Ordinance No. 7,586951214 -10
ORDINANCE NO. 7586
AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH
INVESTMENT GROUP FOR HOUSING REHABILITATION PROJECT 95 -15
AT-1209 TURNER, BAYTOWN; AUTHORIZING PAYMENT BY THE CITY
OF BAYTOWN, THE SUM OF FOUR THOUSAND SEVEN HUNDRED THREE
AND NO 1100 DOLLARS ($4,703.00); MAKING OTHER PROVISIONS
RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize Change
Order No. 1 with Investment Group for Housing Rehabilitation
Project 95 -15 at 1209 Turner, Baytown. A copy of said change order
is attached hereto, marked Exhibit "A," and made a part hereof for
all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby
authorizes payment up to the amount of FOUR THOUSAND SEVEN HUNDRED
THREE AND NO /100 DOLLARS ($4, 703.00) to Investment Group for Change
Order No. 1 for Housing Rehabilitation Project 95 -15 at 1209
Turner, Baytown.
Section 3: That pursuant to the provisions of Texas Local
Government Code Annotated § 252.048, the City Manager is hereby
granted general authority to approve any change order involving a
decrease or an increase in costs of FIVE THOUSAND AND N01100
DOLLARS ($5,000.00) or less, subject to the provision that the
original contract price may not be increased by more than ten
percent (100) or decreased by more than twenty -five percent (25a)
without the consent of the contractor to such decrease.
Section 4: This ordinance shall take effect immediately from
and after its passage by the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown this the 14th day of December,
1995.
/9,?,— ef- 4v:��
PETE C. ALFAIZO, Mayor
ATTEST:
EILEEN P. HALf,, City Clerk
0
APPROVED AS TO FORM:
IG CIO RAMIREZ, S City Attorney
legal /cau ncil /decembed 12- 14- 95chORD ER 1209tu rner
0
951214 -10a
•
CHANGE ORDER #95 -15 -01
Original Contract Price: $18,888.00
HOMEOWNER
CONTRACTOR:Investment Group
PROJECT NUMBER: 95 -15
CONTRACTOR
COMMUNITY DEVELOPMENT OFFICER DATE
The following additions will be made to the original work write -up:
1. This structure was scheduled for rehabilitation. After
initial exposure, it was apparent there was extensive termite
damage, extreme foundation problems, and other structural
problems which rendered it economically unfeasible to
rehabilitate. Therefore, reconstruction is the only feasible
alternative.
Please see the attached scope of work for the
reconstruction of 1209 Turner.
Total-Amount of Change Order - $4,703.00
EXHIBIT A
SCOPE OF WORK
FOR RECONSTRUCTION OF
1209 TURNER
Foundation:
a. Install new sills and floor joist for entire foundation. Raise and level foundation. Install
additional blocks and beams entire length of structure. Install termite caps.
Roof:
a. Install new framework, decking, felt paper 30 #, drip edge and shingles over entire
structure.
Windows:
a. Install new aluminum frame windows complete with screens.
Siding:
a. Install medium density hardboard exterior siding over entire structure.
b. Install necessary trim (corner boards, bird board, door and window facings).
C. Install two attic vents.
Exterior paint:
a. Use sealant as primer coat.
b. Paint entire exterior of structure.
Electrical:
a. Install new electric service (breaker box, meter loop and weather head).
b. Install new wiring throughout entire structure.
C. Install cover plates for all switches and outlets.
d. Install ceiling fan with light kit in living room and each bedroom each with wall switch.
•
Plumbing:
a. Install new fresh water lines throughout structure and to water meter.
b. Install two hose bibs.
C. Install pipe insulation on all pipes under structure.
d. Install new waste water lines under structure. Install clean out and wast water line to city
main.
e. Install new gas lines throughout structure and to gas meter.
INTERIOR
Living room:
a. Front entry - install pre -hung metal door complete with security knob, dead bolt lock,
peephole, door stop, interior facing.
b. Front entry - install aluminum storm door complete with screen and hardware.
C. Front entry - install treated wood porch, steps, and handrail.
d. Front entry - install exterior light fixture with interior wall switch.
e. Install new ceiling joists and wall studs.
f. Install sheetrock on walls and ceiling, tape, float and texture.
g. Install carpet pad and carpet.
h. Install baseboard.
i. Paint walls, ceiling and all trim.
•
Bedroom #1:
a. Install new ceiling joists, rafters, and wall studs.
b. Install stud walls to form closet.
C. Closet - install supports, hanger rod and shelf.
d. Closet - install passage door, knob, door stop, and facings.
e. Install sheetrock on walls and ceiling, tape, float, and texture.
f. Install carpet pad and carpet.
g. Install baseboard.
h. Paint walls, ceiling and all trim.
j. Install pare -hung door complete with facings, door knob and door stop.
Bedroom #2:
a. Install new ceiling joists, rafters, and wall studs.
b. Install stud walls to form closet.
C. Closet - install supports, hanger rod, and shelf.
d. Closet - install passage door, knob, door stop, and facings.
e. Install sheetrock on walls ceiling, tape, float, and texture.
f. Install carpet pad and carpet.
g. Install baseboard.
h. Paint walls, ceiling and all trim.
i. Install light fixture with wall switch.
j. Install hollow core door complete with facings, door knob, and door stop.
0
isHall:
a. Install stud walls, ceiling joists, and rafters.
b. Install sheetrock on walls and ceiling, tape, float, and texture.
C. Install carpet pad and carpet.
d. Install baseboard.
e. Install light fixture with wall switch.
f. Install attic stairway with frame.
g. Install smoke detector.
h, Paint walls, ceiling and all trim.
Bathroom:
a. Install ceiling joists, rafters, and wall studs.
b. Install sheetrock on walls and ceiling, tape, float, and texture.
C. Install vinyl floor covering.
d. Install base and shoe molding.
e. Paint walls, ceiling and all trim.
f. Install hollow core door complete with facing and privacy hardware.
g. Install vanity, vanity top, pop -up, supply lines, cut -offs, faucets, drain line and p -trap, vent
with roof jack.
h. Install toilet, supply line, cut -off, drain line, vent, wax ring, and seat.
i. Install tub and shower, supply lines, faucets, shower head, drain line, vent, shower rod.
j. Install medicine cabinet with mirror above vanity.
k. Install light fixture with wall switch.
•
Attic insulation:
a. Over entire living area, install R -19 attic insulation.
•
Kitchen:
a.
Back entry - install pre -hung metal door complete with security knob, deadbolt lock
peephole, door stop, interior facing.
b.
Back entry - install aluminum storm door complete with screen and hardware.
C'
Back entry - install treated wood steps and handrail.
d.
Back entry - install exterior light fixture with interior wall switch.
e.
Install new ceiling joists, rafters, and wall studs.
f.
Install sheetrock on walls and ceiling, tape, float, and texture.
g.
Install new upper and lower kitchen cabinets, pre -fab counter top, double basin stainless
steel sink, supply sines, cut -offs, drain line, p -trap and vent with roof jack, stain cabinets.
h.
Install gas line and connection for stove.
i.
Install vinyl floor covering.
J.
Install shoe/base molding.
k.
Paint walls, ceiling and all trim.
1.
Install ductless vent hood.
M.
Install light fixture with wall switch.
n.
Install connections, drain line and p -trap for washer.
o.
Install electrical outlet for dryer.
P.
Install gas jet for dryer.
Attic insulation:
a. Over entire living area, install R -19 attic insulation.
•
Hvac:
® a. Install central heat (complete), including registers, boxes, ductwork, return air and chase,
heater wiring, thermostat.
•