Ordinance No. 5,81491J314 -13
ORDINANCE NO. 5814
AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH
ALLCO, INC. FOR THE WEST ROMAN /WEST FRANCES STREET
SANITARY SEWER REHABILITATION PROJECT; AND PROVIDING FOR
THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No. 1 with Allco, Inc. for the West Homan /West
Frances Street Sanitary Sewer Rehabilitation Project. A copy of
said change order is attached hereto, marked Exhibit "A," and
made a part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown
hereby authorizes the payment of THIRTEEN THOUSAND FIFTY -TWO AND
N01100 ($13,052.00) DOLLARS to Allco, Inc. for Change Order No. 1
of the West Homan /West Frances Street Sanitary Sewer
Rehabilitation Project.
Section 3: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown, this the 14th day of March,
1991.
EMMETT 0. HUTTO, Mayor
ATTEST:
ii -
EILEEN P,-.,`HALL City Clerk
McLEMORE, Assistant City AtMo ney
C :1:17:13
910314 -13a
B
`fir .t Q
CITY OF BL XJ_ OWN
' y
.. � . vr.... �GMGt4.n. Xa+. £...:.,Y... c.'...1 .. !v�1r56r >,w: !�..w. n +�..aF J,' % �sVxr�:i �.SY �R.0 aaS�.. ,s. r. ✓s �,a r Ca�NV :J ✓,�.F.kiMt4':.i
U = 2401 MARKET P.O. BOX 424 BAYTOWN, TX 77522 -0424 (713) 422-8281
W. Homan/ W. Francis Street Sanitary
Sewer Rehabilitation Project
Job No. 9102 -28
Change Order No. 1
13 March 1991
Allco, Inc.
P.O. Box 3684
Beaumont, Texas 77704
The City of Baytown proposes to sl.ipline a 8" sanitary sewer
line in the backyard easement parallel to Mississippi and Britton
Street from Kentucky Street to 500' North of Kentucky Street. The
City proposes that the following line items be added to the project
for this purpose.
QUANTITIES TO
BE ADDED:
Item
Units of
Unit
No.
Ouant.
Measure
Description Price
Extension
3
2
Each
Point repairs to existing
sewer main, up to 20'
maximum length of
excavation, all
depths, CIP 1.00
2.00
6
50
L.F.
Trench and excavation
shoring for all depths
greater than 5 feet, in
accordance with OSHA
specifications 1.00
50.00
8
500
L.F.
Sliplining 7.125" 17.00
8,500.00
O.D. polyethylene
pipe liner in existing
8" sewer, including
intermediate manhole
tie -ins, Complete -
in -place (CIP)
9
9
Each
Service connection 400.00
3,600.00
to 6" sewer line and
liner, as per
specifications
910314 --13b
W. Homan/ W. Francis Street Sanitary
Sewer Rehabilitation Project
Job No. 9102 -28
Change Order No. 1
13 March 1991
page 2
Item Units of Unit
No. Ouant. Measure Description Price Extension
10 15 S.Y. Concrete driveway 5" thick
with 1" sand bedding
including saw cutting,
removal of existing
concrete, disposal and
excavation, CIP 60.00 900.00
TOTAL AMOUNT $ 13,052.00
If this change order meets with your approval, please sign in
the space provided below and return this document to the
Engineering Department. A signed copy will be sent to you.
Original Contract Amount $ 32,270.00
Change Order No. 1 $ 13,052.00
*Amended Contract Amount $ 45,322.00
*This figure represents an increase of 40.4% over the original
contract amount.
APPROVED
City of Baytown
By:
Title:
By:
Title:
Date: Date:
x4iz,'t'� -
Kent M. Laz P.E.
City Engine r
APPROVED
Allco, Inc.