Loading...
Ordinance No. 6,859931111 -7 ORDINANCE NO. 6859 • AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY MANAGER TO EXECUTE AND THE CITY CLERK TO ATTEST TO AN AGREEMENT FOR ENGINEERING SERVICES WITH TANK INDUSTRY CONSULTANTS; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, THE SUM OF FIFTY -TWO THOUSAND THREE HUNDRED EIGHTY AND N01100 DOLLARS ($52,380.00) ; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager and City Clerk of the City of Baytown to execute and attest to an Agreement for Engineering Services with Tank Industry Consultants. A copy of said Agreement is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to Tank Industry Consultants of the sum of FIFTY -TWO THOUSAND THREE HUNDRED EIGHTY AND N01100 DOLLARS ($52,380.00), pursuant to the Agreement. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 11th day of November, 1993. PETE C. ALFXRO, Mayor ATTEST: EILEEN P. HALL, City Clerk fZMCIO RAMIREZ, S , City Attorney 0 I*Uoo"W 11- 11- 93ftrwTWAvd NOV 11 '93 05:36PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.2 • 30223MM FOR 33FOINEBRING 833tv=C88 THIS AGREEMENT, made this day of and between the City of Ba , 1993 by Texas 77532 -0424, hereafteroreferredet at,, the l "p r at, Baytown, INDUSTRY CONSULTANTS, INC. with a local office located at, 7211 Regency Square Boulevard, Houston, Texas 77036, hereafter referred to as the "aNGINESjt." The OMmR intends to have one elevated tank dismantled and devel- op a maintenance program (including rehabilitating) for seven other elevated tanks. The SNOXV281 agrees to erform various professional services required for design, specifications and on- site project representation of said project as re Ohs. A list of these eight tanks follows: quested by the Tank to be dismantled: 100,000 gallon elevated tank located at 2511 Cedar Bayou Tanks to be maintained and rehabilitated: 500400 gallon elevated tank located at 3500 Baker Road 500400 gallon elevated tank located at 607 East James Street 500,000 gallon elevated tank located at 1208 Park Street 150,000 gallon elevated tank located at 300 Barnes street 500,000 gallon elevated tank located at 7400 Bayway 500400 gallon elevated tank located at 2220 West Main 2,000000 gallon elevated tank located at 2726 Massey Tompkins WITNESSETH: That for and in consideration of promises between the parties hereto, the it is mutual covenants and hereby agreed: SECTION A - ENGINEERING SERVICES rOR TANK EVALUATION AND REPORT pREpARATION After written authorization to proceed with the Evaluation and Report phase, ZNGX :egg shall perform the following services for each of the above referenced eight tanks listed for evaluation: 1. Perform a careful study of the tank's interior, exterior, foundation(s), and accessories. 2. Take color photographs of the tank's interior, exterior, foundation(s), and accessories. 3. Take pertinent measurements of the tank's accessories. • page i of 23 �1B1T A • NOV 11 '93 05 :37PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.3 4. Take ultrasonic thickness measurements as deemed necessary by the iwG=3MEA. For the Baker Road Tank ONLY, nG2NEER would ultrasonically test the weld quality of this specific tank. 5. A certified engineering report shall be issued concerning the :observed condition Of the tank. 6. The engineering report shall describe the observations of the technician and our recommendations. 7. The engineering report shall address the tank coatings, cor- rosion protection, operating, sanitary and safety deficien- cies, and compliance with present industry and TNRCC stan- dards. 8. The engineering report shall include an ENG13aE1R1s opinion of probable costs for the Project, including the following which Will be separately itemised: construction costs, allowances for engineering costs and contingencies, and (on the basis of information furnished by OMR) allowances for such other items as charges of all other professionals and consultants. The total of all such costs, allowances, etc. are hereafter called "Project costs.,, 9. The engineering report shall include anticipated life of coatings and structure, and an estimated replacement cost of the tank. 10. one copy of the engineering report shall include mounted color photographs bound with the written text. Another nine copies of the engineering report shall include color copies of the mounted photographs with the written text. 11. The report shall be certified by a Texas Registered Professional Engineer who is on the BNGINEER's full -time staff. 