Ordinance No. 7,143941025 -4 ORDINANCE NO. 7143 • AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 3 WITH CRAIG, SHEFFIELD, AND AUSTIN FOR THE ENLARGEMENT OF THE WEST DISTRICT WASTEWATER TREATMENT PLANT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FORTY -FIVE THOUSAND SEVEN HUNDRED FORTY -FOUR AND 68/100 DOLLARS ($45,744.68) ; MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 3 with Craig, Sheffield, and Austin for the enlargement of the West District Wastewater Treatment Plant. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FORTY -FIVE THOUSAND SEVEN HUNDRED FORTY -FOUR AND 68/100 DOLLARS ($45,744.68) to Craig, Sheffield, and Austin for Change Order No. 3 for the enlargement of the West District Wastewater Treatment Plant. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated S 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (25 %) or decreased by more than twenty -five (25 %) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown this the 25th day of October, 1994. P C- • PETE C. AL ARO, Mayor 941025 --4a • ATTEST: R, .0--e E LEEK P. HALL, City Clerk APPROVED AS TO FORM: CIO RAMIREZ, SR., y 'Attorney • kSiUmmaocwba /10-25- %cbDRDEWedDNnWr • CHANGE ORDER NO. 3 September 26, 1994 Page 1 Honorable Pete C. Alfaro, Mayor and City Council City of Baytown P.O. Box 424 Baytown, Texas 77522 -0424 Subject: Request for approval of rates on labor and /or mate- rials and /or equipment. Contractor: Craig, Sheffield, and Austin Project: Enlargement of West District Wastewater Treatment Plant, Job No. 044 -43, Contract No. 1 Original Contract Amount: $5,037,800.00 Dear Mayor and City Council: Your approval is requested on the following described changes to the Contract Documents. Description 1. Delete concrete slab on top of effluent valve pit. 2. Modifications to digester equipment on existing treatment facilities including thickening basin modifications, air lift for supernatent, grout and concrete wall for thickener area, electrical and timers for air lift operations, piping modifica- tions for facilitating two independent digester areas. Cost (Lump Sum) $ (1,794.10) (Lump Sum) $ 24,018.90 • Change Order No. 3 044 -43, Contract No. 1 3. Modifications to classifier degritting area to allow larger sludge hauling vehicles per City of Baytown's sludge hauling agree- ment. Classifier re- orientation from behind existing centrifugel. 4. Demolition of existing headworks including removal of existing equipment and stockpiling on site, knock down walls to below grade, fill influent well, grade and construct sidewalk across area from office to new concrete drive. 5. Delete drainage ditch modifica- tions per bid price. 6. Digested waste sludge modifica- tions including change digested waste sludge feed line from 4" to 6" per belt press manufactur- ers recommendation, add tee on scum line to digester for opera- tion during conversion of exist- ing plant to digester, relocation of existing macerator to new digested sludge pump area, change speed on digested sludge pump to meet belt press manufacturers sludge feed rate recommendations and credit for return of one (1) digested waste sludge pump. 7. Blower system area modifications including add interior door at MCC to blower room for interior access. Delete blower building louver at MCC room and add air conditioner. Delete rework of existing blowers including bearing replacement. • September 26, 1994 Page 2 (Lump Sum) $ 150.08 (Lump Sum) $ 14,790.67 (Lump Sum) $ (12,000.00) (Lump Sum) $ 531.94 (Lump Sum) $ (3,067.57) n LJ Change Order No. 3 044 -43, Contract No. 1 8. Add S02 ton cylinder heat blankets (2 required). 9. Add pressure relief valves to. treatment modules at aeration basins. 10. Piping modifications including influent pump station discharge piping to accommodate redesign of headwork area, reroute of RAS pump suction line to allow RAS from clarifier rather than aeration basin, modify effluent pump station area to accommodate 24" effluent force main rather than 16" and modifications to effluent pump discharge piping. September 26, 1994 Page 3 (Lump Sum) $ 5,157.60 (Lump Sum) $ 3,184.35 (Lump Sum) $ 14,772.81 Total Change Order No. 1 and No. 2 $ 0.00 Change Order No. 3 $ 45,744.68 Original Contract Amount $5,037,800.00 Adjusted Contract Amount $5,083,544.68 Extension of Time This Change Order 0 Calendar Days Change Order No. 3 represents an increase of 0.91% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. • Change Order No. 3 September 26, 1994 444 -43, Contract No. 1 Page 4 SUBMITTED FOR APPROVAL: LANGFORD ENGINEERING, INC. By. Doug Lu ceford Manager of Field Pervices Date / o'//-qy APPROVED: CITY OF BAYTOWN By: Date C7 ACCEPTED: CRAIG, SHEFFIELD, AND AUSTIN By • P —T John . Craig Chairman of the Board Date / t) - / / — q