Loading...
Ordinance No. 7,736960627 -3 ORDINANCE NO. 7736 AN ORDINANCE REPEALING ORDINANCE NO. 7646 PASSED ON MARCH 14, 1996; AUTHORIZING CHANGE ORDER NOS. 10, 11, AND 12 WITH DUROTECH, INC., FOR THE MUNICIPAL SERVICE CENTER PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF EIGHT THOUSAND THREE HUNDRED FORTY -ONE AND NO 1100 DOLLARS ($8,341.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. WHEREAS, on March 14, 1996, by Ordinance No. 7646, the City Council authorized Change Order No. 5 in the amount of $40,000.00 with Durotech, Inc., for the Municipal Service Center Project, said change order being for casing foundation piers; and WHEREAS, it was determined that due to favorable ground conditions the casing foundation piers were not needed; and WHEREAS, the funds approved under Change Order No. 5 are no longer needed for said Change Order No. 5; NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby repeal Ordinance No. 7646 passed on March 14, 1996. Section 2: That the City Council does hereby authorize Change Order Nos. 10, 11, and 12 with Durotech, Inc., for the Municipal Service Center project. A copy of said change orders are attached hereto, marked Exhibit "A," "B," and "C" and made a part hereof for all intents and purposes. Section 3: That the City Council of the City of Baytown hereby authorizes the payment of EIGHT THOUSAND THREE HUNDRED FORTY -ONE AND NO /100 DOLLARS ($8,341.00) to Durotech, Inc., for Change Order Nos. 10, 11, and 12 for the Municipal Service Center project. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 27th day of June, 1996. M UEL SCO Wf RIAS, Mayor Pro Tempore ATTEST: EILEEN P. HALL, City Clerk APPROVED AS TO FORM: j4hqACIO RAMIREZ, SR. ity Attorney cAcounci I\meetingsljune \ n sc. 27 r 960627 -3a MAY -15 -1995 1?��71 Ut.1t<U I =Uri Jrqu. GENERAL CONTRACTOR 11931 WICKCHESTER, STE 300 HOUSTON, TEXAS 77043 0 B FILE Sr 1 JOSMSTRIG24CPRICP RMSTR As Proposal Number. Your Job Number. Our Job Number. 10 93005 95 -243 DUROTECH INC. 1965637 P. 0_2 TO: FERRO - SAYLORS, INC 1880 DAIRY ASHFORD RD, SUITE 505 HOUSTON. TEXAS 77070 ATTN: HAROLD BRENT PROPOSAL FOR CHANGE ORDER Name: Baytown Public Works Location: Baytown, Texas Date: 16- May -96 are offering the following Proposal for a Change Order on the above named project. D FOR UPGRADE TO FORMICA LAMINATE ON TOILET PARTITIONS. ADD S 11020.00 FEE $ 153.00 TOTAL S 1,173.00 Per FS] directive, we have incorporated this change into the order. There may be a delay in delivery due the time delay to make this decision. Total Cost of Proposed Change (add) (deduct): Total add: $ 1,173.00 Calendar days extension of time requested: Total Days The prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change can be incorporated into the scope of the work. Signatures in the spaces provided below will indicate your intent to Issue a Change Order to the Contract in the amount shown above. DUROTECH INC. GEN_TcR AL Z CTOR 8y: Mark oward, Project Ma alter Change Approved by Architect: /< DATE: S 6 ;�q .........� Change Approved by Owner. i� DATE: EXHIBIT A MAY- 16-1996 12:02 DURCTECH INC. 4965 E 7 P. cl-- FILE NAME: EXCEUEST /COSTANYICA1195 /DGPUBWKS.XLS i ESTIMATOR: i MARK HOWARD _ J PROJECT NAME:PUBLIC WORKS SER- CHANGE PROPOSAL COST SHEET i , 5/16r96 I LABOR I LABOR I MATERIAL i MA rL TOTAL I GROUP DESCRIPTION I QUAN I UNIT . UNIT E TOTAL UNlT TOTAL COSTS j TOTAL 70 !CPR 110 add tm qtM a laminate 0 toilet Partitions TOILET PARTITIONS 41.00 SU6 avOTE i ILS I ! 1020.001 1020, 5024; 1020 1 SUBTOTAL ; I I i I I 51.0201 31.0201 51,020 !OVERHEAD & FEE j 0.151 ° /a I j 1420.04 153! 