Ordinance No. 4,41960327 -13
ORDINANCE NO. 4419
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN
AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH
URANUS PALTON FOR THE STRUCTURAL WORK PERFORMED ON
HOUSING REHABILITATION PROJECT NO. 85- 04 -07, 208 NORTH ST.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 1
to the contract with Uranus Palton for the structural work performed on Housing
Rehabilitation Project #85- 04-07, 208 North St., for the City of Baytown. A copy
of said change order is attached hereto marked "Exhibit A," and made a part hereof
for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its
passage by the City Council of the City of Baytown.
INTRODUCED, READ, and PASSED by the affirmative vote of the City
Council of the City of Baytown, on this the 27th day of March, 1986.
C46 O. HUT O, Mayo
ATTEST:
EILEEN P. HALL, City Clerk
APPROVED:
P ty
NG
60327 -13a
Community Development Program
Housing Rehabilitation Project
Change Order
Project 85 -04 -07 Date
Homeowner Ethel M. Travis Address
Contractor Uranus Palton
3/24/86
208 North 5t.
The following changes to the contract for this project are needed:
1.
Remove approximately 50 feet of termite
infested interior
and exterior walls, including all studs,
wall coverings
and siding.
$425.00
2.
Install new wall studs on 16" centers.
On exterior,
install vapor barrier, plywood covering,
and asbestos
siding to match existing. On interior,
install sheet -
rock, tape and float all joints.
1,500.00
3.
Treat entire structure for termites to prevent
further
damage. Treatment to be performed by licensed
pest
control company.
450.00
4.
Repair deteriorated roof eaves.
125.00
Original Contract Price $10,256.00
Cost of Change Order 2,500.00
New Contract Price $12,756.00
Approved by: IL4�4
To unity Ttcl-65-m-ent Planner
Director of Planning & Traffic
City Manager