Loading...
Ordinance No. 6,845931028 -6 ORDINANCE NO. 6845 • AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH NOLASCO "S CARPENTRY FOR HOUSING REHABILITATION PROJECT #92 -06 AT 309 MORRELL STREET; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN, UP TO THE SUM OF TWO THOUSAND NINE HUNDRED FORTY AND N01100 DOLLARS ($2,940.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Nolasco's Carpentry for Housing Rehabilitation Project 092 -06 at 309 Morrell Street. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes payment up to the amount of TWO THOUSAND NINE HUNDRED FORTY AND N01100 DOLLARS ($2,940.00) to Nolasco's Carpentry for Change Order No. 1 for Housing Rehabilitation Project 192 -06 at 309 Morrell Street. Section 3: That pursuant to the provisions of Texas Local Government Code Annotated S 252.048, the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTEEN THOUSAND AND N01100 DOLLARS ($15,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty -five (25 %) or decreased by more than twenty -five (25 %) percent without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28th day of October, 1993. AA C � PETE C. AL FARO, Mayor ATTEST: EILEEN P. HALL, City Clerk 'W ACIO RAMIREZ, ISA,,. , City Attorney Iopvca W10-2&93eb0RDMtrensb • • Community Development Program Housing Rehabilitation Project Change Order Project# 92 -06 Date October 19, 1993 Homeowner Myrtis Ballard Contractor Nolasco's Carpentry Address 309 Morrell The following changes to the contract for this project are needed: 1. Remove existing a/c supply ducts and ceiling vents throughout structure, plenum, return air duct and grill. Remove closet door and frame, frame in to enclose a/c supply and air ducts (inside of closet) , reinstall closet rod and shelf, door frame, door and facings. $ 500.00 2. Install new sheet metal duct for return air, plenum, flex duct, adjustable ceiling vents, grill and filter. Sub - contracted out to a licensed a/c contractor. $ 1.220.00 3. Install 4 telephone jacks. Necessary to support Life Line (emergency call button). $ 60.00 4. Install new prefab kitchen countertop. $ 70.00 5. Install concrete to repair and level existing bathroom floor. $ 75.00 6. Install double 2" X 12" beam to remove, sag from livingroom ceiling. $ 150.00 7. Install new fresh water line from house to meter(approximately 50" of trenching and new water line). $ 275.00 8. Install light fixture and switch in dining area of livingroom to be separate from ceiling fan /light fixture. $ 65.00 TOTAL $ 2,415.00 EXHIBIT A UA Community Development Program Housing Rehabilitation Project Change Order Project # 92 -06 Date October 19, 1993 Homeowner Mortis Ballard Address 309 Morrell Contractor Nolasco's Carpentry The following items will be deleted from the work write -up: None 1 Original Contract Price $ 19,600.00 Cost of Change Order $ 2,415.00 New Contract Price $ 21,715.00 Approved by: Community Development Coordinator Director Planning & Community Development City Manager