153j i GRAND TOTAL I I i $7,173 i S1,173 ! $1,173 i Ii E FINAL QUOTE I $1,173 • TnT01 P 613 F)UROTECH INC.. -NERAL CONTRACTOR 11931 WICKCHESTER, STE 300 HOUSTON, TEXAS 77043 FEifEUJOBFILES11 J0BMSTRIG20CPRICPRMSTR.XLS Proposal Number: 11 Your Job Number: 93005 Our Job Number: 95 -243 TO: FERRO - SAYLORS, INC 1880 DAIRY ASHFORD RD. SUITE 505 HOUSTON, TEXAS 77070 ATTN: HAROLD BRENT PROPOSAL FOR CHANGE ORDER Name: Baytown Public Works Location: Baytown, Texas Date: 31- May -96 We are offering the following Proposal for a Change Order on the above named project. PER RFI 31 WE PROPOSE THE FOLLOWING COST FOR THE STIFF BACK REPAIR AT THE PARTS 1 STORAGE BLDG. SEE ATTACHED COST BREAKDOWN & DETAIL. LABOR MATERIAL INSURANCE & BOND FEE TOTAL NEED RESPONSE BY 6-4 -96 Total Cost of Proposed Change (add) (deduct): $ 1,200.00 $ 1,721.00 $ 454.00 $ 500.00 $ 3,875.00 Total add: $ 3,875.00 Calendar days extension of time requested: Total Days The prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change can be incorporated into the scope of the work. Signatures in the spaces provided below will indicate your intent to issue a Change Order to the Contract in the amount shown above. DUROTECH INC. GE R 0 TRACTOR By: Howard, Project Manager Change Approved by Architect: A-4 Oc. DATE: Change Approved by Owner: • DATE: EXHIBIT B 00ROTECH INC. GENERAL CONTRACTORS (1996) JEST. NAME: DGPUBWKS.XLS '.LE NAME: EXCEL / EST /COSTANY /CA1195 /DGPUBWKS.XLS ' 1ESTIMATOR: IMARK HOWARD PROJECT NAME: PUBLIC WORKS SER. ICHANGE PROPOSAL COST SHEET i 5/31196 1 LABOR I LABOR MATERIAL MAT L TOTAL GROUP I DESCRIPTION QUAN I UNIT I UNIT TOTAL I UNIT TOTAL COSTS TOTAL # .CPR W 11 RFI 0 31 PARTS STORAGE STIFF BACK REPAtRI j REPAIR 1 SHORING BRACING 10 EA I I 25.00 2501 2501 250 SCAFFOLDING ! 1:EA. 1 200.00 2001 2001 200 LIFTS 1 EA. i 300.001 3001 3001 300 FRAMING i 1 .2X6 36;LF 1 4.18 1501 1501 150 LABOR- 3 MEN 5 DAYS @ $240.00 PER DAY 12001 I 1 12001 1200 MISC. BOLTS % 50: EA 2.00 1001 1001 100 STEEL COLUMNS & BEAMS 21 EA. 11 1 360.501 7211 721 721 SUBTOTAL $1,200 1 51,721 1 $2,921 1 $2,921 IINSURANCE (.0022) I 1ILS 1 2.641 31 3.791 41 71 1LABOR BURDEN 1 0.341% jOVERHEAD & FEE 0.151% !BOND 1 0.011% 1 1 1610.641 1 1852.241 1 4081 2421 191 1725.271 1984.061 1 2591 201 1 408 5001 381 GRAND TOTAL I i I $1,871 1 1 $2,004 1 $3,875 1 $3,875 • f DUROT�CH INC. GENERAL-CONTRACTOR 11931 WICKCHESTER, STE 300 HOUSTON, TEXAS 77043 FI EWOBFILES11J0BMSTR1G20CPR /CPRMSTRYLS Proposal Number: Your Job Number: Our Job Number: 12 93005 95 -243 TO: FERRO - SAYI_ORS, INC 1880 DAIRY ASHFORD RD. SUITE 505 HOUSTON, TEXAS 77070 ATTN: HAROLD BRENT PROPOSAL FOR CHANGE ORDER Name: Baytown Public Works Location: Baytown, Texas Date: 31- May -96 We are offering the following Proposal for a Change Order on the above named project. PER RFI 5 WE PROPOSE THE FOLLOWING COST TO INSTALL SUPPORT ANGLE FOR THE ROOF DECK AT THE PARTS f STORAGE BLDG. SEE ATTACHED COST BREAKDOWN d DETAIL. LABOR MATERIAL INSURANCE & BOND FEE TOTAL NEED RESPONSE BY 6-4 -96 Total Cost of Proposed Change (add) (deduct): $ 740.00 $ 1,838.00 $ 290.00 $ 425.00 $ 3,293.00 Total add: $ 3,293.00 Calendar days extension of time requested: Total Days The prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change can be incorporated into the scope of the work. Signatures in the spaces provided below will indicate your intent to issue a Change Order to the Contract in the amount shown above. DUROTECHINC. EN R ON RACTOR By: / � '^'1 Howard, Project Manager Change Approved by Architect: DATE: 6 Change Approved by Owner: • DATE: EXHIBIT C DUFtOTECH INC. GENERAL CONTRACTORS (1996) 1 ZEST. NAME: DGPUBWKS.XLS j .FILE NAME: EXCEL/EST /COSTANY /CA1195 /DGPUBWKS.XLS 1ESTIMATOR: IMARK HOWARD � PROJECT NAME:PUBLIC WORKS SER. !CHANGE PROPOSAL COST SHEET I I, 611196 I i I (LABOR I LABOR j MATERIAL j MAT'L j TOTAL i GROUP ! DESCRIPTION ; QUAN I UNIT 1 UNIT TOTAL I UNIT j TOTAL j COSTS j TOTAL # !CPR 0 12 RFI 0 5 PARTS STORAGE INSTALL ANGLE AT ROOF DECK !LABOR- 3 MEN 3 DAYS @ S240.00 PER DAY 7401 7401 740 (EPDXY ANCHORS 1ILS j 500.00 SOOT 5001 500 I i STEEL ANGLES3 "X5 "X714" 1701LF 1 I 7.871 13381 1338] 1338 j SUBTOTAL j 5740 j S1,8381 $2,5781 S2,578 !INSURANCE (.0022) 11 LS 1 1.631 21 4.041 41 61 ILABOR BURDEN ! 0.341% I 2521 I 2521 10VERHEAD & FEE j 0.151% 1 993.231 1491 1841.941 2761 4251 !BOND 0.01 a% 1142.211 iii 2118.231 211 331 1 GRAND TOTAL 1 j j 1 $1,1541 1 $2,1391 $3,293 j $3,293 •