainage Project P.O. No, 70738 11/19/97 The amount of work performed on this project came in under the adjusted contract amount from Change Order #2. The underrun for sidewalk was due to a change in alignment at Unidad Park. The hydromulch item was not needed since the existing grass was significantly reestablished by the end of the project. The stabilized sand was under since less was needed than originally estimated around the storm boxes. A grate inlet was added where an existing sewer pipe conflicted with the new storm sewer. Remaining differences were due to estimated quantities varying slightly from final measured quantities of work performed. The following is a summary of adjusted quantities after Change Order No. 2 and final quantities, the net difference being the amount of the change order. Item # Description Unit Orig. Quant. Final Quant. Quant. Diff. Cost Price Difference 1 4' -0" Concrete sidewalk SY 1930 9911.12 -18.88 29.19 551.11 2 15 -in RCP LF 60 56.00 -4.00 20.68 82.72 3 18 -in RCP LF 360 360.00 0.00 23.65 - 4 24 -in RCP LF 138 130.00 -8.00 29.70 237.60 5 48 -in RCP LF 4 4.00 0.00 215.37 - 6 TX 6' Box Storm LF 24 24.00 0.00 259.16 - 7 2'X 2' Grate Inlet EA 1 2.00 1.00 680.00 680.00 8 2' X 3' Grate Inlet EA 2 = 2.00 .0.00 736.32 - 9 6'X 5' Junction Box EA 0 0.00 0.00 3,087.84 - 10 Type 2 wheelchair ramp EA 4 4.00 0.00 575.00 - 11 Type 1 wheelchair ramp EA 1 1.00 0.00 775.00 - 12 Remove exist. Concrete, SY 341 341.00 0.00 30.01 - asphalt, and base 0.00 - 13 Concrete driveways SY 61 61.00 0.00 32.08 - 14 Concrete curb and gutter LF 930 891.70 -38.30 11.83 453.09) 15 Concrete va ey gutter SY 200 171.63 -28.37 44.95 1,275.23 16 HMAC surfacing TONS 26 29.66 3.66 89.46 327.42 17 Cement stabilized sand TONS 348 288.52 -59.48 18.79 1,117.63) 18 Clearinq and grubbing LS 1 1 1.00 0.00 7,558.20 - 19 Re rading LS 1 1.00 0.00 2,954.29 - 20 H dromulch LS 1 0.00 -1.00 1,150.00 1,150.00 21 Traffic Control LS 1 1.00 0.00 4,616.00 - 22 Grout LS 0 1.00 1.00 20.00 20.00 23 30 -in RCP LS 1 1.0ol 0.001 563.67 - Total Change Order #3 -$3,839.95 Off'' 1111' q J.T.B. Services, Inc. Date City Engfneer Date Finance Date City Manager Date ® Contract Summary: Original Contract Amount $133,986.62 Change Order #1 0,00 Change Order #2 EXHOT A 6,401.67 Change Order #3 - 3,839.95 Final Contract Amount $136,548.34 CITY OF BAYTOWN Project: Airhart Sidewalk and Kentucky Drainage Project Date: November 19, 1997 J.T.B. Services, Inc. P. O. No. 70738 9026 Lambright Houston, Texas 77075 Pay Estimate No. 4 and Final From: 911197 to 11/17/97 Contract Time: 50 Work Days + 10 days for Change Order 2 Total Time: Time Used: 66 Days Work Order Dated: 5119197 Item # Description knit Quant. This Estimate Quant. To Date Price Total 1 4' -0" Concrete sidewalk SY 50.66 1911.12 29.19 55,785.59 2 15 -in RCP LF 56.00 20.68 1,158.08 3 18 -in RCP LF 1 360.00 23.65 8,514.00 4 24 -in RCP LF 130.00 29.70 3,861.00 5 48 -in RCP LF 4.00 215.37 861.48 6 3'X 6' Box Storm LF 24.00 259.16 6,219.84 7 2'X 2' Grate Inlet EA 2.00 680.00 1,360.00 8 2'X 3' Grate Inlet EA 2.00 736.32 1,472.64 9 6'X 5' Junction Box EA 0.00 3,087.84 - 10 IType 2 wheelchair ramp EA 1.00 4.00 575.00 2,300.00 11 IType 1 wheelchair ramp EA 1.00 1 775.00 775.00 12 IRemove exist. Concrete, SY 341.00 30.01 10,233.41 asphalt, and base ¢_ - 13 Concrete driveways SY 61.00 32.08 1,956.88 14 Concrete curb and gutter LF 891.70 11.83 10,548.81 15 Concrete valley gutter SY 171.63 44.95 7,714.77 16 HMAC surfacing TONS 29.66 89.46 2,653.38 17 Cement stabilized sand TONS 288.52 18.79 5,421.29 18 Clearing and grubbing LS 1.00 7,558.20 7,558.20 19 Regrading LS 1.00 1.00 2,954.29 2,954.29 20 H dromulch LS 0.00 1,150.00 - 21 Traffic Control LS 1.00 1.00 4,616.00 4,616.00 22 Grout LS 1.00 20.00 20.00 23 30 -in RCP LS 1.00 563.67 563.67 Work Performed to Date $136,548.34 Less 0% Retainage 0.00 Subtotal $136,548.34 Less Previous Payments 114,231.85 Total Due This Estimate $22,316.49 J.T.B. Services, Inc. ate Finance Date Contract Summary: Original Contract Amount Change Order #1 Change Order #2 Change Order #3 Final Contract Amount City Engineer City Manager $133,986.62 0.00 6,401.67 - 3,839.95 $136,548.34 Date Date