13. In connection with each evaluation, the E1fQI1i,mR shall wash- out the tank by removing all mud and debris from the tank in- terior and placing it on the ground at the bass of the tank for removal by the ONNER. The ENGINEER shall remove up to three sets of discarded cathodic protection anodes from the bottom of the tank. 13. In connection with the evaluation, the ZNGIMER shall dis- infect the tank in accordance with AwwA C652�92 Method Three. The 7GINNER shall be compensated for such engineering aer- vices in accordance with Section K. Peg* 2 of 13 NOV it '93 05 :37PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.4 SECTION B - ENGINEERING SERVICES FOR TANK DMOLITION After written authorization to proceed with the Tank Demolition Phase, BNGINXNR shall perform the following services for the above referenced tank listed for dismantling: 1. Review evaluation report to determine tank demolition re- quirements. 2• Prepare detailed plans, technical specifications, and con- tract documents o in the ENatNEai's selected format for the dismantling, removal, handling and proper disposal /reuse of scrap material, protection of other structures on -site, and site clean -up. 3. Provide Additional Engineorinq services and/or Representation services as outlined in Section D and section E. The ENGINEER shall be compensated for such engineering ser- vices irn- accordance with Section K. SECTION C - ENGINEERING SERVICES FOR TANK RMBILITATION SPECIFICATION MapARATION After written authorization to proceed with the Tank Rehabilita- tion Specification Preparation Phase, ENGINEER shall: 1• The ENGINEER will prepare detailed plans, technical specifi- cations, and contract documents in the EmaINEmaps selected format for (and limited to): - The cleaning and painting of tank. - The handling and disposal /treatment of the wants material from the cleaning operations. The repairs to correct struetural,sanitary, safety, TNRCe, and operational deficiencies. - The cathodic protection system. The tank disinfection. Z. The ENGINEEi! will distribute Notice to Bidders to Contractors and distribute bidding packages to those contractors who re- quest them. The ENGINEER will answer questions which con- tractors may have while preparing their bids. The GIIi Will prepare addendum which are required for clarilic Bi1WGIN mmR The ENGINEER shall be compensated for such engineering ser- vices in accordance with Section K. Page S of 13 • NOV 11 193 05 :48PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.1 SECTION D - ADDITIONAL ENGINEERING SERVICES FOR TANK REHABILITATION After written authorization to proceed with the Tank Rehabilita- tion specification Preparation phase, the MIUNR shall furnish basic engineering and project administration services as follows: 1. The XNe1nER will review the bids, tabulate and certify the bids, and make recommendation of award. 2. The ENaIn2R will review the Contractor's submittals and shop drawings for proper general design concept, sound structural engineering procedures, ANNA requirements, and compliance with the project specifications. 3. The ENGINEER will be available for in -house contract adminis- tration as requested by the OWNER. Such administration would include phone or on -site consultation, assist the o11X33t with the "Services Provided by the OWNXR," community acceptance meetings and presentations, change order preparation, pay estimate review, mediation.of contractor's disputes, and any other matter related to the project as requested in writing by the OWNER and mutually agreeable to both the ENGINEER and OWNER. The ExaINEER shall be compensated for such additional engineering services in accordance with section K. SECTION E - REPRESENTATION SERVICES rOR TANK REHABILITATION After written authorisation to proceed with the Representation services for Tank Rehabilitation Phase, SxoxmxR shall: 2. The SmolxSRR will assist the OWAMR in interpreting the intent of the drawings and specifications to protect the OWNER against defects and deficiencies in workmanship and materials on the part of the contractor(s). The ExeinnZR will not, however, guarantee the performance of any contractor. 2. The ExaINUR will cooperate and work closely with representa- tives of the OWNER and all parties involved. 