Ordinance No. 3,845r
ORDINANCE NO. 3845
AN ORDNANCE OF Ti-E CITY CDLPX:IL OF THE CITY OF BAYTOM
APPROVM A CHMIGE ORDER TO THE CONTRACT ETWEpM HISS
COUNTY FLOOD CONTROL DIS7R1r.T AND BAYTEX CONSTR�
FOR THE BAYWAY DRIVE /BAKER ROAD DRAINAGE DITCH
PRO�XCT.
�+►�.f ••ss+� *. err ttt+r�►ts�c.•���•w��•#.s.+r.•r. �f.. rrfr��. a•ws.�ter.e..sf..a+►w+►.s�ri►�r
WHEREAS, a redesign of a portion of the Bayway Drive /Baker Road Drainage
Ditch Project is necessary, and
WHEREAS, the redesign requires a change order between the Harris County
Flood Control District and it9 contractor, end will result ir an increase of $13,830.00
in the City's share of this project; NOW Tl- EREFDRE,
BE IT ORDAINED BY THE CITY COLDICIL OF THE CITY OF BAYTOMI,
TEXAS:
Section 1: That the City Council does hereby approve the change order to
the contract between Harris County Flood Control District and Baytex Construction
for the Bayway Drive /Baker Road Drainage Ditch Project. A copy of said change
order is attached hereto marked "Exhibit A", and made a part hereof for all intents
and purposes.
Section 2: This ordinance shall take effect immediately from and after its
passage by the City Council of the City of Baytown.
INTRODUCED, READ, and PASSED by the affirmative vote of the City
Council of the City of Baytown, on this the 10th day of May, 1984.
CT—
it
ggt
APPROVED:
i
r
E
t�lo April 9, 1984
40510 -3a
(Ship
Baytex Oxwtrctin Q�pay G 101 -0-0 Aaue To .
3501 Beyway Drive, Bayttxm, Tx. 77320 + 1 Flood Cwtrol.
it n dddm 0153217 8310629 F=d 1982 Bond Fimd 9731
Ltndho m: is eoeaeetion with 7owr eoatraetw Sept. 1, 1983 +�•• tba eaedetaetlaa d
the abm =wdowd jobs the wart or matcrW aAam d blow was ant eomo�prdab ed in the mf&d eoetiset. w
the _aumbig dadtHd= k d, - NIL
When foie order bu ban panpertq Mid M. No apgtcovedr yott wM Please Peoered to db this work in aeeoe+aaaes
with the atteeation ad oat below-
to uwlude detailed taodpted hivabw and pay rose woes bMWg an an eoet plan aza-ma
DESCRIPTION OF CHANGE DESIRED j
Wd: 3,000 Sg.Yd. of 4" Concrete Slope Paving, Double 9'x7' Box Transition lb&f3cation,_
® j
n
and Cement Stabilized Sand-
Add: 60 Working asys
this Change Order and the agreed time extension and compensation: hereof constitutes full gad
gcWlete payment of an costs, direct and indirect, 1nclu'�ng casts, if any, associated with
delays, investigations, impact on other work, and any other cost or time considerations
whatsoever associated with this chap
Add: 4" Conc. Slope paving
3,000 Sq.Ya
0 $".00 1S
.Yd.
9
10 010
0
0
0
Add: Double 9'x7' Box Transition
ftdifica
ion Lump S
'3
13
8
3
0
0
O
Add: Cement Stab. Sand
50 .Ors Le $
O.00jton
1
G
0
0
0
0
TOTAL ADDED TO CONTRACT
1
0
4 1
8
3
0
0
0
TOTAL DEDUCTED FROM CONTRACT
)Thad- are or wW be ava"We to meet this obltsatba whw due.
Approved
• am.at � w aeeeraete
�V •trtw
318810 gad Work t Approve
D' ectOr 31MttJtleaniM'
Dar n. cestnetw Authorized to l[louts0 at
Baytex Construction Company
Auditoe s Yge Numbers._
40 O+titnel to Oeotsaetor. i Yellow Capin to Auditor. Pink Copy to Artalteet0 or Eughwar. Orem Cqy to Ptt+esadog JWVL