Loading...
Ordinance No. 5,883910613-1 ORDINANCE NO. 5883 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH C.L. WINTER, INC. FOR THE WASTEWATER COLLECTION SYSTEM AND LIFT STATIONS ON STATE HIGHWAY 146 NORTH OF PIPELINE CORRIDOR CONTRACT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with C.L. Winter, Inc. for the wastewater Collection System and Lift Stations on State Highway 146 North of Pipeline Corridor Contract. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes Change Order No. 1 for the Wastewater Collection System and Lift Stations on state Highway 146 North of Pipeline Corridor Contract resulting in deduction of FORTY-ONE THOUSAND THREE HUNDRED SEVENTY AND 30/100 ($41,370.30) DOLLARS which reduces the original contract to FIVE HUNDRED TWENTY-FIVE THOUSAND THREE HUNDRED THIRTY AND 70/100 ($525,330.70) DOLLARS. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 13th day of June, 1991. 910613 -1a ATTEST EILEEN P. HALL, City Clerk P '/ (IGNACIO RAMIREZ, 0Attorney C: 1:66:1.6 NP June 11, 1991 Page 1 CHANGE ORDER NO. 1 Honorable Mayor and City Council City of Baytown, P. 0. Box 424 Baytown, Texas 77522 -0424 Subject: Request for approval of rates on labor and /or mate- rials and /or equipment. Contractor: C. L. Winter, Inc. Project: Construction of Wastewater Collection System and Lift Stations on State Hwy. 146 North of Pipeline Corridor, Job No. 044 -40, Contract No. 2 Original Contract Amount: $566,701.00 Honorable Mayor and City Council: This Change Order is required to delete Add Alternate No. 1 in its entirety and for adjustment of depth of line 1 -A from manhole 1 -A -4 to manhole 1 -A -5. The following items are to be deducted from the original amount bid: Bid Item Number Quantity Bid Unit Price Extension Add Alt. No. 1 -- $38,493.00 $38,493.00 No. 4 327 L.F. 21.60 7,063.20 No. 5 84 L.F. 22.70 1,906.80 No. 7 40 L.F. 43.00 1,720.00 No. 19 1 Ea. 725.00 725.00 No. 20 2.6 V.F. 25.00 65.00 No. 30 327 L.F. 2.40 784.80 Total Deduct $50,757.80 H13is A Change Order No. 1 June 11, 1991 Page 2 The following items are to be added to the original amount bid: Bid Item Number Quantity Bid Unit Price Extension No. 1 410 L.F. $ 13.50 $ 5,535.00 No. 6 40 L.F. 42.00 1,680.00 No. 19 1 EA. 725.00 725.00 No. 22 1 EA. 525.00 525.00 No. 29 410 L.F. 2.25 922.50 Total Added $ 9,387.50 Total Amount Deduct for Change Order No. 1 $(50,757.80) Total Amount Added for Change Order No. 1 $ 9,387.50 Total Amount Change Order No 1. $(41,370.30) Original Contract Amount $566.701.00 Revised Contract Amount $525,330.70 Change Order No. 1 represents a decrease of 7.30% of the original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. SUBMITTED FOR APPROVAL: ACCEPTED: LANGFORD ENGINEERING, INC. C. L. WINTER, INC. By: By: Doug LfnceforV C. Winter Manager of Field Services President Date '�Ov /2 -5/ Date APPROVED: CITY OF BAYTOWN, TEXAS By. Bobby Rountree City Manager Date