Loading...
Ordinance No. 7,360950727 -7 ORDINANCE NO. 7360 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 5 WITH N & S ® CONSTRUCTION CO. FOR THE EAST DISTRICT WASTEWATER TREATMENT PLANT EXPANSION PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FIVE THOUSAND FIVE HUNDRED AND NO /100 DOLLARS ($5,500.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 5 with N & S Construction Co. for the East District Wastewater Treatment Plant Expansion Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FIVE THOUSAND FIVE HUNDRED AND N01100 DOLLARS ($5,500.00) to N & S Construction Co. for Change Order No. 5 for the East District Wastewater Treatment Plant Expansion Project. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (250) or decreased by more than twenty -five (25a) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the. affirmative vote of the City Council of the City of Baytown this the 27th day of July, 1995. PETE C. ALF O, Mayor ATTEST.,, • EILEEN P. HALL, City Clerk APPROVED AS TO FORM: c 3 4 u 4-, �;-) wa " 7., j -c; �x , ACIO RAMIR Z, S . City Attorney legallcau ncilljuly /7- 27 -9Sch0 RDERn&S 0 950727 -7a 0 W,AVNV SMITH & ASSOCIATES July 6, 1995 CHANGE ORDER NO. 5 Honorable Mayor & City Council CITY OF BAYTOWN P.O. Box 424 Baytown, TX 77522 SUBJECT: Request for change in Contract CONTRACTOR: N & S Construction Co., LLC CONTRACT DATED: March 8, 1994 ORIGINAL CONTRACT AMOUNT: $3,704,613.50 PROJECT: East District S.T.P. Expansion, 1.5 MGD WSA JOB NO.: 024 -013 -4 Honorable Mayor & City Council, Examination of the West Re- aeration Basin in the existing plant reveals a large accumulation of sand, grit and sludge in the north end of the basin. This significantly diminishes the effectiveness of the aeration process and we recommend removal of the deposit. N & S Construction Co., LLC, the plant expansion Contractor, has proposed complete removal of the material for a lump sum price of $5,500.00. We consider the offer reasonable and recommend acceptance. The Contractor's letter proposal also contains an offer to fill corners of the existing clarifier, but we do not recommend this action. A copy of the Contractor's letter is included herewith. EXHaT A 11811 East Freeway, Ste. 580 - Houston, Texas 77029 - 713/450 -1300 • FAX: 713/450 -1385 City of Baytown Change Order No. 5 July 6, 1995 WSA Job 024 -013 -4 Page 2 SUMMARY: Original Contract Amount .. ............................... _ . $3,704,613.50 Change Order No. 1, Add ...... ............................... $11,355.00 Change Order No. 2, Add ....... ............................... $6,956.00 Change Order No. 3, Add ....... ............................... $2,337.00 Change Order No. 4, Add ....... ............................... $8,033.00 Change Order No. 5, Add ........ ............................... $5,500.00 Change in Contract Time, Add .... ............................... 5 W.D. Amended Contract Amount ... ............................... $3,738,794.50 Amended Completion Date ....... ............................... 11/3/95 RECOMMENDED FOR APPROVAL: Wayne Smith & Associates, Inc. By: Dat 7 —� APPROVED: City of Baytown LN Date: • AGREED: N &S Construction Co. C By 6lis�- �J at, �-S • is JUL -03 -1995 14:56 FROM N&S MAIN OFFICE HOUSTON June 29, 1995 I 4501385 P.02 Wayne Smith & Associates, Inc. 11811 East Freeway, Suite 580 Houston, Texas 77029 Attn: Stan Cargill Re: Baytown East District Sewage Treatment Plant Expansion Dear Mr_ Cargill: At your request, N & S Construction Co. has prepared the following two (2) proposals for work at the referenced Plant. The first price is to remove sand /grit /sludge from the North end of the West Re—aeration Basin in the existing Plant. This proposal is to furnish Labor, Equipment, Materials, Insurance, etc. necessary to remove this material from the basin and load the owner's truck or stock pile for the owner to dispose of at a later time. Our Turn Key Price for this work is Five Thousand Five Hundred Dollars and No. Cents ($5,500.00). The second price is to install Fill in the four corners of the existing Plants' Clarifier. This proposal is to furnish Labor, Equipment, Materials, Insurance, etc. to fill these corners out side of a forty foot (40 ft.) radius on a sixty (60) degree slope in each corner with 1.5 per ton cement stabalized sand, covered with 4 inches of gunite concrete, with No. 4 rebar on 12 inch centers each way connected to No. 4 rebar dowells on 12 inch centers that are drilled and epoxied into the existing floor. In addition, in each corner the stabalized sand will be capped with a 12 inch reinforced concrete slab. Our Turn Key Price for this work is Fifty- -Two Thousand Dollars and No Cents ($52,000.00). In that both these prices are based on utilizing man power and equipment that is presently at the Plant Site, a response is required within two (2) weeks_ If the foregoing is lacking or additional information is required, please let me know. nl John G. Shumway President JGS:es CC: Loren McDaniels N & 5 Construction Co., LLC 713/445 -4242 FAX 445 -1921 • 13209 Ann Louise Rd. • Houston, Texas 77086 TOTAL P.02