Ordinance No. 5,093SI 1: ORDINANCE NO. 5093 ® AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 18 TO THE CONTRACT WITH BASIC CONSTRUCTORS, INC. FOR THE ENLARGEMENT OF THE CENTRAL SEWER DISTRICT WASTEWATER TREATMENT PLANT, EPA GRANT PROJECT NO. C- 48- 1498 -03 (CONTRACT NO. 1). 0 11 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 18 to the Contract with Basic Constructors, Inc. for the enlargement of the Central Sewer District Wastewater Treatment Plant, EPA Grant Project No. C -48- 1498 -03 (Contract No. 1). A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately, from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ City Council of the September, 1988. and PASSED by the affirmative vote of the City of Baytown, this the 8th day of (F"ETT • HUTTO, Mayor ATTEST: EILEEN P. HALL, tity Clerk NDALL B-. STRONG, City A orney C:1:13:6 I a, 9 C Mayor Emmett O. Hutto ® and City Counci.l City of Baytown 2401 Market Street Baytown, Texas 77520 CHANGE ORDER NO. 18 August 31, 1988 SUBJECT: Request for Approval of Rates on Labor and /or Materials and /or Equipment CONTRACTOR: Basic Constructors, Inc. PROJECT: Construction of Central Sewer District Wastewater Treatment Plant EPA Project No. C -48- 1498 -03 Job No. 044 -33, Contract No. 1 ORIGINAL CONTRACT AMOUNT: $5,378,600.00 Dear Mayor and City Council: Your approval is requested on the following modifications and /or changes to subject project. These added costs will be applied to the above Contract. Description Cost 1. Replacement of severely deteriorated air drops/ diffusers in sludge holding tank. The existing air drops/ diffusers were installed i.n 1967. When this basin was dewatered for construction of adjoining improvements it was found that the ai.r pi.pi.ng system had numerous holes due to corrosion, diffusers were either mi.ssi.ng or broken and that there were no salvageable, usable components. The work to be per- formed is shown on the attached sheet 43 of 67 entitled Sludge Holding T an k and Sludge Thickner Modi.fi.ed Plan" g dated April 1985. The proposed work consists of 13 air header assemblies (4" galy. pipe) w /MS diffusers. Remove existing header to valve. Install new headers with saddle supports, install diffusers, install 4" valves and paint saddle supports. ® Agreed Lump Sum $26,429.00 Extensi.on of Time for the above additional work 89 Calendar Days r1 U 11, ® Change Order No. 18 August 31, 1988 044 -33 #1 Page 2 Your approval is also requested on the following request for Exten- sion of Time due to inclement weather for days noted hereinafter. These calendar days will be applied to the above contract. H Friday June 24, 1988 Tuesday July 5, 1988 Wednesday July 6, 1988 Thursday July 7, 1988 Tuesday July 19, 1988 Thursday July 21, 1988 Extension of Time for inclement weather /adverse site conditions, 6 calendar days. Total Additional Cost this Change Order No. 18 Plus Cost of Prior Change Orders Overrun Supplemental Bid Items as of July 31, 1988 Original Contract Amount Revised Contract Amount Original Completion Date Extension of Time this Change Order No. 18 Pius Prior Extensions of Time Revised Completion Date (All work excluding Change Order No. 17) $ 26,429.00 $ 179,636.00 $ 6,750.00 $5,378,600.00 $5,591,415.00 May 24, 1988 95 Calendar Days 51 Calendar Days October 17, 1988 Change Orders No. 1 thru No. 18 plus Supplemental Bid Items Over- runs represent an increase of 3.96% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. E, 0 Ell, h Change Order No. 18 044 -33 #1 RECOMMENDED FOR APPROVAL: LANGFORD ENGINEERING, INC. 1 By: Doug Leincdford Manager of Fiel Services Date. - 1311- APPROVED: CITY OF BAYTOWN BY= Fritz Lanham City Manager Date: August 31, 1988 Page 3 ACCEPTED: BASIC CONSTRUCTORS, INC. By: ager Date i E, r1 J rc COST OR PRICE SUMMARY FORMAT FOR SUBAGREEMENTS UNDER U.S. EPA GRANTS Form Approve-d (See accompanying instructions before completing this form) OMB No. 158- ROI.44 PART 1•GENERAL 1. GRANTEE 2. GRANT NUMBER C -46 - l498 -03 FADDRESS ONTRA TOR OR SUBCONTRACTOR 4. DATE OF PROPOSAL Cav�s c?-;00S �r�F CONTRACTOR OR SUBCONTRACTOR (Include ZIP code) 6. TYPE qF fERVICE TO FURNISHED 5327 � l.C.f.,v sT t� o• So X 777 A/0 as rM l -rY- 77Z74 PART 11-COST SUMMARY 7. DIRECT LABOR (Specify labor categories) MATED NOURLY ESTIMATED ___ HOURS RATE COST TOTALS DIRECT LABOR TOTAL: a. INDIRECT COSTS (Specify indirect cost pools) RATE INDIRECT COSTS TOTAL: I :. 9. OTHER DIRECT COSTS a. TRAVEL (1) TRANSPORTATION (2) PER DIEM TRAvELSUBTOTAL: b. EQUIPMENT, MATERIALS, SUPPLIES (Specify categories) v 5 -- 191.217 �. r " , W: 1Z. 07 ED yTf• �` ■ BASE = ESTIMATED COST sZo. /3 `VSUBCONTRACTS tST01 00 SUBTOTA ESTIMATED COST QTY I COST ESTIMATED COST j EQUIPMENT SUBTOTAL. -•r -- 191.217 ► Y, C. SUBCONTRACTS ED yTf• �` `VSUBCONTRACTS tST01 SUBTOTA d. OTHER (Speclty crtegoriee) ESTIMATED COST '}�1"��+s�s = : it Xr .�] r0FIT 6OTHER SUBTOTAL: � — • e. OTHER DIRECT COSTS TOTALt,�,�.• IMATED COST 2 ICE . EPA Form 5700.41 (2.76) PAGE I OF 5 C7 i' U 11 r 6