Loading...
Ordinance No. 3,845r ORDINANCE NO. 3845 AN ORDNANCE OF Ti-E CITY CDLPX:IL OF THE CITY OF BAYTOM APPROVM A CHMIGE ORDER TO THE CONTRACT ETWEpM HISS COUNTY FLOOD CONTROL DIS7R1r.T AND BAYTEX CONSTR� FOR THE BAYWAY DRIVE /BAKER ROAD DRAINAGE DITCH PRO�XCT. �+►�.f ••ss+� *. err ttt+r�►ts�c.•���•w��•#.s.+r.•r. �f.. rrfr��. a•ws.�ter.e..sf..a+►w+►.s�ri►�r WHEREAS, a redesign of a portion of the Bayway Drive /Baker Road Drainage Ditch Project is necessary, and WHEREAS, the redesign requires a change order between the Harris County Flood Control District and it9 contractor, end will result ir an increase of $13,830.00 in the City's share of this project; NOW Tl- EREFDRE, BE IT ORDAINED BY THE CITY COLDICIL OF THE CITY OF BAYTOMI, TEXAS: Section 1: That the City Council does hereby approve the change order to the contract between Harris County Flood Control District and Baytex Construction for the Bayway Drive /Baker Road Drainage Ditch Project. A copy of said change order is attached hereto marked "Exhibit A", and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, on this the 10th day of May, 1984. CT— it ggt APPROVED: i r E t�lo April 9, 1984 40510 -3a (Ship Baytex Oxwtrctin Q�pay G 101 -0-0 Aaue To . 3501 Beyway Drive, Bayttxm, Tx. 77320 + 1 Flood Cwtrol. it n dddm 0153217 8310629 F=d 1982 Bond Fimd 9731 Ltndho m: is eoeaeetion with 7owr eoatraetw Sept. 1, 1983 +�•• tba eaedetaetlaa d the abm =wdowd jobs the wart or matcrW aAam d blow was ant eomo�prdab ed in the mf&d eoetiset. w the _aumbig dadtHd= k d, - NIL When foie order bu ban panpertq Mid M. No apgtcovedr yott wM Please Peoered to db this work in aeeoe+aaaes with the atteeation ad oat below- to uwlude detailed taodpted hivabw and pay rose woes bMWg an an eoet plan aza-ma DESCRIPTION OF CHANGE DESIRED j Wd: 3,000 Sg.Yd. of 4" Concrete Slope Paving, Double 9'x7' Box Transition lb&f3cation,_ ® j n and Cement Stabilized Sand- Add: 60 Working asys this Change Order and the agreed time extension and compensation: hereof constitutes full gad gcWlete payment of an costs, direct and indirect, 1nclu'�ng casts, if any, associated with delays, investigations, impact on other work, and any other cost or time considerations whatsoever associated with this chap Add: 4" Conc. Slope paving 3,000 Sq.Ya 0 $".00 1S .Yd. 9 10 010 0 0 0 Add: Double 9'x7' Box Transition ftdifica ion Lump S '3 13 8 3 0 0 O Add: Cement Stab. Sand 50 .Ors Le $ O.00jton 1 G 0 0 0 0 TOTAL ADDED TO CONTRACT 1 0 4 1 8 3 0 0 0 TOTAL DEDUCTED FROM CONTRACT )Thad- are or wW be ava"We to meet this obltsatba whw due. Approved • am.at � w aeeeraete �V •trtw 318810 gad Work t Approve D' ectOr 31MttJtleaniM' Dar n. cestnetw Authorized to l[louts0 at Baytex Construction Company Auditoe s Yge Numbers._ 40 O+titnel to Oeotsaetor. i Yellow Capin to Auditor. Pink Copy to Artalteet0 or Eughwar. Orem Cqy to Ptt+esadog JWVL C