Ordinance No. 5,964910820-2
ORDINANCE NO. 5964
AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL
BROTHERS ENTERPRISES FOR PHASE II OF THE 1990 -91 STREET
IMPROVEMENT PROGRAM; AND PROVIDING FOR THE EFFECTIVE
DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No. 1 with Angel Brothers Enterprises for Phase II
of the 1990 -91 Street Improvement Program. A copy of said change
order is attached hereto, marked Exhibit "A," and made a part
hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown
hereby authorizes the payment of SIXTY -SIX THOUSAND THREE HUNDRED
FIFTY AND N01100 ($66,350.00) DOLLARS to Angel Brothers
Enterprises for Change Order No. 1 for Phase II of the 1990 -91
Street Improvement Program.
Section 3: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown, this the 20th day of August,
1991.
ETT O. HUTTO, Mayor
ATTEST:
r'
EILEEN P. HALL, City Clerk
ACIO RAMIREZ, JR ., City Attorney
C:1:70:19
City of Baytown
1990/1991 Street Improvement Program
Phase II
Change Order #1
16 August 1991
Angel Brothers Enterprises, Inc.
P.O. Box 570
Baytown, Texas 77520
Dear Sirs:
The City of Baytown proposes to add the construction of a 4" water
line and a 6" sewer line along Wright Street from Main Street to
Fourth Street to the 1990/1991 Street Improvement Program Phase
II. The following is a list of the items for this construction
with the approximate quantity and unit prices for each item.
Item Approx. Unit of Description Unit Extension
No. Quant. Measure Price
Al 1400 L.F. 4" PVC C -900 water
line, open cut, all depths,
standard bends as necessary,
sand bedding, and
metalized detector tape,
CIP
9.00 12,600.00
A2 44 EACH Construction of new service,
including tapping into the
main, relocation of water
meter, connection onto
existing service line, all
necessary fittings and
materials, CIP
350.00 15,400.00
A3 2 EACH 6 "x4" tapping sleeve
and valve, CIP
1000.00 2,000.00
A4 3 EACH 8 11x4" tapping sleeve
and valve, CIP
1000.00 3,000.00
EMBIT A
City of Baytown
1990/1991 Street Improvement Program
Phase II
Change Order #1
16 August 1991
page 2
Item Approx. Unit of Description Unit Extension
No. Quant. Measure Price
A5 1400 FEET 6" PVC SDR -35 sanitary sewer
line, all depths, open cut,
cement stabilized sand
(1.5 sack /ton) backfill, and
metalized detector
tape, CIP
9.75 13,650.00
A6 4 EACH Pre -cast or cast in place
sanitary sewer manhole and
lid, CIP
800.00 3,200.00
A7 44 EACH Sanitary sewer service
line, 4" PVC, Schedule 80,
including connection to
main line and any
necessary fittings,
CIP
375.00 16,500.00
TOTAL $66,350.00
On this project and the entire Street Improvement Program Phase II,
you will be required to submit weekly certified pay rolls. These
pay rolls will be reviewed in order to determine that your wages
meet the latest wage scale of the Davis /Bacon Act.
If you agree to the terms of this change order, please sign and
return this document to the Engineering Department. A signed copy
of the executed document will be sent to you.
7 Si cerely,_
ent Laza, .E.
City Engineer
City of Baytown
1990/1991 Street Improvement
Phase II
Change Order #1
16 August 1991
page 3
Contract Summary
Original Contract Amount $ 926,787.00
Change Order #1 $ 66.350.00
Amended Contract Amount $ 993,137.00
APPROVED
City of Baytown
By:
Title:
Date:
Program
APPROVED
Angel Brothers Enterprises, Inc.
By:
Title:
Date;