Loading...
Ordinance No. 4,65670224 -1 ORDINANCE NO. 4656 ® AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH BASIC CONSTRUCTORS FOR THE CENTRAL DISTRICT WASTEWATER TREATMENT PLANT (CONTRACT NO. 1). BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 to the Contract with Basic Constructors for the Central District Wastewater Treatment Plant (Contract No. 1). A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ City Council of the February, 1987. ATTEST: and PASSED by the affirmative vote of the City of Baytown, this the 24th day of EILEEN P. HALL, City Clerk • e', • C:1:15:5 IIIMMETT) . Mayor n CHANGE ORDER NO. 1 February 23, 1987 Mr. James J.. Cramer, P.E. Vice President Basic Constructors, Inc. P.O. Box 7771 Houston, Texas 77270 RE: Enlargement of Central Sewer District Wastewater Treatment Plant - EPA Project No. C- 48- 1498- .03,.LEI Job No. 044 -33 Dear Mr. Cramer: The following changes to our existing contract are proposed: ADDITION: Labor and material to re -route approximately 450 linear feet of 24 -inch diameter ductile iron pipe force main along north side of existing clarifier and extending east to existing plant lift.station with appropriate pipe fittings as,shown on LEI set of 3 drawings dated 2- 13 -87, revised 2- 16 -87. Removal and salvage of existing force main is included herein as well as reinstallation of portions of 24 -inch piping to connect to existing manhole north of lift station as a gravity line after making permanent force main connections to new proposed plant headworks. Fence removal and replacement by City. Amount of this proposed Change Order No, l - $ 56,195 Amount of existing contract - 5,378,600 Amount of revised contract $5,434,795 Total calendar days of existing.contract - 470 Calendar days to perform Change Order No. 1 - 14 Revised total calendar days 484 If this proposal is agreeable with Basic Constructors, Inc., please affix your signature in the appropriate space below. Yours very truly, Norman Dykes; P,E. City Engineer /Director of Public Works Approved: Approved: For Basic Constructors; Inc. For City of Baytown Date: Date: EXHIBIT A r� v