Ordinance No. 7,013940601 -1 ORDINANCE NO. 7013 . AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 WITH ANGEL BROTHERS ENTERPRISES, INC. FOR THE 1993 STREET IMPROVEMENT PROGRAM - PHASE II; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF ONE HUNDRED THIRTY -EIGHT THOUSAND SIX HUNDRED EIGHTY -FIVE AND 25/100 DOLLARS ($138,685.25); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. *********************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 with Angel Brothers Enterprises, Inc. for the 1993 Street Improvement Program - Phase II. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of ONE HUNDRED THIRTY -EIGHT THOUSAND SIX HUNDRED EIGHTY -FIVE AND 25/100 DOLLARS ($138,685.25) to Angel Brothers Enterprises, Inc. for Change Order No. 2 for the 1993 Street Improvement Program - Phase II. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated S 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (25 %) or decreased by more than twenty -five (25 %) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1st day of ,Tune, 1994. __d& l'- PETE C. ALFARD, Mayor ATTEST: LEFS P. HALL, City Clerk • " W G LAC RAMIREZ, ., City Attorney kgsY uo W6- 1- 94cb0RDERnnXe! CHANGE ORDER No.. 010 Dated -9a..1 ...31r. X94 Owner's Projax No. 93 -3040 Engineer's Project No...... Project -- .�9.......�x.�r=P..he...._... Owner Citz Baytown ._., Contractor Angel Brothers Ente - prises t Inc_. Contract Date ,,,,MS; ..L...�� .�_..... ._.... Contract For Paving & =it ,y,. g3�Qpg]Bents .q'L De ;kor,�, De, g „ ,., Raj, fig_. .... ................_ To: Angel Brothers Enterprises, Inc. Contractor You are directed to make the changes noted below in the subject contract: Owner ...................._._... ..._....__. .. By Date...._._........_..._ ......_......_ Nature of the Change Excavate and dispose of 24" of subgrade between Commerce and N. Main on Defee. Replace the material with compacted limestone. It is not necessary to lime stabilize either the new subgrade or the new base. Reconstruct the base on most of Sterling. Enclosures: Letter to Rent Laze The changes result in the following adjustment of Contract Prim and Contract Time: Contract Price Prior to This Change Order Net (Increase) XI Resulting from this Change Order s ... 1,6MM M ............ S..... 138:685 ;25 ............. • Current Contract Price Including This Change Order s...1 r 8 i 6 = 866 ; 95 ............. NSPE 1910 -8-B (1970 Edition) a 1970. Nsdanw soday of Pwimnamal EWsWWcs Page 1 of .._ pages D(HUT A Contract Time Prior to This Change Order .. fig Days. Net (Increase) () Resulting From This Change Order . 5 Work ing Days. *== Contract Time including This Change Order ...,.,.,..., 165 Working ------- ...... Days. The Above Changes Are Approved: Busch, Hutchison & Assoc., Inc. �if3tN88R •..... by ��Gs? paw The Above Changes Are Accepted: Aag_e1.Brothers Enterprises, _ CONTRACTOR »..... by Date _.... ».... /'+1��% ..... ...»».. n u Pages -.L of 3 Pall IV-8Z .EW1 BUSCH, HUTCHISON & ASSOCIATES, INC. ARC vwrs.ENa EERs Mr. Kent Laza, City Engineer City of Baytown P. 0. Box 424 Baytown, Texas 77522 1107 FLEETWOOD • BAYTOWN, TEXAS 77520 • (713) 422 -8213 31 May 1994 RE: CHANGE ORDER NO. 2, 1993 STREET IMPROVEMENT PROGRAM PHASE II Dear Mr. l.aza: Two situations are addressed in this change order. First, when the contractor removed the concrete base from Defee Street between Commerce and North Main the soil below was found to be in poor condition. Apparently inadequate drainage in the area had caused about 24 inches of the subgrade to become saturated and unsuitable for paving. Three solutions were considered to alleviate the situation and costs calculated for each. They were (1) pour a new concrete base to bridge the poor soil, (2) remove the soil, dry it, lime stabilize it and place it back in the excavation, and (3) remove the bad material and replace it with limestone. The last option was the median cost, but is by far the most expedient route and was therefore chosen. The cost of this procedure is estimated to be $36,109.00 This cost also includes adding two 5 ft. curb inlets and 60 feet of 15 inch RCP to provide for drainage, the lack of which caused the problem. The other two options were within $3,000.00 of this figure. This operation also eliminates 1,253 S.Y. of lime stabilization and a like amount of base reconstruction at a total savings of about $7,500.00 which will show up as underruns of those bid items. The net cost of this change will actually be about $28,609.00. Second, although most of Sterling was not to be reconstructed, the installation of the new water and sewer lines along with all the utility service lines which had to be reconnected has virtually destroyed the integrity of the existing base. Consequently it has been decided it would be best to go ahead and reconstruct the base on most of Sterling. This construction will add a net cost of $110.076.25 to the project. These two items represent an increase of $138,685.25. Sincerely yours, Q J es P. Hutchison, P.E. JPH /ma