Ordinance No. 5,029ORDINANCE NO. 5029 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. 17 TO THE CONTRACT WITH. BASIC CONSTRUCTORS FOR THE CENTRAL DISTRICT EPA GRANT PROJECT (CONTRACT NO. 1) . BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 17 to the Contract with Basic Constructors for the Central District EPA Grant Project (Contract No. 1). A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 9th day of June, 1988. 4ETT 0. HUTTO, Mayor ATTEST: EILEEN P. HALL, City C1 rk UIZANDALL STR NG, Cit ttorney C:1:7:3 El 0 Ell �11 :7 CHANGE ORDER NO. 17 June 3, 1988 ® Mayor Emmett O. Hutto and City Council City of Baytown 2401 Market Street Baytown, Texas 77520 SUBJECT: Request for Approval of Rates on Labor and /or Materials and /or Equipment CONTRACTOR: Basic Constructors, Inc. PROJECT: Construction of Central Sewer District Wastewater Treatment Plant EPA Project No. C- 48- 1498 -03 Job No. 044 -33, Contract No. 1 ORIGINAL CONTRACT AMOUNT: $5,378,600.00 Dear Mayor and City Council: Your approval is requested on the following modifications and /or changes to subject project. These added costs will be applied to the above Contract. Description 1. Replacement of severely deteriorated rectangular tank sludge collector mechanism for Chlorine Con- tact Chamber Quiescent Basins No. 1 and No. 2 in accordance with the attached technical specifica- tion (Item No. S105 - Rectangular Tank Sludge Collector Mechanism and Special Provision No. 1 to Item No. S105) and the attached drawing (Sheet No. 38A of 67 entitled Exist. Chlorine Contact Chamber Quies. Basins No. 1 and No. 2 (Sections and Details) and all applicable contractual requirements. Due to the long delivery time for receiving this ® particular equipment the Contract Conditions are amended as follows: C7 Cost n Ell I u Change Order No. 17 044 -33 #1 June 3, 1988 Page 2 Description ® 1. City will dewater and remove sludge from each basin; only one basin will be out of service at any time. First basin to be ready for Con- tractor's equipment installation within five working days after equipment is delivered to jobsite. 2. Contractor shall complete installation includ- ing manufacturer's check -out, field painting, electrical connections, etc. within five weeks after equipment is delivered to the job site. 3. The amount of time required to order and receive the required equipment is currently unknown. Therefore, the extension of time required for performing this Change Order No. 17 cannot be specifically set forth as a given number of calendar days; rather, it is con- nected to equipment delivery as set forth in 2. above. 4. This extension of time applies only for Change Order No. 17. 5. Contract completion date for all work, exclud- ing Change Order No. 17, will be in accordance with Contractural Requirements. 6. Warranty of equipment, materials, and workman- ship for all work, excluding Change Order No. 17, will be in accordance with Contractural Requirements. Warranty for Change Order No. 17 will be for one year after all the work required by Change Order No. 17 has been complete. 7. Upon completion of work, excluding Change Order No. 17, and acceptance of the work by the City Council of the City of Baytown, and subject to the approval of the Contractor's security, the retainage will be reduced to One Thousand Dollars ($1,000.00). The retainage, ® plus the sum due under this change order will be paid in full to the Contractor when Change Order No. 17 has been completed and accepted by the City Council of the City of Baytown. Cost E Change Order No. 17 044 -33 #1 Description ® Agreed Lump Sum Total Additional Cost this Change Order No. 17 Plus Cost of Prior Change Orders Overrun Supplemental Bid Items as of May 31, 1988 Original Contract Amount Revised Contract Amount Original Completion Date Extension of Time this Change Order No. 17 Plus Prior Extensions of Time Revised Completion Date (All work excluding Change Order No. 17) June 3, 1988 Page 3 Cost $ 62,757.00 $ 62,757.00 $ 116,879.00 $ 1,605.00 $5,378,600.00 $5,559,841.00 May 24, 1988 Not Applicable 51 Calendar Days July 14, 1988 Change Orders No. 1 thru No. 17 plus Supplemental Bid Items Overruns represent an increase of 3.37% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. Ell 9 K] Change Order No. 17 June 3, 1988 044 -33 #1 Page 4 RECOMMENDED FOR APPROVAL: LANGFORD ENGINEERING, INC. By: 6, A'�' &-im ; Doug VtYn6efor6 Manager of Field Services Date: APPROVED: CITY OF BAYTOWN By: Fritz Lanham City Manager Date: ACCEPTED: BASIC CONSTRUCTORS, INC. By: Brian Fruge' Project Manager Date: E 1�1