Loading...
Ordinance No. 5,06380728 -3 ORDINANCE NO. 5063 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, FINDING THAT AN EMERGENCY SITUATION EXISTS; AND AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH ANGEL BROTHERS ENTERPRISES, INC. FOR THE CRAIGMONT FORCE MAIN PROJECT. ® WHEREAS, while the Craigmont Force Main Project was under construction, several breaks in a related sewer line occurred; and WHEREAS, an emergency situation exists, in that the broken line needs to be repaired or replaced as soon as possible in order to' provide sewer service to the areas being served by the broken line; and WHEREAS, failure to repair or replace this line will result in the discharge of raw sewage into a residential area; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: City Council hereby declares that an emergency exists that necessitates approval of a change order in excess of fifty percent of the original contract. Section 2: That the City Council does hereby authorize Change Order No. 1 to the Contract with Angel Brothers Enterprises, Inc. for the Craigmont Force Main Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 28th day of July, 1988. �Z�Z- �2-o METT 0. HUTTO, Mayor v C LL 0 ATTEST: ® EILEEN P. HALL, City Clerk RANDALL B. STAtrNG, Ci Attorney C:1:10:7 :7 n U v n v r1 L J • K] w`�rs BAYTOWN POST OFFICE BOX 424 • TELEPHONE 422 -8281 • AREA CODE 713 • BAYTOWN, TEXAS 77522 CRAIGMONT FORCE MAIN PROJECT CHANGE ORDER NUMBER 1 Job No. 8805 -26 July 22, 1988 Angel Brothers Enterprises, Inc. P.O. Box 570 Baytown, Texas 77522 tr y ks�i. Gentlemen: The City of Baytown proposes to ADD the following items and quantities to the contract noted above. These additions are required to extend the proposed force main approximately 700 feet down Baker Road to a manhole in the street. HIBIT A Item Approx. Unit of Unit No. Quant. Measure Description Price Extension la 700 L.F. Additional 10" force main 13.75 $ 9,625.00 across street lanes and through the median, CIP 3 360 S.F. Removal and disposal of 3.00 1,080.00 concrete pavement, CIP 4 240 L.F. 2" sawcut, CIP 4.00 960.00 5 1 EACH Tie -in to existing manhole, 1500.00 1,500.00 including drop structure, CIP 6 42 TONS Cement stabilized sand, 1.5 15.00 630.00 sks. per ton, CIP 7 360 S.F. Replacement of concrete 7.00 2,520.00 pavement, 7 sks per ton, CIP 8 1 LUMP Installation and maintenance 1500.00 1,500.00 SUM of all necessary barricades to meet MUTCD standards, CIP ® 9 14 TONS Crushed limestone, as 25.00 350.00 required by the engineer, CIP $ 18,165.00 HIBIT A C] [A C7 Craigmont Force Main Project Contract Summary Original Contract Amount Change Order No. 1 Ammended Contract Amount $ 24,687.50 18.165.00 (73.6% of original) $ 42,852.50 page 2 If this Change Order meets with your approval, please sign below and return this document to the Engineering Department of the City of Baytown. A signed copy will be sent to you. APPROVED City of Baytown By: 44t���� Title: (/ Date: Sincerely yours, Kent M. Laza Assistant City Engineer APPROVED Angel Brothers Enterprises,T- . ^ . By: Title: - Date: % T 0 • � B I 0 July 21, 1988 r� U ANGEL BROTHERS ENTERPRISES, INC. P.O. BOX 570 BAYTOWN. TEXAS 77522 PHONE 713 - 421. 5721/421.2731 HOUSTON 713 - 471 -6730 City Engineer City of Baytown P. 0. Box 424 Baytown, Texas 77522 RE: Craigmont Force Main Attention: Kent Laza Gentlemen: As per our field visit, listed below are items involved in extending the force main to the manhole near_Gbose Creek Drive. SCOPE OF WORK: 1. Additional 10" PVC force main 2. Remove Concrete Pavement 3. 2" Sawcut 4. Tie to Manhole with Drop 5. Cement Stabilized Sand 6. Replace Concrete Pavement 7. Barricades 8. Limestone if Required 70OLF @ 13.75 9625.00 360SF @ 3.00 1080.00 240LF @ 4.00 960.00 1LS @1500.00 1500.00 42TNS @ 15.00 630.00 360SF @ 7.00 2520.00 1LS @1500.00 1500.00 14TN @ 25.00 350.00 $18165.00 The 10" Force Main is higher because we cannot get the production in the esplanade that we get on the original bid. Sincer Y. Angel B o hers Enterprises,Inc. Terry D. Williamson, Chief Estimator LJ v •