Ordinance No. 7,630960208 -10
ORDINANCE NO. 7630
® AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH PALTON
CONSTRUCTION FOR HOUSING REHABILITATION PROJECT NO. 95 -17
AT 501 LIVE OAK, BAYTOWN; AUTHORIZING PAYMENT BY THE CITY OF
BAYTOWN, THE SUM OF THREE THOUSAND SIX HUNDRED SEVENTY -
EIGHT AND 75/100 DOLLARS ($3,678.75); AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 1 with Palton
Construction for Housing Rehabilitation Project No. 95 -17 at 501 Live Oak, Baytown. A copy of
said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and
purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes payment up
to the amount of THREE THOUSAND SIX HUNDRED SEVENTY -EIGHT AND 75 /100
DOLLARS ($3,678.75) to Palton Construction for Change Order No. 1 for Housing Rehabilitation
Project No. 95 -17 at 501 Live Oak, Baytown.
Section 3: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City
of Baytown this the 8th day of February, 1996.
/,� e,
PETE C. ALFAR , Mayor
ATTEST:
e"i�_
EILEEN P. HALL, City Clerk
APPROVED AS TO FORM:
dt&ACIO RAMIREZ, S City Attorney
cacounciAmeetingslfebruaryll iveoak.8th
0 CHANGE ORDER #95 -17 -01
Original Contract Price: $13,991.25
HomeownereVetress Johnson • •' ' •n Const W i
ADDRESS: - •.. PROJECT
HOMEOWNER
COMMUNITY DEVELOPMENT OFFICER
CONTRACTOR
DATE
The following deletions will be made to the original work write -up:
1.
Delete
base molding in living room.
$ 50.00
2.
Delete
linen closet door.
$ 60.00
3.
Delete
bathroom door.
$ 35.00
4.
Delete
bedroom #1 door.
$ 30.00
5.
Delete
bedroom 41 closet door.
$ 70.00
6.
Delete
bedroom #2 door.
$ 70.00
7.
Delete
bedroom #2 closet door.
$ 70.00
8.
Delete
new hot water heater.
$300.00
9.
Delete
new gas lines.
$400.00
TOTAL DELETION:
$1,085.00
EXHIBIT A
® The following additions will be made to the original work write up:
1. Replace termite damage on living room floor. $ 75.00
2. Replace termite damage on dining room floor.
10. Install new sills, front and back due to termite damage.
Install new corner post, bottom plate, and additional studs.
Involves extensive labor. $1669.00
11. Clean screen for ventilation and bird proof. $150.00
12. Install additional outlet in bedrooms and in dining
roomInstall GFI on exterior. $349.75
IL-1
Install
3/8" plywood. Install finish floor. $350.00
3.
Repair
kitchen floor near base cabinets.
Install
3/8" plywood. Install finish floor.
$350.00
4.
Install
finish floor in bath.
$150.00
5.
Repair
sheetrock in bedroom #1 closet.
$150.00
6.
Repair
sheetrock in bedroom #2 closet.
$150.00
7.
Install
additional siding for termite damage
exterior.
$750.00
B.
Install
new water lines.
$400.00
9.
Install
fiberglass tub surround.
$220.00
10. Install new sills, front and back due to termite damage.
Install new corner post, bottom plate, and additional studs.
Involves extensive labor. $1669.00
11. Clean screen for ventilation and bird proof. $150.00
12. Install additional outlet in bedrooms and in dining
roomInstall GFI on exterior. $349.75
IL-1
•
APPROVED:
TOTAL COST OF ADDITION: $4,763.75
TOTAL COST OF CHANGE ORDER: $3,678.75
Bobby Rountree, City Manager