Loading...
Ordinance No. 4,18850627 -9 ORDINANCE NO. 4188 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. 2 TO THE CONTRACT WITH ANGEL BROTHERS CONSTRUCTION FOR THE 1985 STREET IMPROVEMENT PROGRAM. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 to the contract with Angel Brothers Construction for the 19B5 Street Improvement Program for the City of Baytown. A copy of said change order is attached hereto marked "Exhibit A ", and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, on this the 27th day of June, 1985. METT O. HUTTO, Wyor ATTEST: LEEN P. HALL, City -Clerk APPROVED: AfVDALL B. STRONG, Attorney 50627 -9a Change Order Aso. 2 19`,5 Street Irnpr ovement Program Jot.. So. 8501 -01 Jur:e 25, 1985 Angel Brothers,lnc. .. F. 0. B ^i: 3926 F-j' town, Texas 775203 Gentlefoen: The City of Baytown proposes to ADD the following items to the above titled contract. Item Appr-o... Unit of Unit No. Quant. Measure Descrit-tion Price Extension 96 Tons Hot mix asphaltic cone, $35.030 $31360.00 $212.30 $3,568.95 $8,349.00 $8, 8(30, ran $1,SO().00 1.5" (170 lbs /5.y. ) including blading shoul- ders 2` wide, CIF 4 193 Gal. Asphaltic material, prime $1.10 or tacl-. coat (0.17 galls.y., SIC- -30 or ItC -2) , CIP 6 1,133 S.Y. Reconstruct existing base $3.15 material to a depth of 8" including lime and lime stabilisation (30 lbs /s.y.) as per specs, CIP 7 506 Tons Crushed limestone vase $16.50 material, CIP L.F. Concrete curb and gutter $11.00 with 4" cement stabili -zed sand bedding including saw cutting, removal of existing concrete, hauling and excavation, GIP 14 2r r[} C.Y. Salvage existing base material $9.04 and haul to designated site CIP 15 2810 C. Y. Excavation of material (subgrade) & haul to designated site, CIP $212.30 $3,568.95 $8,349.00 $8, 8(30, ran $1,SO().00 22 Lime stabilize subgr'ade of road and part- --.ing lots at Aii'ba -L't Park to a depth of 8" including line and lime stabilization (30 lbs /s.y.) as per specs, CIE, Total 50627 -9b 52.10 52,379.3E $29,939.555 Original Contract Amount $612,725.85 Char,ze Order Humber- 1 $16,030.2 -0 Charize Order 141 -u nber 2 $24,43g.55 AmEnded Contract Arr,:junt $6581,745.60 If this chanige meets with ycuc' approval, please Sign bL -losr and r•etuT.n this documient to the E-ngine.ering Department. A signed copy will be sent to ycU. APPROVED city of Baytown Sincerely, Norman Dykes, P.E. City Engineer /Director of Public APPROVED Angel Brotbex's, iric. By. D,_<< Date;