Loading...
Ordinance No. 5,964910820-2 ORDINANCE NO. 5964 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES FOR PHASE II OF THE 1990 -91 STREET IMPROVEMENT PROGRAM; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Angel Brothers Enterprises for Phase II of the 1990 -91 Street Improvement Program. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of SIXTY -SIX THOUSAND THREE HUNDRED FIFTY AND N01100 ($66,350.00) DOLLARS to Angel Brothers Enterprises for Change Order No. 1 for Phase II of the 1990 -91 Street Improvement Program. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 20th day of August, 1991. ETT O. HUTTO, Mayor ATTEST: r' EILEEN P. HALL, City Clerk ACIO RAMIREZ, JR ., City Attorney C:1:70:19 City of Baytown 1990/1991 Street Improvement Program Phase II Change Order #1 16 August 1991 Angel Brothers Enterprises, Inc. P.O. Box 570 Baytown, Texas 77520 Dear Sirs: The City of Baytown proposes to add the construction of a 4" water line and a 6" sewer line along Wright Street from Main Street to Fourth Street to the 1990/1991 Street Improvement Program Phase II. The following is a list of the items for this construction with the approximate quantity and unit prices for each item. Item Approx. Unit of Description Unit Extension No. Quant. Measure Price Al 1400 L.F. 4" PVC C -900 water line, open cut, all depths, standard bends as necessary, sand bedding, and metalized detector tape, CIP 9.00 12,600.00 A2 44 EACH Construction of new service, including tapping into the main, relocation of water meter, connection onto existing service line, all necessary fittings and materials, CIP 350.00 15,400.00 A3 2 EACH 6 "x4" tapping sleeve and valve, CIP 1000.00 2,000.00 A4 3 EACH 8 11x4" tapping sleeve and valve, CIP 1000.00 3,000.00 EMBIT A City of Baytown 1990/1991 Street Improvement Program Phase II Change Order #1 16 August 1991 page 2 Item Approx. Unit of Description Unit Extension No. Quant. Measure Price A5 1400 FEET 6" PVC SDR -35 sanitary sewer line, all depths, open cut, cement stabilized sand (1.5 sack /ton) backfill, and metalized detector tape, CIP 9.75 13,650.00 A6 4 EACH Pre -cast or cast in place sanitary sewer manhole and lid, CIP 800.00 3,200.00 A7 44 EACH Sanitary sewer service line, 4" PVC, Schedule 80, including connection to main line and any necessary fittings, CIP 375.00 16,500.00 TOTAL $66,350.00 On this project and the entire Street Improvement Program Phase II, you will be required to submit weekly certified pay rolls. These pay rolls will be reviewed in order to determine that your wages meet the latest wage scale of the Davis /Bacon Act. If you agree to the terms of this change order, please sign and return this document to the Engineering Department. A signed copy of the executed document will be sent to you. 7 Si cerely,_ ent Laza, .E. City Engineer City of Baytown 1990/1991 Street Improvement Phase II Change Order #1 16 August 1991 page 3 Contract Summary Original Contract Amount $ 926,787.00 Change Order #1 $ 66.350.00 Amended Contract Amount $ 993,137.00 APPROVED City of Baytown By: Title: Date: Program APPROVED Angel Brothers Enterprises, Inc. By: Title: Date;