Loading...
Ordinance No. 5,062AN ORDINANCE OF THE AUTHORIZING CHANGE BUFFALO EXCAVATING DEVELOPMENT PROJECT: 80728 -2 ORDINANCE NO. 5062 CITY COUNCIL OF THE CITY OF BAYTOWN ORDER NO. 2 TO THE CONTRACT WITH AND PAVING FOR THE 1987 COMMUNITY ELM STREET. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 to the Contract with Buffalo Excavating and Paving for the 1987 Community Development Project: Elm Street. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 28th day of July, 1988. ATTEST: EILEEN P. HALL, City Clerk RANDALL B. STRONG, City torney C:1:10:4 T 0. HUTTO, Mayor X , . . - 4 4 r� , X , J, ✓ 'k /... t.- ". 7 9 b r +i rL BAYTOWN POST OFFICE BOX 424 TELEPHONE 422 -8281 • AREA CODE 713 • BAYTOWN, TEXAS 77522 1987 COMMUNITY DEVELOPMENT PROGRAM CHANGE ORDER NUMBER 2, JOB NO. 8711 -04 ® July 20, 1988 Buffalo Excavating and Paving 13936 E. Freeway Houston, Texas 77015 Gentlemen: The City of Baytown proposes to ADD the following quantities to the contract noted above. These additions are for the paving and drainage improvements to Miriam Street between Elm and Yaupon Streets. Item Approx. Unit of Unit No. Ouant. Measure Description Price Extension 1 600 s.y. 6" thick reinforced concrete 13.91 $ 8,346.00 pavement as per specs, Complete -in -Place (CIP) 2 680 s.y. 6" thick lime stabilized 2.17 1,475.60 subgrade including lime application, CIP 3 300 l.f. 6" reinforced concrete curb, 1.05 315.00 CIP 4 1500 s.f. 5" thick reinforced concrete 1.56 2,340.00 driveway as per specs., CIP 5 1200 s.f. Concrete sidewalk 4" thick 1.17 119404.00 with 1" sand bedding, CIP 11 405 l.f. 24" Diameter RCP storm sewer, 28.60 11,583.00 ASTM C76 with Type "A" bedding and backfill, All cuts, CIP 13a 2 each Standard Junction box as per 550.00 1,100.00 specifications, Stage I, CIP 13b 2 each Standard Junction box as per 550.00 1,100.00 specifications, Stage II, CIP 17 155 l.f. Removal and hauling of 2.60 403.00 existing storm sewer pipe, CIP 18 180 s.y. Removal and hauling of 4.75 855.00 existing sidewalk and driveway, CIP $ 28,921.60 EXHIN A c: 0 0 • E P 1987 Community Development Program (cont.) Contract Summary Original Contract Amount 217,486.00 Change Order No. 1 1,405.00 Change Order No. 2 XU, 921.60 Amended Contract Amount $ 247,812.60 page 2 If this Change Order meets with your approval, please sign below and return this document to the Engineering Department, City of Baytown. A signed copy will be sent to you. APPROVED ,eCityof Baytown By: Title: Date: ��►� �! Sincerely yours, / Kent M. Laza Assistant City Engineer Project Engineer APPROVED Buffal Excavating Paving By: Title: Yfac pQ.+L z ./�f Date: -7/11 18# of EXHUT A C • 5