Loading...
Ordinance No. 4,720ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL AUTHORIZING CHANGE ORDER NO. CHANNEL CONSTRUCTION COMPANY, ® SEWER DISTRICT COLLECTION (CONTRACT NO. 2). 70514 -10 4720 OF THE CITY OF BAYTOWN 2 TO THE CONTRACT WITH INC. FOR THE CENTRAL SYSTEM REHABILITATION BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 to the Contract with Channel Construction Company, Inc. for the Central Sewer District Collection System Rehabilitation (Contract No. 2). A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 14th day of May, ® 1987. �.. ATTEST: 26Z �2 70-' EILEEN P. HALL, City Clerk D, kL_,g" 7y .- torney L �. C:1:20 :10 L \\ E El El KI C CHANGE ORDER NO. 2 70514 -10a May 1, 1987 Mayor Emmett 0. Hutto and City Council City of Baytown 2401 Market Street Baytown, Texas 77520 SUBJECT: Request for Approval of Rates on Labor and /or Materials and /or Equipment. CONTRACTOR: Channel Construction Co., Inc. PROJECT: Sewage Collection System Rehabilitation of Central Sewer District EPA Project No. C -48- 1498 -03 Job No. 044 -33, Contract No. 2 ORIGINAL CONTRACT AMOUNT: $494,499.16 Dear Mayor and City Council: Your approval is requested on the following modifications and /or changes to subject project. These added costs will be applied to the above contract. Repair to recently collapsed 12" concrete pipe sanitary sewer on East James Street from the intersection of Dwinell and East James Street to 750 L.F. West of Dwinell. Concrete breakout and replacement by City. Item Approx. Unit of No. Quan. Measure Description 46. 750 L.F. Cleaning 12" Sewer Pipe, Complete in Place Unit Price Cost $ 2.00 $ 1,500.00 47. 750 L.F. Closed Circuit Tele- vision Inspection of 12" Sewer Pipe, Including Inspection Reports $ 0.50 $ 375.00 EXHI -F A El E, • ❑I 0 r v Change Order No. 2 Item Approx. Unit of 70514 -10b May 1, 1987 Page 2 No. Quan. Measure Description Unit Price Cost 48. 750 L.F. Sliplining 10.750" O.D. Polyethylene Pipe Liner in Exist. 12" Sewer, Complete in Place $ 15.00 $ 11,250.00 49. 15 Ea. Reconnection of Sewer Service Line, 4" & 6" Service Lateral from Sewer to Stack /Wye Connection, All Depths, Complete in Place $ 250.00 $ 3,750.00 50. 1 Ea. Point Repair or Obstruc- tion Removal to 12" Sewer Pipe, 0' -8' Deep, Complete in Place $ 600.00 $ 600.00 51. 88 C.Y. Extra Cement Stabilized Sand Backfill, Complete in Place $ 20.00 $ 1,760.00 52. 10 L.F. Extension of Sewer Ser- vice Laterals, All Sizes, All Depths, Com- plete in Place $ 8.00 $ 80.00 Total Additional Cost Change Order No. 2* $ 19,315.00 Plus Change Order No. 1 $ 0.00 Revised Contract Amount $513,814.16 Your approval is requested on the following request for extension of time. These working days will be applied to the contract. Contractor requests and additional two (2) days off for inclement weather and site conditions. Total additional days requested for Change Order No. 2 - 2, working days. Original Contract Time: 170 Working Days Plus Change Order No. 1: 2 Working Days Original Completion Date: September 22, 1987 New Completion Date: September 26, 1987 n n El r-,I LJ 0 70514 -10c ® Change Order No. 2 May 1, 1987 Page 3 c: 1-1 Change Order Nos. 1 & 2 represent an increase of 3.91% in the Original Contract Amount. Except as setforth hereinbefore, no conditions or covenants of the Contract are changed and /or waived hereby. PREPARED AT REQUEST OF CITY: ACCEPTED: LANGFORD ENGINEERING, INC. APPROVED: CITY OF BAYTOWN, TEXAS B 4ett O. Hutto Mayor Date: CHANNEL CONSTRUCTION CO., INC. By: Date: *Estimated Total Cost of Change Order No. 2. Actual amount to be paid will be based on field measured quantities times applicable unit prices shown. Additional pay items, if required, will be based on unit prices setforth in the Contract. � 11 I J l .J L11