Loading...
Ordinance No. 7,773960822 -L ORDINANCE NO. 7773 ® AN ORDINANCE AUTHORIZING CHANGE ORDER NOS. 7,13A, 18 AND 19 TO THE PUBLIC WORKS MUNICIPAL SERVICE CENTER CONSTRUCTION CONTRACT WITH DUROTECH, INC., WHICH RESULT IN A CREDIT TO THE CITY OF BAYTOWN, IN THE AMOUNT OF SIX THOUSAND TWO HUNDRED SEVENTY -SEVEN AND NO 1100 DOLLARS ($6,277.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** WHEREAS, Change Order Nos. 7, 13a, 18 and 19 are needed to the Municipal Service Center construction contract; and WHEREAS, said change orders will result in a credit to the City of Baytown in the amount of SIX THOUSAND TWO HUNDRED SEVENTY -SEVEN AND NO /100 DOLLARS ($6,277.00); NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section l: That the City Council does hereby authorize Change Order No. 7 with Durotech, Inc., for the Public Works Municipal Service Center construction contract. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes a credit of TWENTY THOUSAND SIX HUNDRED THIRTY -NINE AND NO 1100 DOLLARS ($20,639.00) to the City of Baytown for Change Order No. 7 for the Public Works Municipal Service Center construction contract. Section 3: That the City Council does hereby authorize Change Order No. 13a with Durotech, Inc., for the Public Works Municipal Service Center construction contract. A copy of said change order is attached hereto, marked Exhibit "B," and made a part hereof for all intents and purposes. Section 4: That the City Council of the City of Baytown hereby authorizes the payment of ONE THOUSAND TWO HUNDRED EIGHTY -SIX AND NO 1100 DOLLARS ($1,286.00) to Durotech, Inc., for Change Order No. 13a for the Public Works Municipal Service Center construction contract. Section 5: That the City Council does hereby authorize Change Order No. 18 with Durotech, Inc., for the Public Works Municipal Service Center construction contract. A copy of said change order is attached hereto, marked Exhibit "C," and made a part hereof for all intents and purposes. Section 6: That the City Council of the City of Baytown hereby authorizes the payment of FIVE THOUSAND NINE HUNDRED THREE AND NO /100 DOLLARS ($5,903.00) to ® Durotech, Inc., for Change Order No. 18 for the Public Works Municipal Service Center construction contract. 960822 -1a ® Section 7: That the City Council does hereby authorize Change Order No. 19 with Durotech, Inc., for the Public Works Municipal Service Center construction contract. A copy of said change order is attached hereto, marked Exhibit "D," and made a part hereof for all intents and purposes. Section 8: That the City Council of the City of Baytown hereby authorizes the payment of SEVEN THOUSAND ONE HUNDRED SEVENTY -THREE AND NO /100 DOLLARS ($7,173.00) to Durotech, Inc., for Change Order No. 19 for the Public Works Municipal Service Center construction contract. Section 9: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 22nd day of August, 1996. ATTEST: EILEEN P.- HALL. City Clerk APPROVED AS TO FORM: 9 �/�� �.� O . . ® c:\ council \meetings \august \durotech.22 2 PETE C. ALFARO, Mayor Design: E:',NE r�JV(N1 T SGOLDIREPORT�DTCPR.FPT ®DUROTECH INC. GENERAL CONTRACTOR 11931 WICKCHESTER, SUITE 300 HCUSQTOAl, Tc = 77• nom: PH: 7131668 -6892 FAX: 7131496 -3637 Systern Date: 8/20196 'TO: FERRO -SAYLORS, INC. 1880 DAIRY ASHFORD, #608 HOUSTON , TX 77070 ATTN: HAROLD L. BRENT PROPOSAL FOR CHANGE ORDER Proposal No: 7 Your Job Number. 95243 Name: BAYTOWN PUBLIC WORKS Location: 2321 MARKET STREET Our Job Number: 95 -243 Date: 8120196 We are offering the following Proposal for a Change Order on the above named project. ption of hd2dD= 'L DEDUCT FOR LIMESTONE BASE Q OVERPASS Z0,£3S.fl0- 20,539.00- Totae Cwt of Proposed Change (subtract) $20,639.00- Calarider days extension of time required: Priceigood thru: Acceptance of this proposal is not to delay project closeout and funding. The prompt approval or *Ocficn of this proposal is requested so that materials may be purchased if the change required and can be incorporated Into the scope of the worm. Signatures in the spaces provided below will indicate your Intent to issue a Change Order to the Contract amount shown above. i y Architect Owner: DUROTECH INC. GENERAL CONTRACTOR By: �l l��� WAS Date: DUROTECH INC. GENERAL CONTRACTOR, 11931 WEckchester, #300, Houston, TX. 77043 EXHIBIT A Design: E:1NE T WINITSGOLD\R-1=- '0R-50TCPR -RP i System Date: 8/19/96 DuRDTECH INC. GENERAL CONTFLA- CTOR TO: FERRO- SAYLORS, INC, 'I1S3 i 'JuICKCHESTER, 1880 DAIRY ASHFORD, #SO& HOUSTON, TEXAS 77043 HOUSTON:, TX 77070 PH: 7131553 -6892 FAX: 7 :31 ATTN: HAROLD L. BRENT PROPOSAL FOR CHANGE ORDER Proposal No: 13-A Y06r Job Number. 95243 :'r Name: BAYTOWN PUBLIC WORKS Location: 2321 MARKET STREET Oui job Number: 95 -243 Date: '8/19196 We offering the following Proposal for a Change Order on the above named project- i c rMon of cha-n= - ADD FOR ROOF INTAKE COMBUSTION AIR IN ADMIN BLDG. 1,286.00 1,286.40 Tort Coat of Proposed Change (add) 51,286.00 Caia r.days extension of time required: -� n pood thru: Ache��nce of this proposal is not to defy project closeout and funding. The Orompt approval or re On of this proposal is requested so that materials may be purchased if the charge required en cyan he Incorporated into the scope of the work. Sl' riatures in the spaces provided below will ind sate your intent to issue a Change Order to the Contract amount shown above. ' DUROTECH INC. GENERAL CONTRACTOR BY: Ataroved - Ar Date:_ 8 iy gG O nd . Date: �n DIJRDTECH INC. GENERAL CONTRACTOR, 11931 Wickchester, #300, Houston, TX. 77043 EXHIBIT $ Cosign: E:,NETVViNiTSGOL DLREPOR- ROTCPR.RPT System Date: 8102196 .': ")LIROT=CH INC. GENERAL CONTRACTOR TO: FERRO- SAYLORS, INC. 11931 WICKCHESTER, SUITE 304 1880 DAIRY ASHFORD, #50S HOUSTON, TEXAS 77043 HOUSTON , TX 77070 PH: 71315W -8892 FAX: 7131496 -5637 ATTN: HAROLD L. BRENT PROPOSAL FOR CHANGE ORDER Proposal No: 18 Your Job Number. 95243 Name: BAYTOWN PUBLIC WORKS Location: 2321 MARKET STREET Our Job Number: 95-243 Date: 7125/96 We are offering the following Proposal for a Change Order on the above named project. Description of change: 1 ADD FOR FIRE DAMPERS Q ADMIN BLDG 5,903.00 SEE ATTACHED BREAKDOWN. -Total Cost of Proposed Change (add) $5,903,00 5,903.00 Calander days extension of time required: Price good thru: Acceptance of this proposal is not to delay project closeout and funding. The prompt approval or rejection of this proposal is requested so that materials may be purchased if the change required and can be incorporated into the scope of the work. Signatures in the spaces provided below will indicate your Intent to issue a Change Order to the Contract amount shown above. r� i U]" MAIN Owner. DUROTECH INC. GENERAL CONTRACTOR By: Date: DUROTECH INC. GENERAL CONTRACTOR, 11931 V ickchester, #300, Houston, TX. 77043 • ExHierr c Design: E:I NETWIN\TSGOLD1REPORTI.DTCPR.RPT System Date: 8/19196 OUROT2CH INC. %ENERAL CONTRACTOR 11,831 Y111t KCHES TER, SUITE 300 HOUSTON, TEYAS 77043 PSI: 7131558 -631?2 FAX: 7131496 -5637 TO: FERRO- SAYLORS, INC. 1880 DAIRY ASHFORD, #505 HOUSTON , TX 77070 ATTN-. HAROLD L. 13RENT PROPOSAL FOR CHANGE ORDER Proposal No: 19 Your Job Number. 95243 Name: BAYTOWN PUBLIC WORKS Location: 2321 MARKET STREET Our job Number: 95-243 Date: 8102196 We are offering the following Proposal for a Change Order on the above named project.. L2as&ipt1o0 of changr. ADD FOR STRUCT. BEAM P_ VECHICLE MAINT. BLDG_ Tate! Coat of Proposed Change (add) Calarider days extension of time required: Price good thru: $7,173.00 7,173.00 7,173.00 Acceptance of this proposal is not to delay project closeout and funding. The prompt approval or resection of this proposal is requested so that materials may be purchased if the change required and can be incorporated into the scope of the work. Signatures in the spaces provided below will indicate your intent to issue a Change Order to the Contract amount shown above. DUROTECH iNC. GENERAL CONTRACTOR By: Archi Owner: Date: DUROTECH INC. GENERAL CONTRACTOR. 11931 Wickchester, #300, Houston, TX. 77043 EXHIBIT D