Ordinance No. 7,374950810 -10
ORDINANCE NO. 7374
AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 3 WITH FIREMEN
CONSTRUCTION CO., INC., FOR THE STERLING MUNICIPAL
LIBRARY ADDITION; AUTHORIZING PAYMENT BY THE CITY OF
BAYTOWN, THE SUM OF TEN THOUSAND FOUR HUNDRED FIFTY -ONE
AND NO /100--DOLLARS ($10,451.00); MAKING OTHER PROVISIONS
RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE
THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize Change
Order No. 3 with Firemen Construction Co., Inc., for the Sterling
Municipal Library Addition. A copy of said change order is
attached hereto, marked Exhibit "A," and made a part hereof for all
intents and purposes.
Section 2: That the City Council of the City of Baytown hereby
authorizes the payment of TEN THOUSAND FOUR HUNDRED FIFTY -ONE AND
N01100 DOLLARS ($10,451.00) to Firemen Construction Co., Inc., for
Change Order No. 3 for the Sterling Municipal Library Addition.
Section 3: That pursuant to the provisions of Texas Local
Government Code Annotated 9 252.04B, the City Manager is hereby
granted general authority to approve any change order involving a
decrease or an increase in costs of FIFTEEN THOUSAND AND N01100
DOLLARS ($15,000.00) or less, subject to the provision that the
original contract price may not be increased by more than
twenty -five (250) or' decreased by more than twenty -five (250)
percent without the consent of the contractor to such decrease.
Section 4: This ordinance shall take effect immediately from
and after its passage by the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown this the 10th day of August,
1995.
PETE C. ALFARO, Mayor
ATTEST: r
® EILEEN P..HALL, City Clerk
17
APPROVED AS TO FORM:
C4- ;",-- ) 4?-- - - /- 5;2g
I qty Attorney
legal/cou nc illaugus U8- 10 -95chO R DER[ ib rary
•
950810 -10a
0,
CHANGE
O%VN1F t ❑
ORDER
' ❑
(:ONI'KA(
(:011'I'Et:1(:'I'(lt ❑
rl r.I.I) 0
AIA U(X:liA1FN7 -C;. UI
OT IER ❑
PROJECT:
(manic, address)
TO CONTRACTM:
(namc, address)
STERLING MUNICIPAL
LIBRARY ADDITION
City of Baytown
Firement Const. Co., Inc.
P. 0. Box 96647
Houston, Texas 77213
the (:untraci is changcd as follows:
SEE ATTACHED SHEETS.
CHANGi ORDER NUNIBIT: Three (3)
MIT: July 31, 1995
AMA TI ?C T'S PRO.11- T NO: 104 -91
CONTKACT DATFI: June 9, 1994
CONTRACT FOR: $1,570,000.00
Not valid until signed by the Owner, Architect and Contractor.
'I"hc origin-,d (Corntraci Slim) (tKKXMXKXpi%ps]s>:uxxxK0LTwxs ........................ 1 ,570, 000.00
pct cllangc by lxcviutlsh• authurizct.t Ch:mgc Orticrs ............................... ; 17,328.00
I he ( Contract Sum) (( Kx ]i74x3G1CQIi444r1Xx]ClUx7�Ixiur to this i;lrut}c Onlcr was ..........
1,587,328.00
-i'hc (C)ntract 5u1111) xAQxiCo0pcwill Ix• (incrcau•cl)};1MXXD0CDf
00tX ?iixxhN, this (:hv1l;c Orcicr in the amount of ............................ 5 10,451.00
The new (Contract tium inrlulGnp this Ch:ngc OrCh-r will he .. S 1,597 , 779.00
Flic C(nlract Timc will he (incr(::Lscd) )y thirty ( 30 ) d;Il S
I'hc date ()I SLlhSlJI1Ii:ll Ctnihlctio n as or the date of INS Change Orda Ihcrcfurc is July 1, 1995
Nu'1'1: Thi> sunmur%, kh-cs nt-t rcticrl in the Gmtrarl Sum, t:nnlracl 'fine la• (;u.11•autt'cil M:1\i111lun Plict %%I(il'h h:n'c IKvl( aulhuri'il(I i,%
Gms(nl m-n (Amngc Oirccikc.
William T. Burge, AIA
A 1(l .I 11'1'I:(:T
490-1_Gar_th RQad_
ali,lrl:,.
Bay w.) 7521
1sr ,
I)ATa; Jul 31, 1995
Firemen Const. Co., Inc.
o :( 1 \ "I Itat ft tl(
Atlllrl >.
Houston, Texas 77213
City of Baytown, Texas
( 1V NI:K
P. 0.- Box 424
a�l(Irr..
Baymm, Texas 77522
1IY ItV
DATE , Ju1y 31,_1995 _ I,:tfl; July 31, 1995
• LUCAUTION: You should sign an original AIA document which has this caution printed in red.
An original assures that changes will not be obscured as may occur when documents are reproduced.
AIA DOCUMENT G701 • CHA \'(',I? (W01'k • P)M- I•:HT1( ).N • AIA` • (1-) 19.1' '1111 -
A.tuan( AN IV, ITI'IA+ (W AW.1111"F( I:\• 1'44 \FIX iul;K AXE. `,a., ua.nl�(.r(1�. Il.(:. (..w, G701 -1987
EXHIBIT A WARNING: Unlicensed photocopying violates U.S. copyright 1zv.• nnet 9:!7incl F::q �cn Minn.
G
STERLING MUNICIPAL LIBRARY ADDITIONS
Change Order No. 3
July 31, 1995
CHANGE ORDER ADDITIONS:
1. Add 2 each 12" x 12" one way mirror door
lights at doors between workroom and desk.
a. Glass and Glazing
b. Wood Doors
Sub -Total
C. General Contractor OH and Profit at 6%
2. Provide 15" t cabinet with door and shelf to
match existing to complete base cabinet
assembly at Pantry 110.
a. McIntosh Cabinets, Inc.
b. General Contractor 6% Overhead and Profit
3. Provide additional names to plague.
a. St. George Sign Co.
b. General Contractor 6% Overhead and Profit
4. Replacement of existing electrical receptacles
at existing floor outlets.
a. Electrical Materials
b. Electrical Labor
Sub -Total
C. Sub Overhead and Profit at 6%
Sub -Total
d. General Contractor Overhead and Profit at 6%
5. Omit (re- painting wall after move -in at workroom to
be paid to contractor outside of contract - $148.40).
6. Modify toilet partition door to clear cabinet edge
and still maintain 32" clear opetung to stall for handicap
access.
$ 100.00
170.00
270.00
16.20
35.00
2.10
298.50
818.98
1,117.48
67.05
1,184.53
7,07
$ 286.00
212.00
37.00
1,256.00
M3
:7
STERLING MUNICIPAL LIBRARY ADDITIONS.
Change Order No. 3
July 31, 1995
a. Toilet Partitions
b. General Contractor Overhead and Profit at 6%
7. Replace existing water closet at Women 105.
a. Plumbing
b. General Contractor Overhead and Profit at 6%
8. Slope existing floor to level with hard tile transition.
a. Flooring
b. General Contractor Overhead and Profit at 6%
9. Revise existing boiler room to meet present code
requirements. (Relocate two (2) existing walls to clear
boiler 24" in lieu of present 12 ". Add two layers 5/8"
gypsum board to bring walls to 2 hours fire rating in lieu
of present 1 hour. Replace existing wood non -rated door
and frame with new metal door and frame to meet 1' /Z rating
required.)
a. General Contractor Labor
b. Drywall Subcontractor
C. Metal Door and Frame
d. Finish Hardware
Sub -Total
e. General Contractor Overhead and Profit at 6%
Total Additions
CHANGE IN CONTRACT PRICE
Page 2 of 2
240.00
14.40
100.00
6.00
560.00
33.60
4,944.87
1,800.00
300.00
225.00
7,269.87
436.19
254.00
106.00
594.00
7,706.00
$ 10,451.00
$ 10,451.00