Loading...
Ordinance No. 14,127ORDINANCE NO. 14,127 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 11 WITH ANGEL BROTHERS ENTERPRISES, LTD, FOR THE SAN JACINTO BLVD PHASE 1 PROJECT, INCREASING THE CONTRACT AMOUNT BY SEVENTY-EIGHT THOUSAND TWO HUNDRED EIGHTY-THREE AND NO!100 DOLLARS ($78,283.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 11 with Angel Brothers Enterprises, LTD, for the San Jacinto Blvd Phase 1 Project, increasing the contract amount by SEVENTY-EIGHT THOUSAND TWO HUNDRED EIGHTY-THREE AND NOI100 DOLLARS ($78,283.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 250' day of July, 2019. BRANDON CAPETILLO, Mayor ATT T: LETICIA BRYSCH, CI Clerk APPROVED AS TO FORM: [� ACIO RAMIREZ, S , ity Attorney C01317S01 LegahKarenTiles City Council Ordinances\2019Vuly 25 ChangeOrderNol 14San1acintoBlvdPhaselProject.doc Exhibit "A" CITY OF BAYTOWN Change Order No.11 BAYTOWN San Jacinto Blvd. Phase I 6/3/2019 PO # 1604797 Brief Description of Changes: This change order includes additional quantity of steel pipe installed, additional 6 months of'I'CP from the Hunt -Road Extension (not included on C62), and additional 6-6" conduit installed. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Steel Pipe 30" (Open Cut) (Excluded Carrier Pipe) (Item 70) 1 F 195.00 $ 345.00 $ 67,275.00 2 Traffic Control (Item 141) MO 6.00 $ 500.00 $ 3,000.00 3 6-6•• Conduit (Concrete Encased) (Item 194) LF 52.00 $ 154.00 $ 8,008.00 i otai Contract Summary, $ 78,283.00 Original Revised I 3 Original Contract Price ------------------- ------------------- Owner Contingency $15,160,363.45 $15,160,363.45 — I $525,000.00 $ - Previous Contingency authorization -------------- ----- -------- ---- L— -- $491,480.50 This Contingency authorization Remaining Contingence ( I $ _ ij $33,519.50 4 _— 5 Change Orders Previous Change Orders — —� -- This change order —I (Revised Contract Price I I $ — $15,685,363.451 $ 2,198,773.10 $ 78,283.00 $17,962,419.55 Original Contract Duration - Calendar Days 547 Previous Time Extensions 120 This Change Order 0 Kevised Contract Duration • Calendar Days 6/3/2019 Angel Brothers Enterprises, Ltd. Date 6-3-19 667 Engineering Director Date Kimley-Horn and Associates, Inc. Date City Manager Date ) q, ('Ab 0 19 Exhibit "A" CITY OF BAYTOWN Change Order No.11 BAYTOWN San Jacinto Blvd. Phase I "S_ 6/3/2019 PO a 1604797 Brief Description of Changes: "Phis change order includes additional quantity of steel pipe installed, additional 6 months of TCP from the Hunt Road Extension (not included on C62), and additional 6-6 conduit installed. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Steel Pipe 30" (Open Cut) (Excluded Carrier Pipe) (Item 70) LF 195.00 $ 345.00 $ 67,275.00 2 Traffic Control (Item 141) MO 6.00 $ 500.00 $ 3,000.00 3 6-6" Conduit (Concrete Encased) (Item 194) LF 52.00 $ 154.00 $ 8,008.00 Iota[ Contract Summary; $ 78,283.00 Original Revised 1 Original Contract Price $]5,160,363.45 $15,160,363.45 3 Owner Contingency I $525,000.00 $ - Previous Contingency authorization $491,480.50 This Contingency authorization -_ Remaining Contingency - $ + $33,519.50 4 Change Orders I Previous Change Orders } r I $ - $ 2,198,773.10 This change order $ 78,283.00 5 Revised Contract Price i $15,685,363.451 $17,962,419.55 Original Contract Duration - Calendar Days 547 Previous Time Extensions 120 This Change Order 0 Keviised Contract Duration • Calendar Days 6/3/2019 Angel Brothers Enterprises, Ltd. Date )rj/ 6-3-19 Kimley-Horn and Associates, Inc. Engineering Director Date City Manager Date Date . 1% 4, G/3h019 667