Ordinance No. 4,65670224 -1
ORDINANCE NO. 4656
® AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN
AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH
BASIC CONSTRUCTORS FOR THE CENTRAL DISTRICT WASTEWATER
TREATMENT PLANT (CONTRACT NO. 1).
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No. 1 to the Contract with Basic Constructors for
the Central District Wastewater Treatment Plant (Contract No. 1).
A copy of said change order is attached hereto, marked Exhibit
"A," and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately
from and after its passage by the City Council of the City of
Baytown.
INTRODUCED, READ
City Council of the
February, 1987.
ATTEST:
and PASSED by the affirmative vote of the
City of Baytown, this the 24th day of
EILEEN P. HALL, City Clerk
• e', •
C:1:15:5
IIIMMETT) . Mayor
n
CHANGE ORDER NO. 1
February 23, 1987
Mr. James J.. Cramer, P.E.
Vice President
Basic Constructors, Inc.
P.O. Box 7771
Houston, Texas 77270
RE: Enlargement of Central Sewer District Wastewater Treatment Plant -
EPA Project No. C- 48- 1498- .03,.LEI Job No. 044 -33
Dear Mr. Cramer:
The following changes to our existing contract are proposed:
ADDITION: Labor and material to re -route approximately 450 linear
feet of 24 -inch diameter ductile iron pipe force main along north
side of existing clarifier and extending east to existing plant
lift.station with appropriate pipe fittings as,shown on LEI set
of 3 drawings dated 2- 13 -87, revised 2- 16 -87. Removal and salvage
of existing force main is included herein as well as reinstallation
of portions of 24 -inch piping to connect to existing manhole north
of lift station as a gravity line after making permanent force main
connections to new proposed plant headworks. Fence removal and
replacement by City.
Amount
of
this proposed Change Order No, l
- $ 56,195
Amount
of
existing contract -
5,378,600
Amount
of
revised contract
$5,434,795
Total calendar days of existing.contract - 470
Calendar days to perform Change Order No. 1 - 14
Revised total calendar days 484
If this proposal is agreeable with Basic Constructors, Inc., please
affix your signature in the appropriate space below.
Yours very truly,
Norman Dykes; P,E.
City Engineer /Director of Public Works
Approved: Approved:
For Basic Constructors; Inc. For City of Baytown
Date: Date: