Loading...
Ordinance No. 5,81491J314 -13 ORDINANCE NO. 5814 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH ALLCO, INC. FOR THE WEST ROMAN /WEST FRANCES STREET SANITARY SEWER REHABILITATION PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Allco, Inc. for the West Homan /West Frances Street Sanitary Sewer Rehabilitation Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of THIRTEEN THOUSAND FIFTY -TWO AND N01100 ($13,052.00) DOLLARS to Allco, Inc. for Change Order No. 1 of the West Homan /West Frances Street Sanitary Sewer Rehabilitation Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 14th day of March, 1991. EMMETT 0. HUTTO, Mayor ATTEST: ii - EILEEN P,-.,`HALL City Clerk McLEMORE, Assistant City AtMo ney C :1:17:13 910314 -13a B `fir .t Q CITY OF BL XJ_ OWN ' y .. � . vr.... �GMGt4.n. Xa+. £...:.,Y... c.'...1 .. !v�1r56r >,w: !�..w. n +�..aF J,' % �sVxr�:i �.SY �R.0 aaS�.. ,s. r. ✓s �,a r Ca�NV :J ✓,�.F.kiMt4':.i U = 2401 MARKET P.O. BOX 424 BAYTOWN, TX 77522 -0424 (713) 422-8281 W. Homan/ W. Francis Street Sanitary Sewer Rehabilitation Project Job No. 9102 -28 Change Order No. 1 13 March 1991 Allco, Inc. P.O. Box 3684 Beaumont, Texas 77704 The City of Baytown proposes to sl.ipline a 8" sanitary sewer line in the backyard easement parallel to Mississippi and Britton Street from Kentucky Street to 500' North of Kentucky Street. The City proposes that the following line items be added to the project for this purpose. QUANTITIES TO BE ADDED: Item Units of Unit No. Ouant. Measure Description Price Extension 3 2 Each Point repairs to existing sewer main, up to 20' maximum length of excavation, all depths, CIP 1.00 2.00 6 50 L.F. Trench and excavation shoring for all depths greater than 5 feet, in accordance with OSHA specifications 1.00 50.00 8 500 L.F. Sliplining 7.125" 17.00 8,500.00 O.D. polyethylene pipe liner in existing 8" sewer, including intermediate manhole tie -ins, Complete - in -place (CIP) 9 9 Each Service connection 400.00 3,600.00 to 6" sewer line and liner, as per specifications 910314 --13b W. Homan/ W. Francis Street Sanitary Sewer Rehabilitation Project Job No. 9102 -28 Change Order No. 1 13 March 1991 page 2 Item Units of Unit No. Ouant. Measure Description Price Extension 10 15 S.Y. Concrete driveway 5" thick with 1" sand bedding including saw cutting, removal of existing concrete, disposal and excavation, CIP 60.00 900.00 TOTAL AMOUNT $ 13,052.00 If this change order meets with your approval, please sign in the space provided below and return this document to the Engineering Department. A signed copy will be sent to you. Original Contract Amount $ 32,270.00 Change Order No. 1 $ 13,052.00 *Amended Contract Amount $ 45,322.00 *This figure represents an increase of 40.4% over the original contract amount. APPROVED City of Baytown By: Title: By: Title: Date: Date: x4iz,'t'� - Kent M. Laz P.E. City Engine r APPROVED Allco, Inc.