Ordinance No. 5,184890112 -15 ORDINANCE 5184 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 1 WITH SUGAR LAND REHAB, INC. FOR THE 1988 SANITARY SEWER SLIPLINING PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Sugar Land Rehab, Inc. for the 1988 Sanitary Sewer Sliplining Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment of FOURTEEN THOUSAND TWO HUNDRED TWENTY AND N01100 ($14,220.00) DOLLARS to Sugar Land Rehab, Inc. for Change Order No. 1 of the 1988 Sanitary Sewer Sliplining Project. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ City Council of the January, 1989. and PASSED by the affirmative vote of the City of Baytown, this the 12th day of EMMETT 0. HUTTO, Mayor ATTEST: EILEEN P. HALL, City Clerk RANDALL B. STRONG, City orney C:1:23:16 1988 Sanitary Sewer Sliplining Project Job No. 8811 -10 Change Order No. 1 January 9, 1989 Sugar Land Rehab. Inc. P.O. Box 1504 Sugar Land, Texas 77478 Dear Mr. Geary: The City of Baytown proposes to add the following quantities to the 1988 Sanitary Sewer Sliplining Project: Item Approx. Unit of Description Unit Extension No. Ouant. Measure Price 3 1580 l.f. Sliplining 7.125% O.D. 9.00 $ 14,220.00 polyethylene pipe liner in existing 8" sewer, including manhole tie -ins, CIP 13 0 each Point repairs where 200.00 0.00 sliplining is impossible due to short sections of undersized pipe installed by City maintenance crews, for lines added under this change order only, if necessary, CIP The additional work noted above is to be performed in two locations. They are as follows: a. Felton Street from the easement between James and Murrill to the easement between Murrill and Sterling. The majority of this line is under Felton Street. Approx. length = 350 ft. No taps. b. Ward Road beginning approx. 200 ft. west of Fifth St. to Hwy 146. Approx. length = 1230 ft. No taps. If this Change Order meets with your approval, please sign below and return this document to the Engineering Department. A signed copy will be sent to you. Original Contract Amount $ 105,710.00 Sincerely, Change Order No. 1 _4,220.00 Ammended Contract Amount 119,930.00 APPROVED City of Baytown By: By: Title: Norman Dykes, P.E. City Engineer /Dir. of Public Works APPROVED Sugar Land Rehab, Inc. Title: Date: Date: