Ordinance No. 5,062AN ORDINANCE OF THE
AUTHORIZING CHANGE
BUFFALO EXCAVATING
DEVELOPMENT PROJECT:
80728 -2
ORDINANCE NO. 5062
CITY COUNCIL OF THE CITY OF BAYTOWN
ORDER NO. 2 TO THE CONTRACT WITH
AND PAVING FOR THE 1987 COMMUNITY
ELM STREET.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No. 2 to the Contract with Buffalo Excavating and
Paving for the 1987 Community Development Project: Elm Street.
A copy of said change order is attached hereto, marked Exhibit
"A," and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown, this the 28th day of July,
1988.
ATTEST:
EILEEN P. HALL, City Clerk
RANDALL B. STRONG, City torney
C:1:10:4
T 0. HUTTO, Mayor
X , . . - 4 4 r� , X , J, ✓ 'k /... t.- ".
7
9
b
r
+i rL
BAYTOWN
POST OFFICE BOX 424 TELEPHONE 422 -8281 • AREA CODE 713 •
BAYTOWN, TEXAS 77522
1987 COMMUNITY DEVELOPMENT PROGRAM
CHANGE ORDER NUMBER 2, JOB NO. 8711
-04
®
July 20, 1988
Buffalo Excavating
and Paving
13936 E. Freeway
Houston, Texas
77015
Gentlemen:
The City
of Baytown proposes to ADD the following quantities
to the
contract noted
above. These additions are for the
paving
and drainage
improvements to
Miriam Street between Elm and Yaupon Streets.
Item Approx.
Unit of
Unit
No. Ouant.
Measure Description
Price
Extension
1 600
s.y. 6" thick reinforced concrete
13.91
$ 8,346.00
pavement as per specs,
Complete -in -Place (CIP)
2 680
s.y. 6" thick lime stabilized
2.17
1,475.60
subgrade including lime
application, CIP
3 300
l.f. 6" reinforced concrete curb,
1.05
315.00
CIP
4 1500
s.f. 5" thick reinforced concrete
1.56
2,340.00
driveway as per specs., CIP
5 1200
s.f. Concrete sidewalk 4" thick
1.17
119404.00
with 1" sand bedding, CIP
11 405
l.f. 24" Diameter RCP storm sewer,
28.60
11,583.00
ASTM C76 with Type "A"
bedding and backfill, All
cuts, CIP
13a 2
each Standard Junction box as per
550.00
1,100.00
specifications, Stage I, CIP
13b 2
each Standard Junction box as per
550.00
1,100.00
specifications, Stage II, CIP
17 155
l.f. Removal and hauling of
2.60
403.00
existing storm sewer pipe,
CIP
18 180
s.y. Removal and hauling of
4.75
855.00
existing sidewalk and
driveway, CIP
$ 28,921.60
EXHIN A
c:
0
0
•
E
P
1987 Community Development Program (cont.)
Contract Summary
Original Contract Amount 217,486.00
Change Order No. 1 1,405.00
Change Order No. 2 XU, 921.60
Amended Contract Amount
$ 247,812.60
page 2
If this Change Order meets with your approval, please sign below and
return this document to the Engineering Department, City of Baytown. A signed
copy will be sent to you.
APPROVED
,eCityof Baytown
By:
Title:
Date: ��►� �!
Sincerely yours, /
Kent M. Laza
Assistant City Engineer
Project Engineer
APPROVED
Buffal Excavating Paving
By:
Title: Yfac pQ.+L z ./�f Date: -7/11 18#