Ordinance No. 5,028:1.1•
ORDINANCE NO. 5028
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN
AUTHORIZING CHANGE ORDER NO. 16 TO THE CONTRACT WITH
BASIC CONSTRUCTORS FOR THE CENTRAL DISTRICT EPA GRANT
PROJECT (CONTRACT NO. 1).
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No. 16 to the Contract with Basic Constructors for
the Central District EPA Grant Project (Contract No. 1). A copy
of said change order .s attached hereto, marked Exhibit "A," and
made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the
City Council of the City of Baytown, this the 9th day of June,
1988.
4M 0. HUTTO, Mayor
ATTEST:
EILEEN P. HALL, City Clerk
RANDALL B. ST ONG, Ci Attorney
C:1:7:2
11
k
f
0
11
El
C
CHANGE ORDER NO. 16
® May 26, 1988
Mayor Emmett O. Hutto
and City Council
City of Baytown
2401 Market Street
Baytown, Texas 77520
C
SUBJECT: Request for Approval of Rates on Labor and /or Materials
and /or Equipment
CONTRACTOR: Basic Constructors, Inc.
PROJECT: Construction of Central Sewer
District Wastewater Treatment Plant
EPA Project No. C -48- 1498 -03
Job No. 044 -33, Contract No. 1
ORIGINAL CONTRACT AMOUNT: $5,378,600.00
Dear Mayor and City Council:
Your approval is requested on the following modifications and /or
changes to subject project. These added costs will be applied to
the above Contract.
Description
1. Replacement of severely deteriorated air drops/
diffusers in Chlorine Contact Chamber Mixing
Basins No. 1 and No. 2. The existing air drops/
diffusers were installed in 1973. When these two
basins were dewatered for construction of adjoin-
ing improvements it was found that the air piping
system had numerous holes due to corrosion, dif-
fusers were either missing or broken and that
there were no salvageable, usable components.
The work to be performed is shown on the attached
sheet 1 of 1 entitled "Chlorine Chamber Air Dif-
fusion Modification" dated May 24, 1988. The
following services and /or materials are being
® provided by the City; 1) removal of existing air
diffusion system to the flange immediately out-
side the face of the wye -wall, 2) forty -eight
Cost
Ell
�11
Ell
Change Order No. 16
® 044 -33 #1
Description
® each 1" O.D. 16 ga., 304 S.S. tubing by 13' -6"
long threaded on each end, 3) forty -eight new MS
diffusers with 3/4" PVC bushing and 4) forty -
eight each new 1" brass orifice union tees with
3/4" PVC bushing in lower run of tee. Contractor
to assemble air drop components (air leak tight)
install same and perform all work as shown on the
before referenced drawing. City furnished mate-
rials will be on the job site, ready for assembly
by no later than June 6, 1988. Contractor's
warranty does not apply to the above listed City
furnished materials; only Contractors workmanship
warranty applies.
Agreed Lump Sum
Total Additional Cost this Change Order No. 16
Plus Cost of Prior Change Orders
Overrun Supplemental Bid Items as of
April 30, 1988
Original Contract Amount
Revised Contract Amount
Original Completion Date
Extension of Time this Change Order No. 16
Plus Prior Extensions of Time
Revised Completion Date
May 26, 1988
Page 2
Cost
$ 20,234.00
$ 20,234.00
$ 96,645.00
$ 1,605.00
$5,378,600.00
$5,497,084.00
May 24, 1988
0 Calendar Days
51 Calendar Days
July 14, 1988
Change Orders No. 1 thru No. 16 plus Supplemental Bid Items
Overruns represent an increase of 2.20% in the Original Contract
Amount.
® Except as setforth hereinbefore, no conditions or covenants of the
Contract are changed and /or waived hereby.
El
E
v
Change Order No. 16
044 -33 #1
RECOMMENDED FOR APPROVAL:
® LANGFORD ENGINEERING, INC.
By: &a a-4&lAi
Doug nceford
Manager of Field Services
Date: 05- 26-
APPROVED:
CITY OF BAYTOWN
By:
Emmett.0. Hutto
Mayor
Date:
K]
n
May 26, 1988
Page 3
ACCEPTED:
BASIC CONSTRUCTORS, INC.
By:
B
Project Manager
Date: