Loading...
Ordinance No. 7,374950810 -10 ORDINANCE NO. 7374 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 3 WITH FIREMEN CONSTRUCTION CO., INC., FOR THE STERLING MUNICIPAL LIBRARY ADDITION; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF TEN THOUSAND FOUR HUNDRED FIFTY -ONE AND NO /100--DOLLARS ($10,451.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 3 with Firemen Construction Co., Inc., for the Sterling Municipal Library Addition. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of TEN THOUSAND FOUR HUNDRED FIFTY -ONE AND N01100 DOLLARS ($10,451.00) to Firemen Construction Co., Inc., for Change Order No. 3 for the Sterling Municipal Library Addition. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated 9 252.04B, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (250) or' decreased by more than twenty -five (250) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 10th day of August, 1995. PETE C. ALFARO, Mayor ATTEST: r ® EILEEN P..HALL, City Clerk 17 APPROVED AS TO FORM: C4- ;",-- ) 4?-- - - /- 5;2g I qty Attorney legal/cou nc illaugus U8- 10 -95chO R DER[ ib rary • 950810 -10a 0, CHANGE O%VN1F t ❑ ORDER ' ❑ (:ONI'KA( (:011'I'Et:1(:'I'(lt ❑ rl r.I.I) 0 AIA U(X:liA1FN7 -C;. UI OT IER ❑ PROJECT: (manic, address) TO CONTRACTM: (namc, address) STERLING MUNICIPAL LIBRARY ADDITION City of Baytown Firement Const. Co., Inc. P. 0. Box 96647 Houston, Texas 77213 the (:untraci is changcd as follows: SEE ATTACHED SHEETS. CHANGi ORDER NUNIBIT: Three (3) MIT: July 31, 1995 AMA TI ?C T'S PRO.11- T NO: 104 -91 CONTKACT DATFI: June 9, 1994 CONTRACT FOR: $1,570,000.00 Not valid until signed by the Owner, Architect and Contractor. 'I"hc origin-,d (Corntraci Slim) (tKKXMXKXpi%ps]s>:uxxxK0LTwxs ........................ 1 ,570, 000.00 pct cllangc by lxcviutlsh• authurizct.t Ch:mgc Orticrs ............................... ; 17,328.00 I he ( Contract Sum) (( Kx ]i74x3G1CQIi444r1Xx]ClUx7�Ixiur to this i;lrut}c Onlcr was .......... 1,587,328.00 -i'hc (C)ntract 5u1111) xAQxiCo0pcwill Ix• (incrcau•cl)};1MXXD0CDf 00tX ?iixxhN, this (:hv1l;c Orcicr in the amount of ............................ 5 10,451.00 The new (Contract tium inrlulGnp this Ch:ngc OrCh-r will he .. S 1,597 , 779.00 Flic C(nlract Timc will he (incr(::Lscd) )y thirty ( 30 ) d;Il S I'hc date ()I SLlhSlJI1Ii:ll Ctnihlctio n as or the date of INS Change Orda Ihcrcfurc is July 1, 1995 Nu'1'1: Thi> sunmur%, kh-cs nt-t rcticrl in the Gmtrarl Sum, t:nnlracl 'fine la• (;u.11•autt'cil M:1\i111lun Plict %%I(il'h h:n'c IKvl( aulhuri'il(I i,% Gms(nl m-n (Amngc Oirccikc. William T. Burge, AIA A 1(l .I 11'1'I:(:T 490-1_Gar_th RQad_ ali,lrl:,. Bay w.) 7521 1sr , I)ATa; Jul 31, 1995 Firemen Const. Co., Inc. o :( 1 \ "I Itat ft tl( Atlllrl >. Houston, Texas 77213 City of Baytown, Texas ( 1V NI:K P. 0.- Box 424 a�l(Irr.. Baymm, Texas 77522 1IY ItV DATE , Ju1y 31,_1995 _ I,:tfl; July 31, 1995 • LUCAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT G701 • CHA \'(',I? (W01'k • P)M- I•:HT1( ).N • AIA` • (1-) 19.1' '1111 - A.tuan( AN IV, ITI'IA+ (W AW.1111"F( I:\• 1'44 \FIX iul;K AXE. `,a., ua.nl�(.r(1�. Il.(:. (..w, G701 -1987 EXHIBIT A WARNING: Unlicensed photocopying violates U.S. copyright 1zv.• nnet 9:!7incl F::q �cn Minn. G STERLING MUNICIPAL LIBRARY ADDITIONS Change Order No. 3 July 31, 1995 CHANGE ORDER ADDITIONS: 1. Add 2 each 12" x 12" one way mirror door lights at doors between workroom and desk. a. Glass and Glazing b. Wood Doors Sub -Total C. General Contractor OH and Profit at 6% 2. Provide 15" t cabinet with door and shelf to match existing to complete base cabinet assembly at Pantry 110. a. McIntosh Cabinets, Inc. b. General Contractor 6% Overhead and Profit 3. Provide additional names to plague. a. St. George Sign Co. b. General Contractor 6% Overhead and Profit 4. Replacement of existing electrical receptacles at existing floor outlets. a. Electrical Materials b. Electrical Labor Sub -Total C. Sub Overhead and Profit at 6% Sub -Total d. General Contractor Overhead and Profit at 6% 5. Omit (re- painting wall after move -in at workroom to be paid to contractor outside of contract - $148.40). 6. Modify toilet partition door to clear cabinet edge and still maintain 32" clear opetung to stall for handicap access. $ 100.00 170.00 270.00 16.20 35.00 2.10 298.50 818.98 1,117.48 67.05 1,184.53 7,07 $ 286.00 212.00 37.00 1,256.00 M3 :7 STERLING MUNICIPAL LIBRARY ADDITIONS. Change Order No. 3 July 31, 1995 a. Toilet Partitions b. General Contractor Overhead and Profit at 6% 7. Replace existing water closet at Women 105. a. Plumbing b. General Contractor Overhead and Profit at 6% 8. Slope existing floor to level with hard tile transition. a. Flooring b. General Contractor Overhead and Profit at 6% 9. Revise existing boiler room to meet present code requirements. (Relocate two (2) existing walls to clear boiler 24" in lieu of present 12 ". Add two layers 5/8" gypsum board to bring walls to 2 hours fire rating in lieu of present 1 hour. Replace existing wood non -rated door and frame with new metal door and frame to meet 1' /Z rating required.) a. General Contractor Labor b. Drywall Subcontractor C. Metal Door and Frame d. Finish Hardware Sub -Total e. General Contractor Overhead and Profit at 6% Total Additions CHANGE IN CONTRACT PRICE Page 2 of 2 240.00 14.40 100.00 6.00 560.00 33.60 4,944.87 1,800.00 300.00 225.00 7,269.87 436.19 254.00 106.00 594.00 7,706.00 $ 10,451.00 $ 10,451.00