3. The ExalxsER shall provide construction observation as di- rected by the OWNER for the tank rehabilitation. ;:The ENGINEER will furnish the OWN RIM representative a writ- ,ten report of the findings of each observation. The ENGINIZA does not guarantee the performance of the Contractor by the zmaINEER's performance of such detailed construction observa- Page 4 of 13 0 NOV 11 '93 05:48PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.2 tion. The ZyalnlR's undertaking hereunder shall not relieve the contractor of his obligation to perform the work in con - formity with the drawings and specifications and in a work- manlike mannert shall not make the ENGINEER an insurer of the contractors performance; and shall not impose on the MZMZR an obligation to see that the work is performed in a safe manner. Specifically omitted from the ENGINVERIs duties are any review of the Contractor's safety precautions, or the means, methods, sequences, or procedures required for the Contractor to perform the work but not related to the final or completed project. omitted design or review services in- clude but are not limited to shoring, scaffolding, underpin - ninq, temporary retainment of excavations and any erection methods and temporary bracing. 4. The ENOINERR will make final evaluation of all construction and a written verification of final evaluation to the 0 2- 5. The ERaliilsR16 representative for the project will use the steel Structures Painting Council visual standard SSPC -Vie 1 to evaluate the cleanliness of the blast cleaning. A Teo -Tex tape system will be used to determine the surface profile. A 11 Kling psychrometer and surface temperature measurement thermometers will be used to monitor the environmental condi- tions and cleaning and painting surface conditions under which the work is performed. Vat and dry coating thickness gages will be used to monitor the coating film thickness. A wet sponge holiday detector will be used on all submerged in- terior surfaces to detect voids in the coating. Should they be necessary, Tooke gage and adhesion measuring equipment will be dispatched from our Speedway office. 6, The xNaINEER shall perform a one -year Anniversary evaluation of each tank within 13 months of the completion of each raha- bilitation project. This evaluation shall identify any deficiencies and have the contractor correct. A certified „engineering report shall be issued concerning the findings and the verification of rework performed. 7. The duties of the RNGINXNA shall be: a. Conduct on -site observation of the Work in progress to assist the OWNER in determining if the Work is in gener- al proceeding in accordance with the Contract Documents. b. Report to OWNER whenever EmGINBER believes that any Work is unsatisfactory or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any observation, test or ap- proval required to be made; and advise OWnR of Work that guai SEER believes should be corrected or rejected or should be uncovered for observation, or requires spe- cial testing, observation or approval. Page 5 of 13 NOV 11 193 05 :38PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.6 i C. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these visits and report to the OWNER. d. Report to OWNER when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued by OWNER. e. Conduct final evaluation in the company of Contractor and prepare a list of items to be completed or cor- rected. f. Observe that all items on the list have been completed or corrected and make recommendation to OWNER concerning acceptance. S. The limitations of authority of the zNax XR shall include: a. The ENGINEER shall not authorize any deviation from the Contract Documents or substitution of materials or equip- ment, unless directed by the OwXZR. b. The ENGINEER shall not exceed the limitations of the OWNER's authority as set forth in this AGREEMENT and the Contract Documents. c. The ENGINEER shall not undertake any of the responsibil- ities of the contractor, subcontractors or contractor's superintendent. d. The ENGINEER shall not advise on, issue directions rela- tive to or assume control over any aspect of the means, methods, techniques, sequences or procedures of construc- tion. e. The ENGINEER shall not advise on, issue directions regard- ing or assume control over safety precautions and programs in connection with the Work. f. The ENGINEER shall not advise on, issue directions regard- ing or assume control over contractor's compliance with environmental regulations. The sme3sasR shall be compensated for such project repre- sentation services in accordance with Section K. SECTION F - SERVICES FURNISHED BY THE OWNER I. Designate a person to act as OWNERIB representative with re- spect to the work to be performed under this AGRESMENT. Such person shall have the authority to transmit instructions, receive information, interpret and define the OWNER18 policies and decisions with respect to materials, equipment, elements, and systems pertinent to $NaINEEArs services. a. Complete and promptly submit the Tank Data Sheets. • page 6 of 23 NOV 11 '93 05 :39PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.7 • 3. ',Arrange for access to and make all Provisions for ENGINNER to enter upon public and private property as required for ENGI- NEER to perform services under this Agreement. 