ORDINANCE NO. 5063
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, FINDING THAT AN EMERGENCY SITUATION EXISTS; AND
AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH
ANGEL BROTHERS ENTERPRISES, INC. FOR THE CRAIGMONT
FORCE MAIN PROJECT.
® WHEREAS, while the Craigmont Force Main Project was under
construction, several breaks in a related sewer line occurred;
and
WHEREAS, an emergency situation exists, in that the broken
line needs to be repaired or replaced as soon as possible in
order to' provide sewer service to the areas being served by the
broken line; and
WHEREAS, failure to repair or replace this line will result
in the discharge of raw sewage into a residential area; NOW
THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: City Council hereby declares that an emergency
exists that necessitates approval of a change order in excess of
fifty percent of the original contract.
Section 2: That the City Council does hereby authorize
Change Order No. 1 to the Contract with Angel Brothers
Enterprises, Inc. for the Craigmont Force Main Project. A copy
of said change order is attached hereto, marked Exhibit "A," and
made a part hereof for all intents and purposes.
Section 3: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown, this the 28th day of July,
1988.
�Z�Z- �2-o
METT 0. HUTTO, Mayor
v
C
LL
0 ATTEST:
® EILEEN P. HALL, City Clerk
RANDALL B. STAtrNG, Ci Attorney
C:1:10:7
:7
n
U
v
n
v
r1
L J
•
K]
w`�rs
BAYTOWN
POST OFFICE BOX 424 • TELEPHONE 422 -8281 • AREA CODE 713 • BAYTOWN, TEXAS 77522
CRAIGMONT FORCE MAIN PROJECT
CHANGE ORDER NUMBER 1
Job No. 8805 -26
July 22, 1988
Angel Brothers Enterprises, Inc.
P.O. Box 570
Baytown, Texas 77522
tr
y ks�i.
Gentlemen:
The City of Baytown proposes to ADD the following items and quantities to
the contract noted above. These additions are required to extend the proposed
force main approximately 700 feet down Baker Road to a manhole in the street.
HIBIT A
Item
Approx.
Unit of
Unit
No.
Quant.
Measure
Description
Price
Extension
la
700
L.F.
Additional 10" force main
13.75
$ 9,625.00
across street lanes and
through the median, CIP
3
360
S.F.
Removal and disposal of
3.00
1,080.00
concrete pavement, CIP
4
240
L.F.
2" sawcut, CIP
4.00
960.00
5
1
EACH
Tie -in to existing manhole,
1500.00
1,500.00
including drop structure, CIP
6
42
TONS
Cement stabilized sand, 1.5
15.00
630.00
sks. per ton, CIP
7
360
S.F.
Replacement of concrete
7.00
2,520.00
pavement, 7 sks per ton, CIP
8
1
LUMP
Installation and maintenance
1500.00
1,500.00
SUM
of all necessary barricades
to meet MUTCD standards, CIP
®
9
14
TONS
Crushed limestone, as
25.00
350.00
required by the engineer, CIP
$ 18,165.00
HIBIT A
C]
[A
C7
Craigmont Force Main Project
Contract Summary
Original Contract Amount
Change Order No. 1
Ammended Contract Amount
$ 24,687.50
18.165.00 (73.6% of original)
$ 42,852.50
page 2
If this Change Order meets with your approval, please sign below and
return this document to the Engineering Department of the City of Baytown. A
signed copy will be sent to you.
APPROVED
City of Baytown
By: 44t����
Title: (/
Date:
Sincerely yours,
Kent M. Laza
Assistant City Engineer
APPROVED
Angel Brothers Enterprises,T- . ^ .
By:
Title: -
Date: % T
0
•
� B I
0 July 21, 1988
r�
U
ANGEL BROTHERS ENTERPRISES, INC.
P.O. BOX 570
BAYTOWN. TEXAS 77522
PHONE 713 - 421. 5721/421.2731
HOUSTON 713 - 471 -6730
City Engineer
City of Baytown
P. 0. Box 424
Baytown, Texas 77522
RE: Craigmont Force Main
Attention: Kent Laza
Gentlemen:
As per our field visit, listed below are items involved in extending the
force main to the manhole near_Gbose Creek Drive.
SCOPE OF WORK:
1. Additional 10" PVC force main
2. Remove Concrete Pavement
3. 2" Sawcut
4. Tie to Manhole with Drop
5. Cement Stabilized Sand
6. Replace Concrete Pavement
7. Barricades
8. Limestone if Required
70OLF
@
13.75
9625.00
360SF
@
3.00
1080.00
240LF
@
4.00
960.00
1LS
@1500.00
1500.00
42TNS
@
15.00
630.00
360SF
@
7.00
2520.00
1LS
@1500.00
1500.00
14TN
@
25.00
350.00
$18165.00
The 10" Force Main is higher because we cannot get the production in the
esplanade that we get on the original bid.
Sincer Y.
Angel B o hers Enterprises,Inc.
Terry D. Williamson, Chief Estimator