Loading...
Ordinance No. 7,33295062?_ -1 ORDINANCE NO. 7332 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 WITH FIREMEN • CONSTRUCTION COMPANY, INC., FOR THE STERLING MUNICIPAL LIBRARY EXPANSION PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF EIGHT THOUSAND ONE HUNDRED FIFTY -SEVEN AND N01100 DOLLARS ($8,157.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Firemen Construction Company, Inc., for the Sterling Municipal Library Expansion Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of EIGHT THOUSAND ONE HUNDRED FIFTY -SEVEN AND N01100 DOLLARS ($8,157.00) to Firemen Construction Company, Inc., for Change Order No. 2 for the Sterling Municipal Library Expansion Project. Section 3: That pursuant to the provisions of Texas Local • Government Code Annotated § 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (250) or decreased by more than twenty -five (25°s) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 22nd day of June, 1995. DAVID BYFORD, Mayor P empore ATTEST: EILEEIv P. HALL, City Clerk • APPROVED AS TO FORM; CIO RAMIREZ, SR, City Attorney ri LJ legal /council / ju ne/6 -22 -95 chORDE RI ib rary 11 1I u 95062271a STERLING MUNICIPAL LIBRARY ADDITIONS Change Order No. 2 May 18, 1995 CHANGE ORDER ADDITIONS: 1. Relocate 1 -1/2" existing water line to move off wall of Store Room log to clear new lintel. a. M. S. Young Co. $ 471.00 b. + 6% Overhead and Profit 28.00 $ 499.00 2. Provide 4' wide washed gravel sidewalk to match existing along existing building adjacent to Porch 139. a. Firemen Construction 1,121.00 3. Revise mechanical piping per Mechanical Engineering drawing to remain under roof and clear existing low roof area. • a. Polar Air Mechanical 5,841.00 PAM + 6% Overhead and Profit ( 06) (5,84 1) = 350,00 b. Firemen + 6% Overhead and Profit (.06) (6,191) = 371.00 6,562.00 C. Note: Reference specification page SEC -6, paragraph 12. 1.3 calls for 6% subcontractor mark up, and not 10% as quoted by Polar Air. 4. Omit chiller unit on the SK -1 sink location in Print 128 and provide new sink for Pantry 110 6-1/2" deep to meet the requirements of ADA. Revise size of 6 -1 /2" deep sink at Print 128 to be approximately 16" square or smaller than indicated on plan - verify size. a. M. S. Young Company, Inc. 33.00 • b. Firemen + 6% Overhead and Profit (.06) (33) = 2,00 35.00 EXHIBIT A u • • STERLING MUNICIPAL LIBRARY ADDITIONS Change Order No. 2 May 18, 1995 • 5. install 3 -3" rigid conduits to connect cable trays on the existing low roof area. a. Firemen Construction 3,131.00 6. Revise toilet compartments from ceiling hung style to floor mounted. a) Firemen Construction No Change 7. Provide condensate drain from ceiling mounted A/C unit in Book Drop 137. Plumber to run line exposed on wall of Book Drop room to floor, then through wall, turn down and run underground to storm line. Secure inspection from City Building Department prior to cover up of lines. a. M. S. Young Co. 931.00 b. Masonry - Material and Labor 150.00 • C. Firemen + 6% Overhead and Profit (.06) (1,081) = 65.00 1,146.00 Total Additions $ 12,494.00 CHANGE ORDER DEDUCTIONS: 8. Delete cast iron overflow drains at roof drains and add cast iron 1/4 bends at column footings. a. M. S. Young Company, Inc. ( 2,868.00) 9. Credit accessories allowance. ( 1,000.00) a. Reference specifications page IA-1, Section 10. 10. Credit unused hardware allowance. ( 469.00) • CHANGE IN CONTRACT PRICE $ 8,157.00 Page 2 of 2