4. Remove all ground level manhole covers before the evaluation and resecure them after completion of the field services pro- vided by ENGINEER. (Frequently the manhole gasket must be re- placed to seal the manhole properly.) 5. Drain and refill the tank prior to and after completion of the field services provided by ENr,,INZBR. 6. Drain and prepare the tank for the field evaluation on the agreed date and time. 7. Operate the water works distribution system while the tank is out of service without any aesistanca or consultation by ZN- GMER. S. Furnish a ground man for safety reasons for the duration of the field services performed by BNGZMZR. 9 - supply water with a standard garden hose connection within 50' of the base of the tank. 10. Sample and test the water in the tank after completion of the field work and the disinfection of the tank by IM=NUR. The water shall meet all State Board of Health (or other applica- ble regulatory agencies) requirements prior to returninq the tank to service. 11. Provide the $NOINXzR all pertinent information required to specify and design repairs to each tank. 12. Fulfill all legal advertising requirements. 13. Pay all permitting fees. 14. Perform a thorough review of all materials submitted by =gZ-. NBBR. 15. Give - prompt written notice to BN4ttt2R whenever oRNma ob- serves or otherwise becomes aware of any development that af- fects the scope or timing of INQUSBRIs services, or any defect or nonconformance in the work of any Contractor. 16. Bear all costs incident to compliance with the requirements of this section F. • page 7 of 13 • n L� NOV 11 '93 05:39PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.8 SECTION G - INSURANCE 1• ,RNG=M$R ®hall, at his or her own ense `and keep in force during the torn of this contract such tin- surance as set forth below. NNGINMER shall not commence work under this contract until he or she has obtained all the in- surance required under this contract and such insurance has been approved by oWNzE. The insurance requirements remain in effect throughout the term of this contract. shall a. Workers i etatatory. E'mployeW Liabili for each accidsntt $500,000 policy cyolimitl- Disease$100,000 b. for bodily injury to -third parties, :Xt legal liability personal injury liability coverage? and for damage uto property of third parties, with a combined bodily injury and property damage minimum limit of $1,000,000 each oc- currence. c. d. covering owned, hind and non -owned single limit of liability of $1,000,000. a occurrence limit and $100,000 aggregate limit,0�000 each ,0 2. Bach insurance policy to be furnished by 2962=23L shall 1n- cluds the following conditions by endorsement to the policy: a. The general liability and comprehensive automobile Policies will M,LU that thirty (30) days prior to the expiration, cancellation, non - renewal or any material changs in coverage, a notice thereof shall be given to OWNRR by mail to: City of Baytown 2401 Market P.O. Box 424 Baytown, Texas 77522 -0424 If the policy is canceled for nonpayment of fifteen (30) days advance written notice to OWNg ais ra_ quired; page • of =i • NOV 11 '93 05 :39PM TANK INDUSTRY NQ TANK INDUSTRY HQ P.9 b. The term OWN ;R shall include all authorities, boards, bureaus, commissions, division, departments and offices of the OWNER and the individual members, employees and agents thereof in their official capacities, and /or while acting on behalf of the onmR. C. All provisions of the contract concernin g business auto liability, duty, and standards of scare shall be underwritten by contractual liability coverage suffi- cient to include such obligations within applicable policies d. The OWNER shah, be listed as an additional insured on the General Liability, Automobile Liability and the profes- sional Liability policies. 3. Concerning insurance to be furnished by SNaINSaN, it is a condition precedent to acceptability thereof that: a. All policies are to be written through companies duly ap- proved to transact that class of insurance in the State of Texas. SECTION H - TERMINATION 1' The OWNER may, by written notice to the RXgXNEgR, terminate this AGREEMENT in whole or in part at any time, either for the OMR16 convenience or because of the failure of the EN-- aSNEER to perform services in a timely manner, failure to meat standards required, or fultill the BmOTER#B obligation NagR shall: under this AGREEMENT. Upon receipt of such notice, the xxal- a. Immediately discontinue all services affected upon receipt of termination notice. b. Deliver to the OWNER all surveys, data, drawings, com- putations and such other information and materials as may have been provided by the OWNER or accumulated by the SNaINNER in performing this AGREEMENT, whether com- plated or in progress. 