Loading...
Ordinance No. 3,779ORDINANC€ NO. 3779 44223 -3 AN ORDINANCE OF THE CITY COL*4CIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANCE OROM NO. I TO THE CONTRACT WITH JOHN KIDD FOR THE REI•V NLITATEN OF ii71i5 MARYLAND. a�tttwfa����s�rExtr• s�r�+ rs��►Rww�r *wwarws��rt��►kRf�� ►* *mss *�►sk�f�sR�wfiattaata ;�t Section l: That the City Council does hereby authorize Change Order No. 1 to the contract with John Kidd for the rehabilitation of 1705 Maryland. A copy of f. said change order is attached hereto marked "Exhibit A", and made a part hereof for all intents and purposss. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 23rd day of February, 1984. ATTEST: ERJEEN P. HALL, City Clerk APPROVED: IL 4;2 s ity t y Community Development Program Housing Rehabilitation Project Change Order Project 1 83 -04 -08 Hometiwner Filiberto Tijerina • Contractor John Kidd 40223 -3a Date February 10, 1984 Address 1705 land The following changes to the contract for this project are needed: 1. Install braces in attic to provide additional support for roof 2. Replace deteriorated wall studs. wall studs replaced were insect, water, and heat damaged. Malfunction of will heater caused the charring of surrounding wall studs. 3. Remove existing gas wall heater and vent stack. Install a new gas wall heater of comparable Size and B.T.U. rating, including a blower unit, vent stack and thermostat (Permit Required). The vent for this heater runs inside the wall and was deteriorated, causing the heater to malfunction and o,�erheat. Replacement is required by H.U.D. S 180.00 $ 170.00 $ 964.00 Original Contract Price $ 5,910.00 Cost of Change Order 1.314.00 New Contract Price 7.224.00 Appr:,.ed by: orrnuvl nQV o ent Planner Director of Planning 8 Traffic City Manager lArri6ij A