Ordinance No. 3,779ORDINANC€ NO. 3779
44223 -3
AN ORDINANCE OF THE CITY COL*4CIL OF THE CITY OF
BAYTOWN, TEXAS, AUTHORIZING CHANCE OROM NO. I TO THE
CONTRACT WITH JOHN KIDD FOR THE REI•V NLITATEN OF ii71i5
MARYLAND.
a�tttwfa����s�rExtr• s�r�+ rs��►Rww�r *wwarws��rt��►kRf�� ►* *mss *�►sk�f�sR�wfiattaata ;�t
Section l: That the City Council does hereby authorize Change Order No. 1
to the contract with John Kidd for the rehabilitation of 1705 Maryland. A copy of
f. said change order is attached hereto marked "Exhibit A", and made a part hereof
for all intents and purposss.
Section 2: This ordinance shall take effect immediately from and after its
passage by the City Council of the City of Baytown.
INTRODUCED, READ, and PASSED by the affirmative vote of the City
Council of the City of Baytown, this the 23rd day of February, 1984.
ATTEST:
ERJEEN P. HALL, City Clerk
APPROVED:
IL 4;2 s ity t y
Community Development Program
Housing Rehabilitation Project
Change Order
Project 1 83 -04 -08
Hometiwner Filiberto Tijerina
• Contractor John Kidd
40223 -3a
Date February 10, 1984
Address 1705 land
The following changes to the contract for this project are needed:
1. Install braces in attic to provide additional support for roof
2. Replace deteriorated wall studs. wall studs replaced were
insect, water, and heat damaged. Malfunction of will
heater caused the charring of surrounding wall studs.
3. Remove existing gas wall heater and vent stack. Install
a new gas wall heater of comparable Size and B.T.U.
rating, including a blower unit, vent stack and
thermostat (Permit Required). The vent for this
heater runs inside the wall and was deteriorated,
causing the heater to malfunction and o,�erheat.
Replacement is required by H.U.D.
S 180.00
$ 170.00
$ 964.00
Original Contract Price $ 5,910.00
Cost of Change Order 1.314.00
New Contract Price 7.224.00
Appr:,.ed by:
orrnuvl nQV o ent Planner
Director of Planning 8 Traffic
City Manager
lArri6ij A