2. If termination is due to the failure of the L'NGZNEER to ful- fill AGREEMENT obligations, the OWNER may take over the work and prosecute same to completion: by contract or otherwise. SECTION I - REUSE OF DOCUMENTS All documents including Drawings and Specifications prepared or • furnished by 11Wa=y,Eg (and EEa=XB:R's independent professional, associates and consultants) pursuant to this Agreement are in- Page 9 of 13 NOV 11 '93 05 :40PM TANK INDUSTRY HQ TANK INDUSTRY HQ P.10 • struments of service in respect of the Project and ENGINgER, shall retain an ownership and property interest therein whether ornot the project is completed. OWNER may make and retain copies for information and reference in connection with the us® and oc- r, such doou- cupancy of the Project by OWNER and others; howeve ments are not intended or represented to be suit eve for reuse by OIPMER or others on extensions of the project or - jact. Any rouse without written verification or on any other pro adaptation by pro- adaptation by for the specific purpose intended will be at 01Pn 2#2 OOZING risk and without liability or legal exposure to zVQINEER, or to NNQ=NBXR's independent professional associates or consultants, and OWNER shall indemnify and hold harmless ENGINEER and aNal- NIIZRfs independent professional associates and consultants from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any Such verification or adaptation will entitle aNOINgER to further compensation at rates to be agreed upon by OWNER and ENGINEER. SECTION a - INDEMNIFICATION The NNO=NEEA agrees to and shall indemnify, hold harmless, and defend the C1IIIER, its officers, agents and employees, from and against any and all Claims. losses, damages, causes of action, suite and liability of every kind, including all expenses of lit- igation, court costs, and attorneys' fees, for injury to or death Of any parson, Or for damage to any property, arising out of or in connection with the services rendered by the ENGINEER under this AGREEMENT, where such injuries, death, or damages, are caused by the ENaINSER's sole negligence or the joint negligence Of the ENGINEER and any other person or entity, but only for that portion of such claims, negligence of the ENOIN$ER as Compared to the total negligence of all persons, firms, or corporations results in said damages to the OWNER. It is the expressed inten- tion of the parties hereto, both the ENGINEER and the 01, R, that the indemnity provided for in this paragraph is indemnity by =- GINERR to indemnify and protect the ONSBR from the consequences of the NNQ1XZZR's own negligence, whether that negligence is the sole or concurring cause of the injury, death, or damage. SECTION K - COMPENSATION FOR PROFESSIONAL ENGINEERING SERVICES t. The OWNER agrees to pay the SNOINRER Compensation for the services listed under section At Items 1 through 11 (inclu- sive) of this AGREEMENT for a fixed fee for each tank as fol- lows.. 100,000 gallon tank located at 2511 Cedar Bayou - $4,130.00 500,000 gallon tank located at 3500 Baker Road- $5,430.00 500,000 gallon tank located at 507 East James Street 500,000 gallon tank located at 1208 Park Street - 630,00 X00 $4 150,000 gallon tank located at 300 Barnes Street - '630.00 Page to of 13 $4.360.00 • NOV 11 '93 05 :40PM TAW INDUSTRY HO TANK INDUSTRY HQ P.11 500,000 gallon tank located at 7400 Bayway - $4,630.00 500,000 gallon tank located at 2720 West Main - $40630.00 2,000,000 gallon tank located at 2726 Massey Tompkins - $4,950.00 The 01v stress services s to pay the ZNGINN$g compensation for the listed under Section A, Item 12 of this AGREEMENT for a fixed tee for each tank as follows: 300,000 gallon tank located at 3500'Baker Road - $950.00 500,000 gallon tank located at 607 East James Street - $950.00 500,000 gallon tank located at 1208 Park Street - $950.00 150,000 gallon tank located at 300 Barnes Street - $e50.00 500,000 gallon tank located at 7400 Bayway - $950.00 500,000 gallon tank located at 2220 west Main - $950.00 2,000,000 gallon tank located at 2726 Massey Tompkins - $1,190.00 The oWxzst agrees to pay the RSG*NSBR compensation for the services listsd under Section A. Item 13 of this AGREEMENT for a fixed fee for each tank as follows: 500,000 gallon tank located at 3500 Baker Road - $95.00 500,000 gallon tank located at 507 East James Street - $95,00 500,000 gallon tank located at 1208 Park Street - $95.00 150400 gallon tank located at 300 Barnes Street - $S5.Q0 500,000 gallon tank located at 7400 Bayway - $95.00 500000 gallon tank located at 2220 west Hain - $95.00 2,000,000 gallon tank located at 2726 Massey Tompkins - $110.00 2. The OWNER agrees to pay the SNOXNXZR compensation for the services listed under Section B•, Items 1 A 2 of this AGRn- MENT for a fixed fee of $4,950.00. The CWAZR agrees to pay the ZNGZNEaR Compensation for the services listed under Sec- tion 8, Item 3 of this AGREEMENT on a time and expanses basis at the rates specified on Attachment A of this AGREEMENT. The ENOINXZR will provide the OWMg an estimate of these fees prior to proceeding with this phase of work. 3. The OW�iNA agrees to pay the aervie u XROX ERM compensation for the ea listed under Section C of this AGREEMENT for a fixed fee for each tank as follows: 500,000 gallon tank located at 3500 Baker Road - $7,350.00 (This fee does not include seismic upgrades, roof replacement or riser replacement.) Fixed fees for the following to performing these services: 500,000 gallon tank located at 500,000 gallon tank located a t 150,000 gallon tank located a t 40 500,000 gallon tank located a t 500400 gallon tank located a t 2100o,o0O gallon tank located page U tanks would be negotiated prior 607 East James Street 1208 park Street 300 Barnes Street 7400 Bayway 2220 West Main at 2726 Massey Tompkins of 23 NOV 11 '93 05:49PM TANK INDUSTRY HO TANK INDUSTRY HQ P.3 4. The OWMR agrees to pay the INGI ZER Compensation for the services listed under Section D of this AGREEMENT on a time and expenses basis at the rates specified on Attachment A of this AGREEMENT. The EUGIZZER will provide the OWNiA an estimate of these fees prior to proceeding with this phase of work. 5. The OWnit agrees to pay the ENOZNZZR compensation for the services listed under Section E of this AGREEMENT on a time and expenses basis at the-rates specified on Attachment A of this AGREEMENT. The SNOINBER will provide the owwXX an estimate of those fees prior to proceeding with this phase of work. The fees associated with Section E, Item 6 for the Baker Road Tank will be a fixed fee of $1,100.00. 6. All invoices for fixed fee work would be invoiced upon sub- mittal of prepared work. All invoices for time and expenses work would be invoiced on a biweekly schedule as the work is performed. 7. All invoices shall be paid within 30 days of submittal. IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their duly elected officials, this AGREEMENT in duplicate on the respective dates indicated below. TANK INDUSTRY CONSULTANTS, INC. s&lm HY Steven P. Roatterg P.E. president W l l 11 am 5. muuqjjt�y , vice president City of Baytown BY Pete C. Alfaro Mayor City of Baytown • WITNESS! Eileen Hall City Clerk Page 12 of 13 L • NOV 11 '93 05.49PM TANK INDUSTRY HQ TANK INDUSTRY HQ �1TTAC®[Ea1'T' A TANK INDUS'T'RY CONSULTANTS, INC. professional Services - Rate Structure Long Berm itesident observations Technician (travel and on -job time) $42.00 per hour ** Overtime Premium (over 40 hrs.week) $11.00 per hour Minimum 32 hours per week Per Diem $66.00 per day spot observations Technician (travel and Per Diem One Hour Senior Engine to each observation and report analysis on -job time) ar time added for dispatching interpretation P.4 $50.00 per hour** $65.00 per observation * These fees would be reduced by 54 for field work performed during December, January & February. Mileages (per vehicle) for both spot or resident observation - $0.30 per mile from Speedway, IN; Houston TX; Laurel, MD; Hauppauge. NY; or Orlando, FL. Travel. by public transportation at cost, plus 10$. Photographic documentation mounted and labeled - if requested by Owner - $3.00 per photograph. All other job related reimbursable expenses (not otherwise listed on this rata structure) at Cort plus 10$. 8ouriy Ratoss Operations Manager $53.00 /hour NACE Level III Certified Coating Inspector (I! Requested) Engineer - E.I.T. $56.00/hour Engineer - Registered $66.00 /hour Senior Registered Engineer $72.00 /hour principal Engineer $105.00 /hour (E. Crone Knoy, P.E.) Clerical hour $3g.0o / subcontract Laboratory Analysis: - Total Lead in Samples by Atomic Absorption Spectroscopy - $ 75.00 /sample - Total Metals (Barium, Cadmium, Chromium, Lead & Mercury) in Samples by Atomic Absorption Spectroscopy M $215.00 /sample - Leachable Lead in Samples by Toxicity Characteristic Leaching Procedure - $325.00 /sample TEE 2&T'EB LISTED IN ATTACEMT A OMLLL IMCREASE 5% ZN 1993, 1997, 1999 MW MRY oTBER YEAR TnR$A"ZR. \xyw \agrmnt \baytown.agr page 13 of 13